Multifunctional temporary wharf and construction method
The multifunctional temporary wharf comprises a first steel pipe pile, a second steel pipe pile and a floating type parking platform, the second steel pipe pile is arranged on one side of the first steel pipe pile, and a third steel pipe pile is arranged on the side, away from the second steel pipe pile, of the first steel pipe pile; supporting frames are transversely installed in the first steel pipe piles, the second steel pipe piles and the third steel pipe piles, inclined supporting rods are arranged at the top ends of the supporting frames, parallel connection platforms are arranged at the top ends of the first steel pipe piles and the top ends of the third steel pipe piles, and Bailey main longitudinal beam supports are arranged at the top ends of the third steel pipe piles. According to the device, the first crawling ladder is adopted at the position of the floating type berthing platform, the channel can go up and down, when the floating type berthing platform floats, the channel moves along with the floating type berthing platform, passing is convenient, the floating type berthing platform can change along with the change of the water level, the temporary berthing requirement of a small ship is met, and the berthing pressure is effectively relieved.
本发明公开了一种多功能临时码头,包括第一钢管桩、第二钢管桩和浮式停靠平台,所述第一钢管桩的一侧设置有第二钢管桩,所述第一钢管桩远离第二钢管桩的一侧设置有第三钢管桩,所述第一钢管桩、第二钢管桩和第三钢管桩的内部横向安装有支撑架,且支撑架的顶端设置有斜撑杆,所述第一钢管桩和第三钢管桩的顶端设置有平联平台,所述第三钢管桩的顶端设置有贝雷主纵梁撑,且贝雷主纵梁撑的顶端设置有平台面板,该装置具有浮式停靠平台处采用第一爬梯可上下通道,当浮式停靠平台处浮动时,则通道随着移动,方便通行,而浮式停靠平台处可随水位变化而变化,满足小型船舶临时靠泊需求,有效缓解靠泊压力。
Multifunctional temporary wharf and construction method
The multifunctional temporary wharf comprises a first steel pipe pile, a second steel pipe pile and a floating type parking platform, the second steel pipe pile is arranged on one side of the first steel pipe pile, and a third steel pipe pile is arranged on the side, away from the second steel pipe pile, of the first steel pipe pile; supporting frames are transversely installed in the first steel pipe piles, the second steel pipe piles and the third steel pipe piles, inclined supporting rods are arranged at the top ends of the supporting frames, parallel connection platforms are arranged at the top ends of the first steel pipe piles and the top ends of the third steel pipe piles, and Bailey main longitudinal beam supports are arranged at the top ends of the third steel pipe piles. According to the device, the first crawling ladder is adopted at the position of the floating type berthing platform, the channel can go up and down, when the floating type berthing platform floats, the channel moves along with the floating type berthing platform, passing is convenient, the floating type berthing platform can change along with the change of the water level, the temporary berthing requirement of a small ship is met, and the berthing pressure is effectively relieved.
本发明公开了一种多功能临时码头,包括第一钢管桩、第二钢管桩和浮式停靠平台,所述第一钢管桩的一侧设置有第二钢管桩,所述第一钢管桩远离第二钢管桩的一侧设置有第三钢管桩,所述第一钢管桩、第二钢管桩和第三钢管桩的内部横向安装有支撑架,且支撑架的顶端设置有斜撑杆,所述第一钢管桩和第三钢管桩的顶端设置有平联平台,所述第三钢管桩的顶端设置有贝雷主纵梁撑,且贝雷主纵梁撑的顶端设置有平台面板,该装置具有浮式停靠平台处采用第一爬梯可上下通道,当浮式停靠平台处浮动时,则通道随着移动,方便通行,而浮式停靠平台处可随水位变化而变化,满足小型船舶临时靠泊需求,有效缓解靠泊压力。
Multifunctional temporary wharf and construction method
一种多功能临时码头及施工方法
LI YOUWEI (Autor:in) / XIE DEKUAN (Autor:in) / TAO SHENGQIANG (Autor:in) / LUO JINCHENG (Autor:in) / REN WANSHENG (Autor:in) / XIAO YIZHOU (Autor:in) / ZANG JIANFENG (Autor:in) / YIN HONGYANG (Autor:in) / XU SILE (Autor:in) / MAO JUNWEI (Autor:in)
09.08.2024
Patent
Elektronische Ressource
Chinesisch
Bottom-supported temporary wharf caisson shipping method
Europäisches Patentamt | 2024
|Construction method of temporary construction channel based on shore-based high-pile wharf