Self-insulation wall constructional column and insulation brick integrated construction method
The invention discloses a self-insulation wall constructional column and insulation brick integrated construction method, and relates to the technical field of building construction.The self-insulation wall constructional column and insulation brick integrated construction method comprises a back plate and a sealing plate, the back plate is provided with an inner cavity used for installing an insulation plate, and the sealing plate seals the inner cavity. The wall building blocks are chamfered, so that combed joints reserved in the wall are matched with the inner cavities in the back plate in shape; cutting and trepanning the insulation board according to the shape of the inner cavity; the insulation board is mounted in the inner cavity of the backboard; the back plates and the building blocks are built together, the back plates are sequentially installed at the positions, where constructional columns are reserved, of the wall bodies, the inner cavities provided with the heat preservation plates are located between the wall bodies, and the back plates and the sealing plates are located on the two sides of the wall bodies to seal the reserved space of the constructional columns; constructional column concrete is poured; the back plate and the sealing plate are dismantled; formwork unitization and modularization are achieved, dismounting and mounting are easy and convenient, the machining and mounting time of a traditional constructional column wood back plate is saved, meanwhile, the aluminum formwork replaces a story pole, labor is saved on the whole, and construction and management efficiency is improved.
本发明公开了一种自保温墙体构造柱与保温砖一体化施工方法,涉及建筑施工技术领域,包括背板和封板,所述背板上设置有用于安装保温板的内腔,所述封板将内腔封闭,施工方法采用以下步骤:定型化模具生产;墙体砌块切角,使得墙体上预留的马牙槎与背板上内腔形状适配;根据内腔形状对保温板进行切割及开孔;保温板安装入背板内腔;与砌块一起砌筑,将背板依次安装到墙体预留构造柱的位置,装有保温板的内腔位于墙体之间,将背板和封板位于墙体两侧将构造柱预留空间封闭;浇筑构造柱混凝土;拆除背板和封板;模板单元化、模块化,拆装简便,节省传统构造柱木背板加工、安装时间,同时铝模替代皮数杆作用,总体上节约人工、提高施工与管理效率。
Self-insulation wall constructional column and insulation brick integrated construction method
The invention discloses a self-insulation wall constructional column and insulation brick integrated construction method, and relates to the technical field of building construction.The self-insulation wall constructional column and insulation brick integrated construction method comprises a back plate and a sealing plate, the back plate is provided with an inner cavity used for installing an insulation plate, and the sealing plate seals the inner cavity. The wall building blocks are chamfered, so that combed joints reserved in the wall are matched with the inner cavities in the back plate in shape; cutting and trepanning the insulation board according to the shape of the inner cavity; the insulation board is mounted in the inner cavity of the backboard; the back plates and the building blocks are built together, the back plates are sequentially installed at the positions, where constructional columns are reserved, of the wall bodies, the inner cavities provided with the heat preservation plates are located between the wall bodies, and the back plates and the sealing plates are located on the two sides of the wall bodies to seal the reserved space of the constructional columns; constructional column concrete is poured; the back plate and the sealing plate are dismantled; formwork unitization and modularization are achieved, dismounting and mounting are easy and convenient, the machining and mounting time of a traditional constructional column wood back plate is saved, meanwhile, the aluminum formwork replaces a story pole, labor is saved on the whole, and construction and management efficiency is improved.
本发明公开了一种自保温墙体构造柱与保温砖一体化施工方法,涉及建筑施工技术领域,包括背板和封板,所述背板上设置有用于安装保温板的内腔,所述封板将内腔封闭,施工方法采用以下步骤:定型化模具生产;墙体砌块切角,使得墙体上预留的马牙槎与背板上内腔形状适配;根据内腔形状对保温板进行切割及开孔;保温板安装入背板内腔;与砌块一起砌筑,将背板依次安装到墙体预留构造柱的位置,装有保温板的内腔位于墙体之间,将背板和封板位于墙体两侧将构造柱预留空间封闭;浇筑构造柱混凝土;拆除背板和封板;模板单元化、模块化,拆装简便,节省传统构造柱木背板加工、安装时间,同时铝模替代皮数杆作用,总体上节约人工、提高施工与管理效率。
Self-insulation wall constructional column and insulation brick integrated construction method
自保温墙体构造柱与保温砖一体化施工方法
XIONG LI (Autor:in) / HUANG YONGDONG (Autor:in) / YANG CHEN (Autor:in) / LI JIANWEI (Autor:in) / CHEN GUO (Autor:in) / YANG WEIAN (Autor:in) / ZHOU LIN (Autor:in) / LI JIANHUA (Autor:in) / YANG XIONG (Autor:in) / OH YOON-SUK (Autor:in)
09.08.2024
Patent
Elektronische Ressource
Chinesisch
Constructional column broken bridge heat insulation structure and heat insulation method
Europäisches Patentamt | 2023