Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of special-shaped air corridor structure
The invention discloses a construction method of a special-shaped air corridor structure, which belongs to the technical field of building construction and comprises the following steps: 1) building a corridor; 2) arranging a lifting system; (3) lifting; (4) temporary connection; (5) adjusting the position; (6) unloading; (7) adjusting again; (8) vacancy filling; (9) triangular support pouring is conducted; (10) the whole corridor is vacant; (11) the temporary connecting device is dismantled; the method aims at solving the problem that in an existing air corridor structure overall lifting construction method, when an overall lifting corridor is connected with towers, due to adverse factors such as different height differences of reserved butt joint embedded parts on the two sides of the towers and lifting errors of the steel corridor, the safety of the air corridor is affected.
本发明公开了一种异形空中连廊结构的施工方法,属于建筑施工技术领域,包括如下步骤,1)、连廊搭设;2)、布置提升系统;3)、提升;4)、临时连接;5)、位置调节;6)、卸载;7)、再次调节;8)、补缺;9)、三角支撑浇筑;10)、连廊整体补缺;11)、拆除临时连接装置;其目的在于解决现有空中连廊结构整体提升施工方法中,整体提升连廊与塔楼连接时由于两侧塔楼侧预留对接埋件高差不一、钢连廊提升误差等不利因素,从而影响空中连廊安全性的问题。
Construction method of special-shaped air corridor structure
The invention discloses a construction method of a special-shaped air corridor structure, which belongs to the technical field of building construction and comprises the following steps: 1) building a corridor; 2) arranging a lifting system; (3) lifting; (4) temporary connection; (5) adjusting the position; (6) unloading; (7) adjusting again; (8) vacancy filling; (9) triangular support pouring is conducted; (10) the whole corridor is vacant; (11) the temporary connecting device is dismantled; the method aims at solving the problem that in an existing air corridor structure overall lifting construction method, when an overall lifting corridor is connected with towers, due to adverse factors such as different height differences of reserved butt joint embedded parts on the two sides of the towers and lifting errors of the steel corridor, the safety of the air corridor is affected.
本发明公开了一种异形空中连廊结构的施工方法,属于建筑施工技术领域,包括如下步骤,1)、连廊搭设;2)、布置提升系统;3)、提升;4)、临时连接;5)、位置调节;6)、卸载;7)、再次调节;8)、补缺;9)、三角支撑浇筑;10)、连廊整体补缺;11)、拆除临时连接装置;其目的在于解决现有空中连廊结构整体提升施工方法中,整体提升连廊与塔楼连接时由于两侧塔楼侧预留对接埋件高差不一、钢连廊提升误差等不利因素,从而影响空中连廊安全性的问题。
Construction method of special-shaped air corridor structure
一种异形空中连廊结构的施工方法
WANG XIAOLIN (Autor:in) / ZHANG MING (Autor:in) / CAO WENGEN (Autor:in) / MA YUEYANG (Autor:in) / MIAO FENG (Autor:in) / LI ZI'ANG (Autor:in) / CHEN RUI (Autor:in) / YANG XU (Autor:in) / ZHAO YUCHAO (Autor:in)
09.08.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for large-span special-shaped steel structure corridor
Europäisches Patentamt | 2024
|Construction method of court large-span arc-shaped steel structure corridor
Europäisches Patentamt | 2023
|Construction method of overhead corridor and overhead corridor structure
Europäisches Patentamt | 2021
|Fabricated corridor, corridor end connecting structure and construction method
Europäisches Patentamt | 2023
|