PHC pipe pile and cement soil composite pile construction method
The invention discloses a construction method of a composite pile of a PHC pipe pile and cemented soil. The construction method comprises the steps that a construction site is leveled and tamped; drilling operation is conducted through a long spiral drilling machine, and meanwhile a grouting pipe is inserted; after the grouting pipe is placed into the soil layer by a preset depth, the drill rod is lifted, continuous high-pressure grouting is conducted from bottom to top through the grouting pipe, on-site undisturbed soil and cement paste are stirred to form a cement-soil cementing material, and a high-pressure jet grouting pile section is formed on the lower portion of the drilled hole; and before the cement soil cementing material is initially set, a PHC pipe pile is pressed into the high-pressure jet grouting pile section through a static pressure pile machine, so that the PHC pipe pile is implanted into the high-pressure jet grouting pile section. The problem that noise is large when the PHC prestressed pipe pile is constructed through a hammering method is solved.
本发明公开了一种PHC管桩与水泥土的复合桩施工方法,包括:施工场地平整和夯实;通过长螺旋钻机进行钻孔作业,同时插入注浆管;在所述注浆管置入土层预定深度后,提升钻杆并通过注浆管自下而上连续高压注浆,利用现场原状土和水泥浆搅拌形成水泥土胶凝材料,于钻孔的下部形成高压旋喷桩段;在所述水泥土胶凝材料初凝之前,通过静压桩机将PHC管桩压入所述高压旋喷桩段内,使得所述PHC管桩植入所述高压旋喷桩段中。本发明解决了PHC预应力管桩采用锤击法施工存在噪音大的问题。
PHC pipe pile and cement soil composite pile construction method
The invention discloses a construction method of a composite pile of a PHC pipe pile and cemented soil. The construction method comprises the steps that a construction site is leveled and tamped; drilling operation is conducted through a long spiral drilling machine, and meanwhile a grouting pipe is inserted; after the grouting pipe is placed into the soil layer by a preset depth, the drill rod is lifted, continuous high-pressure grouting is conducted from bottom to top through the grouting pipe, on-site undisturbed soil and cement paste are stirred to form a cement-soil cementing material, and a high-pressure jet grouting pile section is formed on the lower portion of the drilled hole; and before the cement soil cementing material is initially set, a PHC pipe pile is pressed into the high-pressure jet grouting pile section through a static pressure pile machine, so that the PHC pipe pile is implanted into the high-pressure jet grouting pile section. The problem that noise is large when the PHC prestressed pipe pile is constructed through a hammering method is solved.
本发明公开了一种PHC管桩与水泥土的复合桩施工方法,包括:施工场地平整和夯实;通过长螺旋钻机进行钻孔作业,同时插入注浆管;在所述注浆管置入土层预定深度后,提升钻杆并通过注浆管自下而上连续高压注浆,利用现场原状土和水泥浆搅拌形成水泥土胶凝材料,于钻孔的下部形成高压旋喷桩段;在所述水泥土胶凝材料初凝之前,通过静压桩机将PHC管桩压入所述高压旋喷桩段内,使得所述PHC管桩植入所述高压旋喷桩段中。本发明解决了PHC预应力管桩采用锤击法施工存在噪音大的问题。
PHC pipe pile and cement soil composite pile construction method
PHC管桩与水泥土的复合桩施工方法
GAO YUFENG (Autor:in) / XU JIANFENG (Autor:in) / LYU MING (Autor:in) / LI HONGJIE (Autor:in) / YANG SONGHAO (Autor:in) / CHEN CHAO (Autor:in) / ZHAO XIAONING (Autor:in) / ZHANG HAOTIAN (Autor:in)
13.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Combined foundation pile composed of steel pipe pile and cement soil pile
Europäisches Patentamt | 2021
|