Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Control system for integral pushing of steel structure arch bridge
The invention discloses a steel structure arch bridge integral pushing control system which comprises a supporting plate, a first jack, a second jack, a pushing mechanism and an auxiliary mechanism, the pushing mechanism comprises the second jack, the second jack is movably arranged at the top of the supporting plate, electric pushing machines are further symmetrically installed at the top of the supporting plate, and the auxiliary mechanism is connected with the electric pushing machines. Connecting plates are installed at the two ends of the second jack, an iron rod is installed at the end of a telescopic rod of the electric pushing machine, the end, away from the electric pushing machine, of the iron rod is connected with the connecting plates, the auxiliary mechanism comprises strip-shaped grooves, the strip-shaped grooves are symmetrically formed in the supporting plate, and a plurality of fixed rotating rods are symmetrically arranged in the strip-shaped grooves; according to the high-rise building translation device, the main machine is controlled to reversely push the building to synchronously translate along the slide way, so that the high-rise building can be prevented from settling and overturning in the translation process.
本发明公开一种钢结构拱桥整体顶推的控制系统,包括支撑板、第一千斤顶、第二千斤顶、顶推机构和辅助机构,所述顶推机构包括第二千斤顶,所述第二千斤顶活动设置在支撑板的顶部,所述支撑板的顶部还对称安装有电推机,所述第二千斤顶的两端均安装有连接板,所述电推机的伸缩杆端部安装有铁杆,所述铁杆远离电推机的一端与连接板连接,所述辅助机构包括条型槽,所述支撑板的内部对称安装有条型槽,所述条型槽的内部对称设置有若干个固定转动杆,所述固定转动杆的内部均活动设置有与第二千斤顶配合使用的滚轮,本发明通过控制主机使其反向顶推建筑物沿滑道进行同步平移的双重手段,从而能够防止高耸建筑物在平移过程中发生沉降及倾覆。
Control system for integral pushing of steel structure arch bridge
The invention discloses a steel structure arch bridge integral pushing control system which comprises a supporting plate, a first jack, a second jack, a pushing mechanism and an auxiliary mechanism, the pushing mechanism comprises the second jack, the second jack is movably arranged at the top of the supporting plate, electric pushing machines are further symmetrically installed at the top of the supporting plate, and the auxiliary mechanism is connected with the electric pushing machines. Connecting plates are installed at the two ends of the second jack, an iron rod is installed at the end of a telescopic rod of the electric pushing machine, the end, away from the electric pushing machine, of the iron rod is connected with the connecting plates, the auxiliary mechanism comprises strip-shaped grooves, the strip-shaped grooves are symmetrically formed in the supporting plate, and a plurality of fixed rotating rods are symmetrically arranged in the strip-shaped grooves; according to the high-rise building translation device, the main machine is controlled to reversely push the building to synchronously translate along the slide way, so that the high-rise building can be prevented from settling and overturning in the translation process.
本发明公开一种钢结构拱桥整体顶推的控制系统,包括支撑板、第一千斤顶、第二千斤顶、顶推机构和辅助机构,所述顶推机构包括第二千斤顶,所述第二千斤顶活动设置在支撑板的顶部,所述支撑板的顶部还对称安装有电推机,所述第二千斤顶的两端均安装有连接板,所述电推机的伸缩杆端部安装有铁杆,所述铁杆远离电推机的一端与连接板连接,所述辅助机构包括条型槽,所述支撑板的内部对称安装有条型槽,所述条型槽的内部对称设置有若干个固定转动杆,所述固定转动杆的内部均活动设置有与第二千斤顶配合使用的滚轮,本发明通过控制主机使其反向顶推建筑物沿滑道进行同步平移的双重手段,从而能够防止高耸建筑物在平移过程中发生沉降及倾覆。
Control system for integral pushing of steel structure arch bridge
一种钢结构拱桥整体顶推的控制系统
GUO HONGCUN (Autor:in) / SUN QING (Autor:in) / WANG ZHANGLEI (Autor:in) / CHEN HAO (Autor:in) / LAI JIEWEI (Autor:in) / XIAO HAN (Autor:in)
16.08.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Integral installation and construction process for steel structure arch bridge
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Integral manufacturing method of curved steel arch bridge
Europäisches Patentamt | 2024
|