Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Unit type curtain wall hoisting device
The invention discloses a unit type curtain wall hoisting device which comprises a track, a combined type loop chain electric hoist is arranged on the track, a plurality of cantilever beams are arranged above the track, a tying mechanism is connected between the cantilever beams and the track, two fixing mechanisms are arranged on each cantilever beam, a tensioning mechanism is arranged on each cantilever beam, and a lifting mechanism is arranged on the track. A traction mechanism is arranged on the side, away from the cantilever beam, of the tensioning mechanism. Construction and assembly are convenient, worker operation is more convenient, the problems that traditional curtain wall vertical transportation, installation and construction are inconvenient, the construction period is long, and manpower and material resource consumption is large are solved, the working intensity of workers is greatly reduced, the site construction progress is accelerated, the safety of curtain wall vertical transportation and construction is also improved, and the device can be repeatedly used and is worthy of popularization. Manpower and material resource consumption is reduced, and construction cost is reduced.
本发明公开了一种单元式幕墙吊装装置,包括轨道,所述轨道上设有组合式环链电动葫芦,所述轨道的上方设有多个悬挑梁,所述悬挑梁与轨道之间连接有拉结机构,所述悬挑梁上设有两个固定机构,所述悬挑梁上设有拉紧机构,所述拉紧机构远离悬挑梁的一侧设有牵拉机构。本发明施工组装方便,工人操作更加便捷,解决了传统幕墙垂直运输安装施工不便、施工周期长、人力物力消耗大的问题,大大降低了工人的工作强度,加快现场施工进度,也提高了幕墙垂直运输施工的安全性,且装置可重复周转使用,降低人力物力消耗,减少施工成本。
Unit type curtain wall hoisting device
The invention discloses a unit type curtain wall hoisting device which comprises a track, a combined type loop chain electric hoist is arranged on the track, a plurality of cantilever beams are arranged above the track, a tying mechanism is connected between the cantilever beams and the track, two fixing mechanisms are arranged on each cantilever beam, a tensioning mechanism is arranged on each cantilever beam, and a lifting mechanism is arranged on the track. A traction mechanism is arranged on the side, away from the cantilever beam, of the tensioning mechanism. Construction and assembly are convenient, worker operation is more convenient, the problems that traditional curtain wall vertical transportation, installation and construction are inconvenient, the construction period is long, and manpower and material resource consumption is large are solved, the working intensity of workers is greatly reduced, the site construction progress is accelerated, the safety of curtain wall vertical transportation and construction is also improved, and the device can be repeatedly used and is worthy of popularization. Manpower and material resource consumption is reduced, and construction cost is reduced.
本发明公开了一种单元式幕墙吊装装置,包括轨道,所述轨道上设有组合式环链电动葫芦,所述轨道的上方设有多个悬挑梁,所述悬挑梁与轨道之间连接有拉结机构,所述悬挑梁上设有两个固定机构,所述悬挑梁上设有拉紧机构,所述拉紧机构远离悬挑梁的一侧设有牵拉机构。本发明施工组装方便,工人操作更加便捷,解决了传统幕墙垂直运输安装施工不便、施工周期长、人力物力消耗大的问题,大大降低了工人的工作强度,加快现场施工进度,也提高了幕墙垂直运输施工的安全性,且装置可重复周转使用,降低人力物力消耗,减少施工成本。
Unit type curtain wall hoisting device
一种单元式幕墙吊装装置
ZHENG CHANGWANG (Autor:in) / SUN PENGCHENG (Autor:in) / SU MINGSHEN (Autor:in) / TAO WEIQI (Autor:in) / HUANG YIMING (Autor:in)
23.08.2024
Patent
Elektronische Ressource
Chinesisch
Hoisting device for unit type curtain wall and construction method
Europäisches Patentamt | 2024
|Unit type curtain wall track hoisting device and mounting method thereof
Europäisches Patentamt | 2024
|