Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway construction soil multilayer sampling device
The invention belongs to the technical field of soil sampling, and particularly relates to a highway construction soil multilayer sampling device which comprises a base, a beam frame fixed to the top of the base, a first motor fixed to the top of the beam frame, a second bevel gear connected to an output shaft of the first motor, and a first bevel gear fixedly arranged at the top end of a screw in a sleeving mode. A mounting plate in threaded connection with the screw rod is arranged below the beam frame, a guide rod penetrating through the mounting plate is fixed at the bottom of the beam frame, one end, far away from the screw rod, of the mounting plate penetrates through and is rotationally connected with a sampling cylinder, a drill bit is mounted at the bottom end of the sampling cylinder, and the sampling cylinder is connected with a driving assembly. According to the device, an output shaft of a first motor drives a second bevel gear, the second bevel gear is meshed to drive a first bevel gear, the first bevel gear synchronously drives a screw to rotate, a mounting plate drives a sampling barrel to move downwards under the action of the screw and the guiding action of a guide rod, and when the sampling barrel moves, a driving assembly drives the sampling barrel and a drill bit to rotate; therefore, the sampling cylinder is downwards tunneled.
本发明属于土壤取样技术领域,尤其是一种公路施工土质多层取样装置,包括底座,底座顶部固定有梁架,梁架顶部固定有第一电机,第一电机输出轴连接有第二锥齿轮,螺杆的顶端固定套设有第一锥齿轮,梁架的下方设置有与螺杆螺纹连接的安装板,梁架底部固定有穿过安装板的导向杆,安装板远离螺杆的一端贯穿并转动连接有采样筒,采样筒的底端安装有钻头,采样筒连接有驱转组件。本发明中,第一电机输出轴带动第二锥齿轮,第二锥齿轮啮合带动第一锥齿轮,第一锥齿轮同步带动螺杆转动,在螺杆的作用以及导向杆的导向作用下,安装板带动采样筒向下移动,并且当采样筒移动时,驱转组件带动采样筒和钻头转动,从而使得采样筒向下掘进。
Highway construction soil multilayer sampling device
The invention belongs to the technical field of soil sampling, and particularly relates to a highway construction soil multilayer sampling device which comprises a base, a beam frame fixed to the top of the base, a first motor fixed to the top of the beam frame, a second bevel gear connected to an output shaft of the first motor, and a first bevel gear fixedly arranged at the top end of a screw in a sleeving mode. A mounting plate in threaded connection with the screw rod is arranged below the beam frame, a guide rod penetrating through the mounting plate is fixed at the bottom of the beam frame, one end, far away from the screw rod, of the mounting plate penetrates through and is rotationally connected with a sampling cylinder, a drill bit is mounted at the bottom end of the sampling cylinder, and the sampling cylinder is connected with a driving assembly. According to the device, an output shaft of a first motor drives a second bevel gear, the second bevel gear is meshed to drive a first bevel gear, the first bevel gear synchronously drives a screw to rotate, a mounting plate drives a sampling barrel to move downwards under the action of the screw and the guiding action of a guide rod, and when the sampling barrel moves, a driving assembly drives the sampling barrel and a drill bit to rotate; therefore, the sampling cylinder is downwards tunneled.
本发明属于土壤取样技术领域,尤其是一种公路施工土质多层取样装置,包括底座,底座顶部固定有梁架,梁架顶部固定有第一电机,第一电机输出轴连接有第二锥齿轮,螺杆的顶端固定套设有第一锥齿轮,梁架的下方设置有与螺杆螺纹连接的安装板,梁架底部固定有穿过安装板的导向杆,安装板远离螺杆的一端贯穿并转动连接有采样筒,采样筒的底端安装有钻头,采样筒连接有驱转组件。本发明中,第一电机输出轴带动第二锥齿轮,第二锥齿轮啮合带动第一锥齿轮,第一锥齿轮同步带动螺杆转动,在螺杆的作用以及导向杆的导向作用下,安装板带动采样筒向下移动,并且当采样筒移动时,驱转组件带动采样筒和钻头转动,从而使得采样筒向下掘进。
Highway construction soil multilayer sampling device
一种公路施工土质多层取样装置
LI LI (Autor:in) / QI YAJING (Autor:in) / SU RU (Autor:in) / ZHANG BAOLONG (Autor:in) / LIU JIULONG (Autor:in) / KANG DANDAN (Autor:in) / LIU SIMING (Autor:in) / GAO YANHENG (Autor:in) / LI LIQIANG (Autor:in) / MA SHIJIN (Autor:in)
23.08.2024
Patent
Elektronische Ressource
Chinesisch