Electric power tower installation and calibration method
The invention provides a power tower installation calibration method, and relates to the technical field of power transmission tower installation. The electric power tower installation and calibration method is achieved through the electric power tower installation and calibration device, and the electric power tower installation and calibration device comprises a clamping end rotating assembly, two bottom installation assemblies, an adjusting assembly, a rope detection assembly, a calibration rope, a fixing clamp and a rope winding assembly. The clamping end rotating assembly comprises a base plate, a rotating bearing, a rotating disc, a rotating disc gear, a motor mounting frame, a gear motor and a transmission gear, the position, close to the upper end, of the outer side wall of the base plate is connected to an inner bearing of the rotating bearing, and the rotating disc is connected to an outer bearing of the rotating bearing. Through cooperative use of the calibration rope, the clamping end rotating assembly and other assemblies, the problem that when the tower head of an electric power tower is installed, workers need to hang the tower head in the air for operation, and the tower head is prone to being twisted with a steel rope for hoisting the tower head, so that dangerous accidents happen is solved.
本发明提供一种电力杆塔安装校准方法,涉及输电塔安装技术领域。该电力杆塔安装校准方法通过电力杆塔安装校准装置实现,所述电力杆塔安装校准装置包括夹持端转动组件、两个底部安装组件、调节组件、绳缆检测组件、校准绳缆、固定钳与绳缆卷绕组件,所述夹持端转动组件包括底盘、转动轴承、转动盘、转盘齿轮、电机安装架、齿轮电机与传动齿轮,所述底盘的外侧壁靠上端的位置连接在转动轴承的内轴承上,所述转动盘连接在转动轴承的外轴承上。通过校准绳缆与夹持端转动组件等组件的配合使用,解决了电力杆塔在安装塔头时需要工人吊在半空中进行作业,容易与起吊塔头的钢绳绞合从而发生危险事故的问题。
Electric power tower installation and calibration method
The invention provides a power tower installation calibration method, and relates to the technical field of power transmission tower installation. The electric power tower installation and calibration method is achieved through the electric power tower installation and calibration device, and the electric power tower installation and calibration device comprises a clamping end rotating assembly, two bottom installation assemblies, an adjusting assembly, a rope detection assembly, a calibration rope, a fixing clamp and a rope winding assembly. The clamping end rotating assembly comprises a base plate, a rotating bearing, a rotating disc, a rotating disc gear, a motor mounting frame, a gear motor and a transmission gear, the position, close to the upper end, of the outer side wall of the base plate is connected to an inner bearing of the rotating bearing, and the rotating disc is connected to an outer bearing of the rotating bearing. Through cooperative use of the calibration rope, the clamping end rotating assembly and other assemblies, the problem that when the tower head of an electric power tower is installed, workers need to hang the tower head in the air for operation, and the tower head is prone to being twisted with a steel rope for hoisting the tower head, so that dangerous accidents happen is solved.
本发明提供一种电力杆塔安装校准方法,涉及输电塔安装技术领域。该电力杆塔安装校准方法通过电力杆塔安装校准装置实现,所述电力杆塔安装校准装置包括夹持端转动组件、两个底部安装组件、调节组件、绳缆检测组件、校准绳缆、固定钳与绳缆卷绕组件,所述夹持端转动组件包括底盘、转动轴承、转动盘、转盘齿轮、电机安装架、齿轮电机与传动齿轮,所述底盘的外侧壁靠上端的位置连接在转动轴承的内轴承上,所述转动盘连接在转动轴承的外轴承上。通过校准绳缆与夹持端转动组件等组件的配合使用,解决了电力杆塔在安装塔头时需要工人吊在半空中进行作业,容易与起吊塔头的钢绳绞合从而发生危险事故的问题。
Electric power tower installation and calibration method
一种电力杆塔安装校准方法
XIAO LIQIANG (Autor:in)
27.08.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Installation equipment and installation method of electric power sharing tower
Europäisches Patentamt | 2022
|Hoisting equipment for electric power iron tower installation
Europäisches Patentamt | 2024
|Chemical reaction tower calibration and installation equipment
Europäisches Patentamt | 2024
|Electric power line single pole tower and installation method thereof
Europäisches Patentamt | 2023
|