Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water-facing revetment protection precast pile and construction method
The invention provides a construction method of a waterside revetment protection precast pile, which comprises the following steps: when the whole device is mounted or dismounted, firstly, the whole device is placed at a specified position, then a motor is started to drive a threaded rod to rotate, and when the threaded rod rotates, a threaded sleeve on the surface is driven to move up and down; when the threaded sleeves move up and down, the fixing frames on the two sides are driven to move in movable through grooves formed in the surfaces of the mounting columns, and when the fixing frames move up and down, the fixing columns are driven to be separated from the ground or mounted. According to the waterside revetment protection precast pile provided by the invention, the threaded rods with the threaded sleeves are arranged in the two mounting columns with the movable through grooves, and the fixing frame with the fixing columns and the motor are matched for operation, so that when a steel structure frame of the precast pile main body is mounted on a waterside revetment with a complex terrain, the precast pile main body can be conveniently mounted; and the mounting column can be mounted in water in a manner of driving the threaded rod to rotate through the motor, so that the mounting can be conveniently carried out.
本发明提供一种临水驳岸防护预制桩的施工方法,包括以下步骤:当对整个装置进行安装或者拆卸时,首先将整个装置放置在指定的位置,然后启动电机带动螺纹杆进行转动,当螺纹杆转动时带动表面的螺纹套上下移动,当螺纹套上下移动时带动两侧的固定架在安装柱表面开设的活动通槽内部进行移动,当固定架上下移动时带动固定柱与地面分离或者安装。本发明提供的一种临水驳岸防护预制桩,在两个带有活动通槽的安装柱内部设置带有螺纹套的螺纹杆、带有固定柱的固定架和电机之间配合操作,能在地形复杂的临水驳岸进行预制桩主体的钢结构框架进行安装时,可以通过电机带动螺纹杆转动的方式将安装柱在水中进行安装,从而能便捷式的进行安装。
Water-facing revetment protection precast pile and construction method
The invention provides a construction method of a waterside revetment protection precast pile, which comprises the following steps: when the whole device is mounted or dismounted, firstly, the whole device is placed at a specified position, then a motor is started to drive a threaded rod to rotate, and when the threaded rod rotates, a threaded sleeve on the surface is driven to move up and down; when the threaded sleeves move up and down, the fixing frames on the two sides are driven to move in movable through grooves formed in the surfaces of the mounting columns, and when the fixing frames move up and down, the fixing columns are driven to be separated from the ground or mounted. According to the waterside revetment protection precast pile provided by the invention, the threaded rods with the threaded sleeves are arranged in the two mounting columns with the movable through grooves, and the fixing frame with the fixing columns and the motor are matched for operation, so that when a steel structure frame of the precast pile main body is mounted on a waterside revetment with a complex terrain, the precast pile main body can be conveniently mounted; and the mounting column can be mounted in water in a manner of driving the threaded rod to rotate through the motor, so that the mounting can be conveniently carried out.
本发明提供一种临水驳岸防护预制桩的施工方法,包括以下步骤:当对整个装置进行安装或者拆卸时,首先将整个装置放置在指定的位置,然后启动电机带动螺纹杆进行转动,当螺纹杆转动时带动表面的螺纹套上下移动,当螺纹套上下移动时带动两侧的固定架在安装柱表面开设的活动通槽内部进行移动,当固定架上下移动时带动固定柱与地面分离或者安装。本发明提供的一种临水驳岸防护预制桩,在两个带有活动通槽的安装柱内部设置带有螺纹套的螺纹杆、带有固定柱的固定架和电机之间配合操作,能在地形复杂的临水驳岸进行预制桩主体的钢结构框架进行安装时,可以通过电机带动螺纹杆转动的方式将安装柱在水中进行安装,从而能便捷式的进行安装。
Water-facing revetment protection precast pile and construction method
一种临水驳岸防护预制桩及施工方法
HU FEIZHOU (Autor:in) / HE PING (Autor:in) / QIU JUN (Autor:in) / ZHANG YUNBING (Autor:in) / ZHAO GUANGYI (Autor:in) / WANG ZHONGJIE (Autor:in) / LI HAO (Autor:in) / LEE SANGMU (Autor:in) / LIAO WENZHI (Autor:in) / HU YUHUAN (Autor:in)
03.09.2024
Patent
Elektronische Ressource
Chinesisch
Prefabricated wave pile ecological revetment construction method
Europäisches Patentamt | 2023
|Precast pile construction method and precast pile construction equipment
Europäisches Patentamt | 2021
|Energy dissipation type landscape revetment pile and landscape revetment
Europäisches Patentamt | 2024
|REVETMENT STRUCTURE, AND REVETMENT CONSTRUCTION METHOD
Europäisches Patentamt | 2020
|