Underground invisible green construction method for large drainage pump station
The invention belongs to the field of constructional engineering, and particularly relates to an underground invisible green construction method for a large drainage pump station, which comprises the following specific steps of: S1, firstly, knowing information such as underground water level, earth surface condition and soil texture in the early-stage preparation process so as to select a proper construction site and scheme; s2, site cleaning needs to be carried out in the construction preparation process, sundries and obstacles on a construction site are cleaned, it is ensured that a construction area is flat and clean, and then survey setting-out is carried out; through the arrangement of the high-pressure spray head structure, the design is simple to operate, dust can be wetted while being absorbed, so that the dust can be cleaned more thoroughly, meanwhile, electric power can be provided through the photovoltaic panel, plugging-in is not needed, and the flexibility is improved.
本发明属于建筑工程领域,具体的说是一种大型排涝泵站地下隐形绿色施工方法,该施工方法具体步骤如下:S1:前期准备的过程中首先需要进行了解地下水位、地表情况和土质等信息,以选择合适的施工地点和方案;S2:施工准备的过程中需要进行场地清理,清理施工现场的杂物和障碍物,确保施工区域的平整和清洁,然后进行测量放样;通过设置的高压喷头结构,此设计不仅操作简单,而且在对灰尘吸收的同时,能够将其打湿,从而能够对灰尘清理的更加彻底,同时还能够通过光伏板提供电力,无需插电,提高了灵活性。
Underground invisible green construction method for large drainage pump station
The invention belongs to the field of constructional engineering, and particularly relates to an underground invisible green construction method for a large drainage pump station, which comprises the following specific steps of: S1, firstly, knowing information such as underground water level, earth surface condition and soil texture in the early-stage preparation process so as to select a proper construction site and scheme; s2, site cleaning needs to be carried out in the construction preparation process, sundries and obstacles on a construction site are cleaned, it is ensured that a construction area is flat and clean, and then survey setting-out is carried out; through the arrangement of the high-pressure spray head structure, the design is simple to operate, dust can be wetted while being absorbed, so that the dust can be cleaned more thoroughly, meanwhile, electric power can be provided through the photovoltaic panel, plugging-in is not needed, and the flexibility is improved.
本发明属于建筑工程领域,具体的说是一种大型排涝泵站地下隐形绿色施工方法,该施工方法具体步骤如下:S1:前期准备的过程中首先需要进行了解地下水位、地表情况和土质等信息,以选择合适的施工地点和方案;S2:施工准备的过程中需要进行场地清理,清理施工现场的杂物和障碍物,确保施工区域的平整和清洁,然后进行测量放样;通过设置的高压喷头结构,此设计不仅操作简单,而且在对灰尘吸收的同时,能够将其打湿,从而能够对灰尘清理的更加彻底,同时还能够通过光伏板提供电力,无需插电,提高了灵活性。
Underground invisible green construction method for large drainage pump station
一种大型排涝泵站地下隐形绿色施工方法
GUO JUNHUI (Autor:in) / HU WEIBING (Autor:in) / CHEN CHENG (Autor:in) / XIA HUILAN (Autor:in) / ZENG XIAN (Autor:in) / YE YAN (Autor:in) / SHI WENQIN (Autor:in) / FANG LING (Autor:in)
06.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
/
B01D
SEPARATION
,
Trennen
/
B08B
Reinigen allgemein
,
CLEANING IN GENERAL
/
E02D
FOUNDATIONS
,
Gründungen
/
H02S
GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRA-RED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, E.G. USING PHOTOVOLTAIC [PV] MODULES
,
Erzeugung elektrischer Energie durch Umwandlung von Infrarot-Strahlung, sichtbarem Licht oder ultraviolettem Licht, z.B. unter Verwendung von Photovoltaik [PV]-Modulen
Underground pump station construction structure and construction method thereof
Europäisches Patentamt | 2024
|Flood drainage pump station and construction method thereof
Europäisches Patentamt | 2022
|Flood drainage pump station and construction method thereof
Europäisches Patentamt | 2023
|