Manufacturing method of steel pipe and steel shell combined cable bent tower section
The embodiment of the invention relates to a manufacturing method of a steel pipe and steel shell combined cable bent tower section, which comprises the following steps of: partitioning the cable bent tower section into a plurality of steel pipe block bodies and a plurality of steel shell block bodies, manufacturing the steel pipe block bodies and the steel shell block bodies in a factory, and assembling positioning matching components onto the steel pipe block bodies; transporting the steel pipe block body and the steel shell block body to a construction site; the steel pipe block body is positioned and assembled on a foundation through the positioning supporting pedestal, and the steel pipe block body is connected with the positioning supporting pedestal through the positioning matching component; the multiple steel pipe block bodies are positioned and fixed through the positioning and connecting assemblies; the multiple steel pipe blocks are connected through the annular stiffening plates to form rigid fixation; and the multiple steel shell block bodies are installed in place. According to the embodiment, the upper connector and the lower connector of the whole steel pipe block can be accurately positioned, butt joint precision control over the steel pipe block is improved, and therefore the assembling precision of the whole cable bent tower section is ensured.
本公开实施例是关于一种钢管钢壳组合索塔节段的制造方法,该方法包括步骤:将索塔节段分块为多个钢管块体和多个钢壳块体,在工厂内制造钢管块体和钢壳块体,并将定位匹配构件组装至钢管块体上;将钢管块体和钢壳块体运输至施工现场;通过定位支撑台座将钢管块体定位组装在基础上,并通过定位匹配构件将钢管块体与定位支撑台座连接;通过定位连接组件对多个钢管块体进行定位固定;通过环形加劲板将多个钢管块体连接以形成刚性固定;将多个钢壳块体安装到位。本公开实施例可以使得整个钢管块体的上下接口定位精准,提升对钢管块体的对接精度控制,从而确保整个索塔节段组装精度。
Manufacturing method of steel pipe and steel shell combined cable bent tower section
The embodiment of the invention relates to a manufacturing method of a steel pipe and steel shell combined cable bent tower section, which comprises the following steps of: partitioning the cable bent tower section into a plurality of steel pipe block bodies and a plurality of steel shell block bodies, manufacturing the steel pipe block bodies and the steel shell block bodies in a factory, and assembling positioning matching components onto the steel pipe block bodies; transporting the steel pipe block body and the steel shell block body to a construction site; the steel pipe block body is positioned and assembled on a foundation through the positioning supporting pedestal, and the steel pipe block body is connected with the positioning supporting pedestal through the positioning matching component; the multiple steel pipe block bodies are positioned and fixed through the positioning and connecting assemblies; the multiple steel pipe blocks are connected through the annular stiffening plates to form rigid fixation; and the multiple steel shell block bodies are installed in place. According to the embodiment, the upper connector and the lower connector of the whole steel pipe block can be accurately positioned, butt joint precision control over the steel pipe block is improved, and therefore the assembling precision of the whole cable bent tower section is ensured.
本公开实施例是关于一种钢管钢壳组合索塔节段的制造方法,该方法包括步骤:将索塔节段分块为多个钢管块体和多个钢壳块体,在工厂内制造钢管块体和钢壳块体,并将定位匹配构件组装至钢管块体上;将钢管块体和钢壳块体运输至施工现场;通过定位支撑台座将钢管块体定位组装在基础上,并通过定位匹配构件将钢管块体与定位支撑台座连接;通过定位连接组件对多个钢管块体进行定位固定;通过环形加劲板将多个钢管块体连接以形成刚性固定;将多个钢壳块体安装到位。本公开实施例可以使得整个钢管块体的上下接口定位精准,提升对钢管块体的对接精度控制,从而确保整个索塔节段组装精度。
Manufacturing method of steel pipe and steel shell combined cable bent tower section
一种钢管钢壳组合索塔节段的制造方法
GUO JITAO (Autor:in) / ZHANG JIANFENG (Autor:in) / GUO HAO (Autor:in) / WANG WEIHONG (Autor:in) / WANG WEIZU (Autor:in) / HUA SUWEN (Autor:in) / SONG FUYUN (Autor:in) / CAO QINGGUO (Autor:in) / LEI PING (Autor:in) / SONG PIAO (Autor:in)
10.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Steel shell concrete combined cable bent tower structure
Europäisches Patentamt | 2022
|Section steel and steel bar combined cable bent tower construction method
Europäisches Patentamt | 2024
|Cable-stayed bridge steel shell-concrete combined bridge tower cable bent tower anchoring structure
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Ultrahigh combined cable bent tower steel-concrete combined section and construction method thereof
Europäisches Patentamt | 2023
|