Electric power iron tower long and short leg inclined column construction method
The invention relates to an electric power iron tower long and short leg inclined column construction method, and relates to the technical field of electric power iron tower construction, and the construction steps are as follows: S1, calculating construction data of each foundation according to design data, including an angle steel single side inclination angle, an angle steel upper edge half root distance, an angle steel lower edge half root distance and a foundation lower part half root distance; s2, foundation pit division is carried out by adopting a slope distance method for measuring pit angles, and whether a transition pile is used for measurement or not is selected according to topographic conditions; s3, pouring preparation is conducted, specifically, the positions of steel bars are aligned, concrete cushion blocks for supporting and cushioning angle steel are aligned through the half diagonal values of the lower edges of the angle steel, the positions of the angle steel are controlled through supporting rods, various data of the inserted angle steel are adjusted through a slope distance calculation method, the steel bars are bound, and a formwork is aligned; and S4, foundation pouring is conducted, specifically, all data are rechecked at any time in the pouring process, and pouring is suspended after pouring is conducted to a certain height so as to install, align and insert the angle steel. The method has the effects that construction data can be conveniently controlled, and the construction quality and efficiency are improved.
本申请涉及一种电力铁塔长短腿斜柱施工方法,涉及电力铁塔施工技术领域,其施工步骤如下:S1、根据设计数据计算每一基础的施工数据,包括角钢单侧倾斜角、角钢上棱半根开、角钢下棱半根开和基础下部半根开;S2、采用测量坑角的斜距方法进行基础分坑,并根据地形条件选择是否使用过渡桩进行测量;S3、进行浇制准备,包括找正钢筋位置、用角钢下棱的半对角线值找正支垫角钢的混凝土垫块、通过撑杆控制角钢位置、使用斜距计算法调节插入角钢的各项数据、绑扎钢筋并找正模板;S4、进行基础浇制,包括在浇制过程中随时复查各项数据,并在浇制到一定高度后暂停浇制以安装找正插入角钢。本申请具有便于控制施工数据、提高施工质量和效率的效果。
Electric power iron tower long and short leg inclined column construction method
The invention relates to an electric power iron tower long and short leg inclined column construction method, and relates to the technical field of electric power iron tower construction, and the construction steps are as follows: S1, calculating construction data of each foundation according to design data, including an angle steel single side inclination angle, an angle steel upper edge half root distance, an angle steel lower edge half root distance and a foundation lower part half root distance; s2, foundation pit division is carried out by adopting a slope distance method for measuring pit angles, and whether a transition pile is used for measurement or not is selected according to topographic conditions; s3, pouring preparation is conducted, specifically, the positions of steel bars are aligned, concrete cushion blocks for supporting and cushioning angle steel are aligned through the half diagonal values of the lower edges of the angle steel, the positions of the angle steel are controlled through supporting rods, various data of the inserted angle steel are adjusted through a slope distance calculation method, the steel bars are bound, and a formwork is aligned; and S4, foundation pouring is conducted, specifically, all data are rechecked at any time in the pouring process, and pouring is suspended after pouring is conducted to a certain height so as to install, align and insert the angle steel. The method has the effects that construction data can be conveniently controlled, and the construction quality and efficiency are improved.
本申请涉及一种电力铁塔长短腿斜柱施工方法,涉及电力铁塔施工技术领域,其施工步骤如下:S1、根据设计数据计算每一基础的施工数据,包括角钢单侧倾斜角、角钢上棱半根开、角钢下棱半根开和基础下部半根开;S2、采用测量坑角的斜距方法进行基础分坑,并根据地形条件选择是否使用过渡桩进行测量;S3、进行浇制准备,包括找正钢筋位置、用角钢下棱的半对角线值找正支垫角钢的混凝土垫块、通过撑杆控制角钢位置、使用斜距计算法调节插入角钢的各项数据、绑扎钢筋并找正模板;S4、进行基础浇制,包括在浇制过程中随时复查各项数据,并在浇制到一定高度后暂停浇制以安装找正插入角钢。本申请具有便于控制施工数据、提高施工质量和效率的效果。
Electric power iron tower long and short leg inclined column construction method
一种电力铁塔长短腿斜柱施工方法
XIA XUEWEN (Autor:in)
13.09.2024
Patent
Elektronische Ressource
Chinesisch
Iron tower short pile-inclined anchor composite foundation and construction method thereof
Europäisches Patentamt | 2023
|Method for installing steel tower on inclined concrete tower column
Europäisches Patentamt | 2022
|Advanced active jacking force cross brace construction method for inner inclined tower column
Europäisches Patentamt | 2023
|