Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete panel construction method for reservoir basin or dam
The invention discloses a concrete panel construction method for a reservoir basin or a dam. The concrete panel construction method comprises the steps that firstly, a steel bar structure is bound on site; 2, installing a side template and a slip form device; thirdly, a pouring device is arranged, and concrete pouring blocks are sequentially poured and formed on site from bottom to top in a segmented mode; fourthly, the two second crawler-type winches and the slip form device are moved; and fifthly, a curing device is arranged, and the formed concrete pouring block is cured. Construction is convenient, the first crawler-type winch and the second crawler-type winch can both walk on the dam crest, the slip form device can walk on the toe board platform, the winches do not need to be disassembled and assembled repeatedly, and construction is convenient. The purpose that the first crawler-type winch, the second crawler-type winch and the slip form device move along the annular reservoir basin or dam can be achieved easily, the winches do not need to be disassembled and assembled repeatedly, the construction period is shortened, and the labor cost is reduced.
本发明公开了一种用于水库库盆或大坝的混凝土面板施工方法,包括:一、现场绑扎钢筋结构;二、安装侧模板与滑模装置;步骤三、布设浇筑装置,现场由下至上分段依次浇筑成型混凝土浇筑块;四、移动两个第二履带式卷扬机和滑模装置;五、布设养护装置,对已成型的混凝土浇筑块进行养护。本发明便于施工,第一履带式卷扬机和第二履带式卷扬机均能够在坝顶上行走,滑模装置能够在趾板平台上行走,不需要重复拆装卷扬机,能够轻松实现第一履带式卷扬机、第二履带式卷扬机和滑模装置沿着环形的水库库盆或大坝移动的目的,不需要重复拆装卷扬机,缩短了施工周期,降低了人工成本。
Concrete panel construction method for reservoir basin or dam
The invention discloses a concrete panel construction method for a reservoir basin or a dam. The concrete panel construction method comprises the steps that firstly, a steel bar structure is bound on site; 2, installing a side template and a slip form device; thirdly, a pouring device is arranged, and concrete pouring blocks are sequentially poured and formed on site from bottom to top in a segmented mode; fourthly, the two second crawler-type winches and the slip form device are moved; and fifthly, a curing device is arranged, and the formed concrete pouring block is cured. Construction is convenient, the first crawler-type winch and the second crawler-type winch can both walk on the dam crest, the slip form device can walk on the toe board platform, the winches do not need to be disassembled and assembled repeatedly, and construction is convenient. The purpose that the first crawler-type winch, the second crawler-type winch and the slip form device move along the annular reservoir basin or dam can be achieved easily, the winches do not need to be disassembled and assembled repeatedly, the construction period is shortened, and the labor cost is reduced.
本发明公开了一种用于水库库盆或大坝的混凝土面板施工方法,包括:一、现场绑扎钢筋结构;二、安装侧模板与滑模装置;步骤三、布设浇筑装置,现场由下至上分段依次浇筑成型混凝土浇筑块;四、移动两个第二履带式卷扬机和滑模装置;五、布设养护装置,对已成型的混凝土浇筑块进行养护。本发明便于施工,第一履带式卷扬机和第二履带式卷扬机均能够在坝顶上行走,滑模装置能够在趾板平台上行走,不需要重复拆装卷扬机,能够轻松实现第一履带式卷扬机、第二履带式卷扬机和滑模装置沿着环形的水库库盆或大坝移动的目的,不需要重复拆装卷扬机,缩短了施工周期,降低了人工成本。
Concrete panel construction method for reservoir basin or dam
一种用于水库库盆或大坝的混凝土面板施工方法
WANG YONGGANG (Autor:in) / QU XUDONG (Autor:in) / WENG KAILE (Autor:in) / WU SHENGLI (Autor:in) / LUO CHAO (Autor:in) / ZHANG JUANGUO (Autor:in) / HE KAIKAI (Autor:in) / LEI XUHUI (Autor:in) / CAO JIAXUAN (Autor:in) / LIU SHIHUA (Autor:in)
24.09.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|Half-reservoir-basin anti-seepage structure combining asphalt concrete panel and clay blanket
Europäisches Patentamt | 2024
|Prestressed concrete reservoir construction
Engineering Index Backfile | 1954
|