Bolt embedded foundation and construction method thereof
The invention relates to a bolt embedded foundation and a construction method thereof. The bolt embedded foundation comprises a supporting module; the anchor plate module comprises a modular mounting frame and a plurality of anchor plate pieces, the modular mounting frame is arranged above the supporting module and used for mounting the anchor plate pieces, the upper ends of the anchor plate pieces are provided with openings, and the lower ends of the anchor plate pieces are closed; each pouring protection module comprises a plurality of connected pouring protection sleeves, and each pouring protection sleeve communicates with the opening in the upper end of the corresponding anchor plate piece, so that the head of the embedded bolt can penetrate through the pouring protection sleeves to be fixedly arranged in the upper end of the anchor plate piece; and the axial length of the pouring sheath is set according to the tension/pressure borne by the embedded bolt. The bolt embedded foundation can meet the requirement of large equipment for the foundation strength and is not prone to falling off, the construction cost can be reduced, and the construction difficulty can be lowered.
本申请涉及一种螺栓预埋基础及其施工方法。该螺栓预埋基础包括:支撑模块;锚板模块,包括模块化安装架及多个锚板件,模块化安装架设置于支撑模块的上方并用于安装锚板件,锚板件的上端具有开口且下端封闭;及至少一个浇筑防护模块,每个浇筑防护模块包括多个相连的浇筑护套,每个浇筑护套均与对应的锚板件的上端开口连通,以使预埋螺栓的头部能够穿过浇筑护套而固设于锚板件的上端内,浇筑护套的轴向长度根据预埋螺栓所承受的拉/压力的大小设置。该螺栓预埋基础既可以满足大型设备对基础强度的要求且不易发生脱落,也会缩小施工建造成本及降低施工难度。
Bolt embedded foundation and construction method thereof
The invention relates to a bolt embedded foundation and a construction method thereof. The bolt embedded foundation comprises a supporting module; the anchor plate module comprises a modular mounting frame and a plurality of anchor plate pieces, the modular mounting frame is arranged above the supporting module and used for mounting the anchor plate pieces, the upper ends of the anchor plate pieces are provided with openings, and the lower ends of the anchor plate pieces are closed; each pouring protection module comprises a plurality of connected pouring protection sleeves, and each pouring protection sleeve communicates with the opening in the upper end of the corresponding anchor plate piece, so that the head of the embedded bolt can penetrate through the pouring protection sleeves to be fixedly arranged in the upper end of the anchor plate piece; and the axial length of the pouring sheath is set according to the tension/pressure borne by the embedded bolt. The bolt embedded foundation can meet the requirement of large equipment for the foundation strength and is not prone to falling off, the construction cost can be reduced, and the construction difficulty can be lowered.
本申请涉及一种螺栓预埋基础及其施工方法。该螺栓预埋基础包括:支撑模块;锚板模块,包括模块化安装架及多个锚板件,模块化安装架设置于支撑模块的上方并用于安装锚板件,锚板件的上端具有开口且下端封闭;及至少一个浇筑防护模块,每个浇筑防护模块包括多个相连的浇筑护套,每个浇筑护套均与对应的锚板件的上端开口连通,以使预埋螺栓的头部能够穿过浇筑护套而固设于锚板件的上端内,浇筑护套的轴向长度根据预埋螺栓所承受的拉/压力的大小设置。该螺栓预埋基础既可以满足大型设备对基础强度的要求且不易发生脱落,也会缩小施工建造成本及降低施工难度。
Bolt embedded foundation and construction method thereof
螺栓预埋基础及其施工方法
24.09.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Steel structure foundation embedded bolt structure and construction method thereof
Europäisches Patentamt | 2020
|Tower equipment embedded foundation bolt integral hoisting construction method
Europäisches Patentamt | 2024
|Foundation bolt pre-embedded positioning mold and foundation bolt mounting method
Europäisches Patentamt | 2021
|Foundation bolt fixing device and foundation bolt fixing construction method
Europäisches Patentamt | 2020
|Device for installing foundation bolt embedded part and construction method