Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assembly type steel plate pile sinking installation method
The invention provides an assembly type steel plate pile sinking installation method which comprises the following steps that S1, a plurality of pile bodies are connected together in a staggered combination mode, and a locking plate is placed at the end position where every two adjacent pile bodies are assembled; s2, two locking rods are clamped in concave grooves in the pile bodies, a rotating plate is rotated clockwise, the rotating plate drives a round tooth block to rotate clockwise, the round tooth block drives sawtooth strips at the two ends to move in the opposite directions, and rotating of the rotating plate is stopped until the two locking rods clamp the two concave grooves, so that the two adjacent pile bodies are locked together; and S3, when the pile bodies connected together need to be dismantled, a rotating plate is rotated anticlockwise, the rotating plate drives a round tooth block to rotate anticlockwise, the round tooth block drives sawtooth strips at the two ends to move in the opposite directions, and rotation of the rotating plate is stopped until the two locking rods are away from the two concave grooves, so that the two adjacent pile bodies are dismantled. By adjusting the distance between the locking rods, the steel plate pile sinking locking device is suitable for locking steel plate pile sinking of different thicknesses.
本发明提供了一种装配式钢板沉桩的安装方法,包括以下步骤:S1、多个桩体交错组合连接在一起,将锁紧板放置在两个相邻桩体相装配的端部位置;S2、将两根锁杆卡合在桩体上的凹型槽内,顺时针旋转转板,转板带动圆齿块顺时针旋转,圆齿块带动两端的锯齿条朝相对方向移动,直到两根锁杆将两个凹型槽卡紧,停止旋转转板,从而将两个相邻的桩体锁紧在一起;S3、当需要拆除连接在一起的桩体时,逆时针旋转转板,转板带动圆齿块逆时针旋转,圆齿块带动两端的锯齿条朝相反方向移动,直到两根锁杆远离两个凹型槽,停止旋转转板,从而将两个相邻的桩体拆分。通过调节锁杆的距离,从而适合于锁紧不同厚度的钢板沉桩。
Assembly type steel plate pile sinking installation method
The invention provides an assembly type steel plate pile sinking installation method which comprises the following steps that S1, a plurality of pile bodies are connected together in a staggered combination mode, and a locking plate is placed at the end position where every two adjacent pile bodies are assembled; s2, two locking rods are clamped in concave grooves in the pile bodies, a rotating plate is rotated clockwise, the rotating plate drives a round tooth block to rotate clockwise, the round tooth block drives sawtooth strips at the two ends to move in the opposite directions, and rotating of the rotating plate is stopped until the two locking rods clamp the two concave grooves, so that the two adjacent pile bodies are locked together; and S3, when the pile bodies connected together need to be dismantled, a rotating plate is rotated anticlockwise, the rotating plate drives a round tooth block to rotate anticlockwise, the round tooth block drives sawtooth strips at the two ends to move in the opposite directions, and rotation of the rotating plate is stopped until the two locking rods are away from the two concave grooves, so that the two adjacent pile bodies are dismantled. By adjusting the distance between the locking rods, the steel plate pile sinking locking device is suitable for locking steel plate pile sinking of different thicknesses.
本发明提供了一种装配式钢板沉桩的安装方法,包括以下步骤:S1、多个桩体交错组合连接在一起,将锁紧板放置在两个相邻桩体相装配的端部位置;S2、将两根锁杆卡合在桩体上的凹型槽内,顺时针旋转转板,转板带动圆齿块顺时针旋转,圆齿块带动两端的锯齿条朝相对方向移动,直到两根锁杆将两个凹型槽卡紧,停止旋转转板,从而将两个相邻的桩体锁紧在一起;S3、当需要拆除连接在一起的桩体时,逆时针旋转转板,转板带动圆齿块逆时针旋转,圆齿块带动两端的锯齿条朝相反方向移动,直到两根锁杆远离两个凹型槽,停止旋转转板,从而将两个相邻的桩体拆分。通过调节锁杆的距离,从而适合于锁紧不同厚度的钢板沉桩。
Assembly type steel plate pile sinking installation method
一种装配式钢板沉桩的安装方法
GONG SHIQI (Autor:in) / WANG YI (Autor:in) / YANG HUAN (Autor:in) / YANG GUOJUN (Autor:in)
01.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Double-layer guide frame for steel sheet pile sinking and steel sheet pile sinking method
Europäisches Patentamt | 2023
|