One-time pouring construction method for installation of concrete reverse ridge aluminum mold
The invention relates to the technical field of constructional engineering, and discloses a one-time pouring construction method for mounting a concrete reverse ridge aluminum formwork, which comprises a first floor slab and a first beam arranged below the first floor slab, and comprises the following steps: S1, pre-burying a pre-buried fixing part into the first beam at a preset position of a reverse ridge; s2, reinforcing steel bar binding is conducted on the preset positions of the reverse ridges, the shear walls and the columns; s3, the reverse ridge aluminum die assembly is installed on the embedded fixing piece; s4, a first supporting assembly is arranged on the reverse ridge aluminum mold assembly, and a beam aluminum mold assembly is installed at the upper end of the first supporting assembly; s5, a second supporting assembly is installed on the first floor, and a floor aluminum formwork is installed at the upper end of the second supporting assembly; s6, reinforcing steel bar binding is conducted at the preset positions of the second beam and the second floor slab; s7, concrete pouring is conducted on the preset positions of all the structures; and S8, concrete curing is conducted. According to the one-time pouring construction method for installing the concrete reverse ridge aluminum mold, the dislocation phenomenon of the reverse ridge aluminum mold assembly can be avoided, and the appearance quality of a reverse ridge can be guaranteed.
本发明涉及建筑工程技术领域,公开了一种混凝土反坎铝模安装一次浇筑施工方法,包括,第一楼板及设置于第一楼板下方的第一梁,包括以下步骤:S1、在反坎的预设位置上,将预埋固定件预埋至第一梁中;S2、在反坎、剪力墙和柱的预设位置上进行钢筋绑扎;S3、将反坎铝模组件安装于预埋固定件上;S4、在反坎铝模组件上设置第一支撑组件,并在其上端安装梁铝模组件;S5、在第一楼板安装第二支撑组件,并在其上端安装楼板铝模板;S6、在第二梁、第二楼板的预设位置进行钢筋绑扎;S7、在各结构的预设位置进行混凝土浇筑;S8、进行混凝土养护。本发明提供的混凝土反坎铝模安装一次浇筑施工方法能够避免反坎铝膜组件发生错位现象,且能保证反坎的外观质量。
One-time pouring construction method for installation of concrete reverse ridge aluminum mold
The invention relates to the technical field of constructional engineering, and discloses a one-time pouring construction method for mounting a concrete reverse ridge aluminum formwork, which comprises a first floor slab and a first beam arranged below the first floor slab, and comprises the following steps: S1, pre-burying a pre-buried fixing part into the first beam at a preset position of a reverse ridge; s2, reinforcing steel bar binding is conducted on the preset positions of the reverse ridges, the shear walls and the columns; s3, the reverse ridge aluminum die assembly is installed on the embedded fixing piece; s4, a first supporting assembly is arranged on the reverse ridge aluminum mold assembly, and a beam aluminum mold assembly is installed at the upper end of the first supporting assembly; s5, a second supporting assembly is installed on the first floor, and a floor aluminum formwork is installed at the upper end of the second supporting assembly; s6, reinforcing steel bar binding is conducted at the preset positions of the second beam and the second floor slab; s7, concrete pouring is conducted on the preset positions of all the structures; and S8, concrete curing is conducted. According to the one-time pouring construction method for installing the concrete reverse ridge aluminum mold, the dislocation phenomenon of the reverse ridge aluminum mold assembly can be avoided, and the appearance quality of a reverse ridge can be guaranteed.
本发明涉及建筑工程技术领域,公开了一种混凝土反坎铝模安装一次浇筑施工方法,包括,第一楼板及设置于第一楼板下方的第一梁,包括以下步骤:S1、在反坎的预设位置上,将预埋固定件预埋至第一梁中;S2、在反坎、剪力墙和柱的预设位置上进行钢筋绑扎;S3、将反坎铝模组件安装于预埋固定件上;S4、在反坎铝模组件上设置第一支撑组件,并在其上端安装梁铝模组件;S5、在第一楼板安装第二支撑组件,并在其上端安装楼板铝模板;S6、在第二梁、第二楼板的预设位置进行钢筋绑扎;S7、在各结构的预设位置进行混凝土浇筑;S8、进行混凝土养护。本发明提供的混凝土反坎铝模安装一次浇筑施工方法能够避免反坎铝膜组件发生错位现象,且能保证反坎的外观质量。
One-time pouring construction method for installation of concrete reverse ridge aluminum mold
一种混凝土反坎铝模安装一次浇筑施工方法
ZENG ZHAODI (Autor:in) / ZHOU ZIJIE (Autor:in) / HE ZHUOXING (Autor:in) / ZHONG HAIJIAN (Autor:in) / KONG HAOWEI (Autor:in) / SU PEISHAN (Autor:in) / LIU HAOJUN (Autor:in) / ZHONG QINGXIAN (Autor:in) / WEN WEICAN (Autor:in) / LIAO YUANPING (Autor:in)
01.10.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Concrete reverse ridge accurate positioning mold and reverse ridge construction method
Europäisches Patentamt | 2021
|Concrete floor pouring mold and construction method thereof
Europäisches Patentamt | 2021
|