Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Constructional column concrete pouring and vibrating device
The invention relates to the technical field of constructional column pouring, and discloses a constructional column concrete pouring and vibrating device which comprises two sets of stand columns, the two sets of stand columns are located on the front side of a wall, fixing assemblies are arranged on the surfaces of the stand columns in an array mode, a plurality of front sealing plates are clamped between the stand columns and the wall, and a guide vertical frame is arranged on the front sides of the two sets of stand columns; a base assembly is slidably connected to the surface of the guide vertical frame, a pouring assembly and a vibrating assembly are arranged on the surface of the base assembly, a knocking assembly is arranged at one end of the base assembly, and a pre-sealing assembly is arranged on the rear side of the wall body. One side of the constructional column is sealed in advance through the rear sealing plate, then the front sealing plates are sequentially installed from bottom to top, and the other side of the constructional column is sealed in a staged mode; after the front sealing plate is installed at each time, concrete is guided through the flow guide hopper, concrete pouring is carried out, meanwhile, the vibration rod is inserted into the concrete for vibration, and the purposes of convenient vibration and high construction efficiency are achieved.
本发明涉及构造柱浇筑技术领域,且公开了一种构造柱砼浇筑振捣装置,包括两组立柱,两组所述立柱位于墙体的前侧,所述立柱表面阵列设置有固定组件,所述立柱与墙体之间夹持有多个前封板,两组所述立柱前侧设置有导向立架,所述导向立架表面滑动连接有基座组件,所述基座组件表面设置有浇筑组件和振捣组件,所述基座组件一端设置有敲击组件,墙体后侧设置有预封组件。通过后封板预先对构造柱一侧进行密封,再从下至上依次安装前封板,阶段性对构造柱另一侧进行密封;并在每次安装前封板后侧,通过导流斗对混凝土导向,进行混凝土浇筑,同时振动棒插入混凝土中进行振捣,达到方便振捣、施工效率高的目的。
Constructional column concrete pouring and vibrating device
The invention relates to the technical field of constructional column pouring, and discloses a constructional column concrete pouring and vibrating device which comprises two sets of stand columns, the two sets of stand columns are located on the front side of a wall, fixing assemblies are arranged on the surfaces of the stand columns in an array mode, a plurality of front sealing plates are clamped between the stand columns and the wall, and a guide vertical frame is arranged on the front sides of the two sets of stand columns; a base assembly is slidably connected to the surface of the guide vertical frame, a pouring assembly and a vibrating assembly are arranged on the surface of the base assembly, a knocking assembly is arranged at one end of the base assembly, and a pre-sealing assembly is arranged on the rear side of the wall body. One side of the constructional column is sealed in advance through the rear sealing plate, then the front sealing plates are sequentially installed from bottom to top, and the other side of the constructional column is sealed in a staged mode; after the front sealing plate is installed at each time, concrete is guided through the flow guide hopper, concrete pouring is carried out, meanwhile, the vibration rod is inserted into the concrete for vibration, and the purposes of convenient vibration and high construction efficiency are achieved.
本发明涉及构造柱浇筑技术领域,且公开了一种构造柱砼浇筑振捣装置,包括两组立柱,两组所述立柱位于墙体的前侧,所述立柱表面阵列设置有固定组件,所述立柱与墙体之间夹持有多个前封板,两组所述立柱前侧设置有导向立架,所述导向立架表面滑动连接有基座组件,所述基座组件表面设置有浇筑组件和振捣组件,所述基座组件一端设置有敲击组件,墙体后侧设置有预封组件。通过后封板预先对构造柱一侧进行密封,再从下至上依次安装前封板,阶段性对构造柱另一侧进行密封;并在每次安装前封板后侧,通过导流斗对混凝土导向,进行混凝土浇筑,同时振动棒插入混凝土中进行振捣,达到方便振捣、施工效率高的目的。
Constructional column concrete pouring and vibrating device
一种构造柱砼浇筑振捣装置
ZHANG SHIXIAN (Autor:in) / FANG YANG (Autor:in) / LIU ZHI (Autor:in) / CHEN XIN (Autor:in)
01.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Constructional column concrete vibrating and pouring equipment and pouring method thereof
Europäisches Patentamt | 2021
|Constructional column concrete pouring robot and constructional column pouring method
Europäisches Patentamt | 2023
|Top pouring hopper device for pouring constructional column concrete
Europäisches Patentamt | 2022
|Constructional column concrete shaping and pouring device
Europäisches Patentamt | 2021
|Constructional column concrete pouring device and pouring method thereof
Europäisches Patentamt | 2024
|