Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Installation method for special-shaped air corridor between high-rise buildings
The invention discloses a mounting method for a special-shaped air corridor between high-rise buildings, which is used for erecting a Z-shaped special-shaped air corridor among a first building body, a second building body, a third building body and a fourth building body which are arranged in a staggered manner. Comprising the following steps that an overhanging operation platform is built, specifically, preassembled section steel body structures and lifting devices are installed on the roof parts of a first building body, a second building body, a third building body and a fourth building body; a Z-shaped special-shaped coupling beam main body structure is assembled on the ground; the Z-shaped special-shaped coupling beam main body structure is connected to a lifting device, and the Z-shaped special-shaped coupling beam main body structure is lifted to a preset height through the lifting device; a supplementary rod is arranged between the Z-shaped special-shaped coupling beam main body structure and the preassembled section steel body structure, so that the Z-shaped special-shaped coupling beam main body structure is fixedly connected to the preassembled section steel body structure; and finally, the Z-shaped special-shaped connecting beam main body structure lifting device is unloaded and disassembled, and then erection of the Z-shaped special-shaped aerial corridor is completed.
本发明公开了一种用于高层建筑间异型空中连廊的安装方法,用于在交错摆放的第一楼体、第二楼体、第三楼体和第四楼体之间架设“Z”字形异形空中连廊,包括以下步骤:搭建悬挑操作平台:在第一楼体、第二楼体、第三楼体和第四楼体的楼顶部安装预装段钢体结构和提升装置;地面拼装“Z”字形异形连梁主体结构;将“Z”字形异形连梁主体结构连接在提升装置上通过提升装置将“Z”字形异形连梁主体结构提升至预定高度;在“Z”字形异形连梁主体结构与预装段钢体结构之间设置补杆,使得“Z”字形异形连梁主体结构固定连接在预装段钢体结构上;最后卸载,拆卸“Z”字形异形连梁主体结构提升装置,进而完成“Z”字形异形空中连廊的架设。
Installation method for special-shaped air corridor between high-rise buildings
The invention discloses a mounting method for a special-shaped air corridor between high-rise buildings, which is used for erecting a Z-shaped special-shaped air corridor among a first building body, a second building body, a third building body and a fourth building body which are arranged in a staggered manner. Comprising the following steps that an overhanging operation platform is built, specifically, preassembled section steel body structures and lifting devices are installed on the roof parts of a first building body, a second building body, a third building body and a fourth building body; a Z-shaped special-shaped coupling beam main body structure is assembled on the ground; the Z-shaped special-shaped coupling beam main body structure is connected to a lifting device, and the Z-shaped special-shaped coupling beam main body structure is lifted to a preset height through the lifting device; a supplementary rod is arranged between the Z-shaped special-shaped coupling beam main body structure and the preassembled section steel body structure, so that the Z-shaped special-shaped coupling beam main body structure is fixedly connected to the preassembled section steel body structure; and finally, the Z-shaped special-shaped connecting beam main body structure lifting device is unloaded and disassembled, and then erection of the Z-shaped special-shaped aerial corridor is completed.
本发明公开了一种用于高层建筑间异型空中连廊的安装方法,用于在交错摆放的第一楼体、第二楼体、第三楼体和第四楼体之间架设“Z”字形异形空中连廊,包括以下步骤:搭建悬挑操作平台:在第一楼体、第二楼体、第三楼体和第四楼体的楼顶部安装预装段钢体结构和提升装置;地面拼装“Z”字形异形连梁主体结构;将“Z”字形异形连梁主体结构连接在提升装置上通过提升装置将“Z”字形异形连梁主体结构提升至预定高度;在“Z”字形异形连梁主体结构与预装段钢体结构之间设置补杆,使得“Z”字形异形连梁主体结构固定连接在预装段钢体结构上;最后卸载,拆卸“Z”字形异形连梁主体结构提升装置,进而完成“Z”字形异形空中连廊的架设。
Installation method for special-shaped air corridor between high-rise buildings
一种用于高层建筑间异型空中连廊的安装方法
CAI SHIMIN (Autor:in) / YANG LIDAN (Autor:in) / ZENG XIANGHUAN (Autor:in) / RAO XIAOFENG (Autor:in) / JIANG YAPING (Autor:in) / YANG HAO (Autor:in)
01.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
F15B
SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL
,
Druckmittelbetriebene Systeme allgemein
Lifting method for special-shaped air corridor between high-rise buildings
Europäisches Patentamt | 2024
|Large-span corridor between unequal-height high-rise buildings
Europäisches Patentamt | 2024
|Integral Lifting of Steel Structure Corridor between Two Super High-Rise Buildings under Wind Load
DOAJ | 2023
|Construction method of special-shaped air corridor structure
Europäisches Patentamt | 2024
|