Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cast-in-place pile slag removing, hole sealing and grouting device and construction method thereof
The invention relates to a cast-in-place pile slag removing, hole sealing and grouting device and a construction method thereof, and relates to the technical field of cast-in-place pile construction. The first core-pulling hole and the second core-pulling hole are used for communicating sediment at the bottom of a pile body, and a sealing plate used for sealing the first core-pulling hole and the second core-pulling hole is arranged on the pile body; a cleaning assembly communicated with the first core pulling hole is arranged on the pile body and used for cleaning sediments; the pile body is provided with a water drainage pipe which penetrates through the sealing plate and communicates with the second core pulling hole. The method has the effect of reducing the influence of sediment on the cast-in-place pile.
本申请涉及一种灌注桩清渣封孔注浆装置及其施工方法,涉及灌注桩施工技术领域;其包括用于连通桩体底部沉渣的第一抽芯孔和第二抽芯孔,所述桩体上设置有用于封闭第一抽芯孔和第二抽芯孔的封口板;所述桩体上设置有与第一抽芯孔相连通的清洗组件,以用于清理沉渣;所述桩体上设置有贯穿封口板并与第二抽芯孔相连通的泄水管;本申请具有减少沉渣对灌注桩影响的效果。
Cast-in-place pile slag removing, hole sealing and grouting device and construction method thereof
The invention relates to a cast-in-place pile slag removing, hole sealing and grouting device and a construction method thereof, and relates to the technical field of cast-in-place pile construction. The first core-pulling hole and the second core-pulling hole are used for communicating sediment at the bottom of a pile body, and a sealing plate used for sealing the first core-pulling hole and the second core-pulling hole is arranged on the pile body; a cleaning assembly communicated with the first core pulling hole is arranged on the pile body and used for cleaning sediments; the pile body is provided with a water drainage pipe which penetrates through the sealing plate and communicates with the second core pulling hole. The method has the effect of reducing the influence of sediment on the cast-in-place pile.
本申请涉及一种灌注桩清渣封孔注浆装置及其施工方法,涉及灌注桩施工技术领域;其包括用于连通桩体底部沉渣的第一抽芯孔和第二抽芯孔,所述桩体上设置有用于封闭第一抽芯孔和第二抽芯孔的封口板;所述桩体上设置有与第一抽芯孔相连通的清洗组件,以用于清理沉渣;所述桩体上设置有贯穿封口板并与第二抽芯孔相连通的泄水管;本申请具有减少沉渣对灌注桩影响的效果。
Cast-in-place pile slag removing, hole sealing and grouting device and construction method thereof
一种灌注桩清渣封孔注浆装置及其施工方法
ZHOU YULEI (Autor:in) / LI JINGHONG (Autor:in) / LI WENMING (Autor:in) / YANG CHANG-WOO (Autor:in) / LU HUANJIA (Autor:in)
11.10.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|Pile end bottom grouting device, cast-in-place pile and construction method of cast-in-place pile
Europäisches Patentamt | 2021
|Grouting device of cast-in-place pile foundation and construction method of cast-in-place pile
Europäisches Patentamt | 2023
|