Installation and construction method of steel structure riding track
The invention discloses an installation and construction method of a steel structure riding track, which can integrally lift the riding track indoors, is beneficial to reducing the indoor overhead working amount and reducing the construction risk, does not need to erect a large number of brackets in the construction process, effectively improves the construction efficiency and greatly reduces the construction cost. The installation construction method comprises the steps that an arc-shaped riding track is assembled and divided, a section of first riding track and two sections of second riding track are formed, a first lifting rod is installed, a lifting device is arranged, the first riding track is lifted after the lifting device is connected with the first riding track, and the two ends of the first riding track are welded to the bottom of the first lifting rod; the first riding track is in a hoisting state, two first safety ropes are arranged in the height direction of the first suspender, a second safety rope is arranged at the position, close to the middle, of the first riding track, the second suspender is connected, and the first riding track is repeatedly installed in the direction from the west side to the east side of the roof frame.
本发明公开了一种钢结构马道的安装施工方法,能够在室内将马道整体提升,有利于减少室内高空作业量,减小施工风险,施工过程中,也不用搭设大量支架,施工效率有效提高,施工费用大大减少;该安装施工方法包括:组装并分割弧形马道,形成一节第一马道和两节第二马道、安装第一吊杆、设置吊装装置、将吊装装置与第一马道连接后,吊装第一马道、将第一马道的两端分别与第一吊杆的底部焊接,并使第一马道处于吊装状态、沿第一吊杆高度方向分别布置两道第一安全绳,在第一马道的靠近中部位置处设置第二安全绳、连接第二吊杆以及沿屋面框架的西侧向东侧方向重复安装第一马道的步骤。
Installation and construction method of steel structure riding track
The invention discloses an installation and construction method of a steel structure riding track, which can integrally lift the riding track indoors, is beneficial to reducing the indoor overhead working amount and reducing the construction risk, does not need to erect a large number of brackets in the construction process, effectively improves the construction efficiency and greatly reduces the construction cost. The installation construction method comprises the steps that an arc-shaped riding track is assembled and divided, a section of first riding track and two sections of second riding track are formed, a first lifting rod is installed, a lifting device is arranged, the first riding track is lifted after the lifting device is connected with the first riding track, and the two ends of the first riding track are welded to the bottom of the first lifting rod; the first riding track is in a hoisting state, two first safety ropes are arranged in the height direction of the first suspender, a second safety rope is arranged at the position, close to the middle, of the first riding track, the second suspender is connected, and the first riding track is repeatedly installed in the direction from the west side to the east side of the roof frame.
本发明公开了一种钢结构马道的安装施工方法,能够在室内将马道整体提升,有利于减少室内高空作业量,减小施工风险,施工过程中,也不用搭设大量支架,施工效率有效提高,施工费用大大减少;该安装施工方法包括:组装并分割弧形马道,形成一节第一马道和两节第二马道、安装第一吊杆、设置吊装装置、将吊装装置与第一马道连接后,吊装第一马道、将第一马道的两端分别与第一吊杆的底部焊接,并使第一马道处于吊装状态、沿第一吊杆高度方向分别布置两道第一安全绳,在第一马道的靠近中部位置处设置第二安全绳、连接第二吊杆以及沿屋面框架的西侧向东侧方向重复安装第一马道的步骤。
Installation and construction method of steel structure riding track
一种钢结构马道的安装施工方法
DAI HENGKAI (Autor:in) / CHEN XIAOLI (Autor:in) / CAO YONG (Autor:in) / XU WENJIAN (Autor:in) / FAN FANGYANG (Autor:in) / WANG JIANFENG (Autor:in) / CHEN JIEBIN (Autor:in)
11.10.2024
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Construction method for global slip of riding track and steel truss
Europäisches Patentamt | 2020
|