Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge steel box girder mounting structure and construction technology
The invention discloses a bridge steel box girder mounting structure and a construction technology, and relates to the technical field of steel box girder mounting structures. The steel box girder comprises a group of steel box girder modules, each steel box girder module comprises a top beam plate, and a group of linearly distributed first reinforcing frames are arranged at the bottom of the top beam plate; the top of the lower beam plate is provided with a group of lower ribs which are arranged in parallel; second vertical beam plates are arranged on the two sides of the first vertical beam plate, and first reinforcing grooves matched with the first reinforcing frames are formed in the top of the first vertical beam plate and the top of the second vertical beam plate correspondingly. The detachable steel box girder modules are arranged, so that disassembly, assembly and splicing can be better achieved, and the flexibility is high; by arranging the auxiliary supporting structure, after the top beam plate and the lower beam plate are installed, the sliding seats on the two sides can be driven to move in the opposite directions by screwing the adjusting screw rods, so that the limiting plates are clamped into the grooves of the clamping seats, structural reinforcement is achieved, and the reliability is improved.
本发明公开了一种桥梁钢箱梁安装结构及施工工艺,涉及钢箱梁安装结构技术领域;其包括一组钢箱梁模块,所述钢箱梁模块包括:顶梁板,顶梁板底部设置有一组线性分布的第一加固架;下梁板,下梁板顶部设置有一组平行设置的下肋条;第一竖向梁板,第一竖向梁板两侧设置有第二竖向梁板,第一竖向梁板和第二竖向梁板的顶部均设置有与第一加固架相适配的第一加固槽。本发明通过设置可拆卸的钢箱梁模块,能够更好地拆装拼接,灵活性强;通过设置辅助支撑结构,能够在顶梁板、下梁板安装完毕后,通过旋拧调节螺杆,带动两侧的滑座向相反的方向移动,使得限位板卡入卡座的凹槽内,实现结构的加固,提升了可靠性。
Bridge steel box girder mounting structure and construction technology
The invention discloses a bridge steel box girder mounting structure and a construction technology, and relates to the technical field of steel box girder mounting structures. The steel box girder comprises a group of steel box girder modules, each steel box girder module comprises a top beam plate, and a group of linearly distributed first reinforcing frames are arranged at the bottom of the top beam plate; the top of the lower beam plate is provided with a group of lower ribs which are arranged in parallel; second vertical beam plates are arranged on the two sides of the first vertical beam plate, and first reinforcing grooves matched with the first reinforcing frames are formed in the top of the first vertical beam plate and the top of the second vertical beam plate correspondingly. The detachable steel box girder modules are arranged, so that disassembly, assembly and splicing can be better achieved, and the flexibility is high; by arranging the auxiliary supporting structure, after the top beam plate and the lower beam plate are installed, the sliding seats on the two sides can be driven to move in the opposite directions by screwing the adjusting screw rods, so that the limiting plates are clamped into the grooves of the clamping seats, structural reinforcement is achieved, and the reliability is improved.
本发明公开了一种桥梁钢箱梁安装结构及施工工艺,涉及钢箱梁安装结构技术领域;其包括一组钢箱梁模块,所述钢箱梁模块包括:顶梁板,顶梁板底部设置有一组线性分布的第一加固架;下梁板,下梁板顶部设置有一组平行设置的下肋条;第一竖向梁板,第一竖向梁板两侧设置有第二竖向梁板,第一竖向梁板和第二竖向梁板的顶部均设置有与第一加固架相适配的第一加固槽。本发明通过设置可拆卸的钢箱梁模块,能够更好地拆装拼接,灵活性强;通过设置辅助支撑结构,能够在顶梁板、下梁板安装完毕后,通过旋拧调节螺杆,带动两侧的滑座向相反的方向移动,使得限位板卡入卡座的凹槽内,实现结构的加固,提升了可靠性。
Bridge steel box girder mounting structure and construction technology
一种桥梁钢箱梁安装结构及施工工艺
LEI XING (Autor:in) / AI LINGFENG (Autor:in) / LI CONG (Autor:in) / LIU YULIN (Autor:in) / PAN XUNXUE (Autor:in) / LI HUANLONG (Autor:in) / SUN DESHAN (Autor:in) / LI MENGXUAN (Autor:in) / LU QIMING (Autor:in) / LU HONGGUANG (Autor:in)
15.10.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge steel box girder mounting structure and construction technology
Europäisches Patentamt | 2021
|Steel truss girder construction method, steel truss girder and bridge structure
Europäisches Patentamt | 2024
|