Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid filling construction process for anti-sedimentation composite drainage roadbed in mountainous area
The invention relates to the technical field of road construction, in particular to a mountainous area anti-sedimentation composite drainage roadbed rapid filling construction process which comprises the following steps: S1, site investigation and design: carrying out detailed geological investigation on a construction area, knowing geological conditions, underground water level and rainfall conditions, and carrying out design according to an investigation result; comprising roadbed structure design, drainage system design and a settlement control scheme, drainage systems are arranged on the two sides of the roadbed, it is ensured that rainwater can be rapidly drained, softening and settlement caused by roadbed accumulated water are prevented, layered filling and compaction are conducted, the compactness and uniformity of each layer of filler are ensured, and the overall stability and anti-settlement performance of the roadbed are enhanced; and the drainage plates are vertically inserted in the filling process, drainage and consolidation are accelerated, and the stability and anti-settling capacity of the foundation are improved.
本发明涉及道路施工技术领域,具体是一种山区防沉降复合排水路基快速填筑施工工艺,包括以下步骤:S1.现场勘察与设计,对施工区域进行详细的地质勘察,了解地质条件、地下水位及降雨情况,根据勘察结果进行设计,包括路基的结构设计、排水系统设计以及沉降控制方案,本发明在路基两侧设置排水系统,确保雨水能够迅速排出,防止路基积水引起的软化和沉降,分层填筑和压实,确保每层填料的密实度和均匀性,增强路基的整体稳定性和抗沉降性能,在填筑过程中垂直插入排水板,加速排水和固结,提高地基的稳定性和抗沉降能力。
Rapid filling construction process for anti-sedimentation composite drainage roadbed in mountainous area
The invention relates to the technical field of road construction, in particular to a mountainous area anti-sedimentation composite drainage roadbed rapid filling construction process which comprises the following steps: S1, site investigation and design: carrying out detailed geological investigation on a construction area, knowing geological conditions, underground water level and rainfall conditions, and carrying out design according to an investigation result; comprising roadbed structure design, drainage system design and a settlement control scheme, drainage systems are arranged on the two sides of the roadbed, it is ensured that rainwater can be rapidly drained, softening and settlement caused by roadbed accumulated water are prevented, layered filling and compaction are conducted, the compactness and uniformity of each layer of filler are ensured, and the overall stability and anti-settlement performance of the roadbed are enhanced; and the drainage plates are vertically inserted in the filling process, drainage and consolidation are accelerated, and the stability and anti-settling capacity of the foundation are improved.
本发明涉及道路施工技术领域,具体是一种山区防沉降复合排水路基快速填筑施工工艺,包括以下步骤:S1.现场勘察与设计,对施工区域进行详细的地质勘察,了解地质条件、地下水位及降雨情况,根据勘察结果进行设计,包括路基的结构设计、排水系统设计以及沉降控制方案,本发明在路基两侧设置排水系统,确保雨水能够迅速排出,防止路基积水引起的软化和沉降,分层填筑和压实,确保每层填料的密实度和均匀性,增强路基的整体稳定性和抗沉降性能,在填筑过程中垂直插入排水板,加速排水和固结,提高地基的稳定性和抗沉降能力。
Rapid filling construction process for anti-sedimentation composite drainage roadbed in mountainous area
一种山区防沉降复合排水路基快速填筑施工工艺
CHO KWANG-WON (Autor:in) / WU YONGBIN (Autor:in) / YUAN BAOJUN (Autor:in) / WANG JIEKUN (Autor:in) / LI LINFENG (Autor:in)
18.10.2024
Patent
Elektronische Ressource
Chinesisch
Mountainous area assembly type cantilever composite roadbed structure and construction method
Europäisches Patentamt | 2023
|Drainage structure for soft rock filling roadbed and construction method of roadbed
Europäisches Patentamt | 2020
|Lightweight foam soil applied to roadbed filling of mountainous-area steep road section
Europäisches Patentamt | 2016
|Construction method and system for high-fill roadbed in mountainous area
Europäisches Patentamt | 2023
|