Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Variable lifting point tool for converting and lifting bridge inspection vehicle
The invention discloses a variable lifting point tool for converting and lifting a bridge inspection vehicle, which comprises a main stress component, a first bearing arm and a second bearing arm are arranged in the main stress component in a sliding manner, and the first bearing arm and the second bearing arm are parallel to each other and are opposite in telescopic direction; the main stress assembly is fixed to a steel beam box bottom plate through a structure stabilizing piece, the lower side of the main stress assembly is used for arranging a track of an inspection vehicle, and the outer side end of the first bearing arm and the outer side end of the second bearing arm are used for arranging chain blocks. The main stress assembly comprises a bottom plate and a top plate which are correspondingly arranged up and down, three vertical plates which are arranged in parallel are fixed between the bottom plate and the top plate, a first sliding cavity and a second sliding cavity are formed among the three vertical plates, and the inner side ends of the first bearing arm and the second bearing arm are arranged in the first sliding cavity and the second sliding cavity respectively. The method has the advantages that the construction period is shortened, and the construction cost is reduced.
本发明公开了一种桥梁检查车转换吊装用可变吊点工装,包括主受力组件,所述主受力组件内滑动设置有第一承重臂和第二承重臂,所述第一承重臂与第二承重臂相互平行,且伸缩方向相反;所述主受力组件通过结构稳定件与钢梁箱底板进行固定,所述主受力组件的下侧用于设置检查车的轨道,所述第一承重臂与第二承重臂的外侧端用于设置手拉葫芦;所述主受力组件包括上下对应设置的底板和顶板,所述底板与顶板之间固定有三个平行设置的立板,其三个所述立板之间形成第一滑动腔和第二滑动腔,所述第一承重臂与第二承重臂的内侧端分别设置于第一滑动腔和第二滑动腔内。本发明具有缩短施工周期,降低施工成本的优点。
Variable lifting point tool for converting and lifting bridge inspection vehicle
The invention discloses a variable lifting point tool for converting and lifting a bridge inspection vehicle, which comprises a main stress component, a first bearing arm and a second bearing arm are arranged in the main stress component in a sliding manner, and the first bearing arm and the second bearing arm are parallel to each other and are opposite in telescopic direction; the main stress assembly is fixed to a steel beam box bottom plate through a structure stabilizing piece, the lower side of the main stress assembly is used for arranging a track of an inspection vehicle, and the outer side end of the first bearing arm and the outer side end of the second bearing arm are used for arranging chain blocks. The main stress assembly comprises a bottom plate and a top plate which are correspondingly arranged up and down, three vertical plates which are arranged in parallel are fixed between the bottom plate and the top plate, a first sliding cavity and a second sliding cavity are formed among the three vertical plates, and the inner side ends of the first bearing arm and the second bearing arm are arranged in the first sliding cavity and the second sliding cavity respectively. The method has the advantages that the construction period is shortened, and the construction cost is reduced.
本发明公开了一种桥梁检查车转换吊装用可变吊点工装,包括主受力组件,所述主受力组件内滑动设置有第一承重臂和第二承重臂,所述第一承重臂与第二承重臂相互平行,且伸缩方向相反;所述主受力组件通过结构稳定件与钢梁箱底板进行固定,所述主受力组件的下侧用于设置检查车的轨道,所述第一承重臂与第二承重臂的外侧端用于设置手拉葫芦;所述主受力组件包括上下对应设置的底板和顶板,所述底板与顶板之间固定有三个平行设置的立板,其三个所述立板之间形成第一滑动腔和第二滑动腔,所述第一承重臂与第二承重臂的内侧端分别设置于第一滑动腔和第二滑动腔内。本发明具有缩短施工周期,降低施工成本的优点。
Variable lifting point tool for converting and lifting bridge inspection vehicle
一种桥梁检查车转换吊装用可变吊点工装
WANG LIANGZHOU (Autor:in) / GOU BIN (Autor:in) / SHI MENG (Autor:in) / ZHANG HONG (Autor:in) / LIU JIAN (Autor:in) / LIU BO (Autor:in) / YU SONGLIN (Autor:in) / IKUTANE (Autor:in) / WU TIANCHUN (Autor:in) / ZHU YAPING (Autor:in)
22.10.2024
Patent
Elektronische Ressource
Chinesisch
BRIDGE LIFTING APPARATUS AND BRIDGE LIFTING METHOD THEREFOR
Europäisches Patentamt | 2018
|