Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Totally-closed steel mesh scaffold construction method
The invention discloses a totally-closed steel mesh scaffold construction method, and particularly relates to the technical field of scaffold construction, and the method comprises the steps of S1, construction part preparation, S2, labeling treatment, S3, construction code scanning, S4, construction installation, S5, code scanning rechecking, S6, data storage, S7, patrol rechecking, and S8, stage report uploading. Components 1-9 are each provided with a clear number, a laser mechanical engraving tool is used, the numbers are engraved on the surfaces of the components, the components 1-9 are numbered in sequence, contents to be backed up are selected, and the contents comprise design drawings, sizes, materials, the construction process and progress of the components, information checking and construction guidance. And whether the component information obtained by scanning after multiple times is consistent with the actual construction condition is checked, so that personnel can quickly search the installation defect position for correction, and the use safety of scaffold construction is greatly improved.
本发明公开了一种全封闭钢网片脚手架施工方法,具体涉及脚手架施工技术领域,包括S1、施工零件准备,S2、贴标处理,S3、施工扫码,S4、施工安装,S5、扫码复查,S6、数据储存,S7、巡查复核,S8、阶段报告上传。本发明通过构件1‑9上都应有一个明确的编号,使用激光机械刻画工具,在构件表面刻印编号依次对构件1‑9按照顺序实现编号,选中要备份的内容,包括设计图纸、尺寸、材料,以及构件的施工过程和进度,信息核对与施工指导,核对多次后扫描得到的构件信息与实际施工情况是否一致,人员能够快速查找安装缺陷位置进行改正,大幅度提高脚手架施工使用安全。
Totally-closed steel mesh scaffold construction method
The invention discloses a totally-closed steel mesh scaffold construction method, and particularly relates to the technical field of scaffold construction, and the method comprises the steps of S1, construction part preparation, S2, labeling treatment, S3, construction code scanning, S4, construction installation, S5, code scanning rechecking, S6, data storage, S7, patrol rechecking, and S8, stage report uploading. Components 1-9 are each provided with a clear number, a laser mechanical engraving tool is used, the numbers are engraved on the surfaces of the components, the components 1-9 are numbered in sequence, contents to be backed up are selected, and the contents comprise design drawings, sizes, materials, the construction process and progress of the components, information checking and construction guidance. And whether the component information obtained by scanning after multiple times is consistent with the actual construction condition is checked, so that personnel can quickly search the installation defect position for correction, and the use safety of scaffold construction is greatly improved.
本发明公开了一种全封闭钢网片脚手架施工方法,具体涉及脚手架施工技术领域,包括S1、施工零件准备,S2、贴标处理,S3、施工扫码,S4、施工安装,S5、扫码复查,S6、数据储存,S7、巡查复核,S8、阶段报告上传。本发明通过构件1‑9上都应有一个明确的编号,使用激光机械刻画工具,在构件表面刻印编号依次对构件1‑9按照顺序实现编号,选中要备份的内容,包括设计图纸、尺寸、材料,以及构件的施工过程和进度,信息核对与施工指导,核对多次后扫描得到的构件信息与实际施工情况是否一致,人员能够快速查找安装缺陷位置进行改正,大幅度提高脚手架施工使用安全。
Totally-closed steel mesh scaffold construction method
一种全封闭钢网片脚手架施工方法
LI WENJUAN (Autor:in) / LUO JUNWEI (Autor:in) / WU LIJUN (Autor:in) / DI RUIJI (Autor:in) / LIANG YUEFEI (Autor:in) / WANG XIAOYONG (Autor:in) / YANG ZHONGXIANG (Autor:in) / TIAN YE (Autor:in)
22.10.2024
Patent
Elektronische Ressource
Chinesisch
Construction method of totally-closed electric dustproof awning
Europäisches Patentamt | 2024
|Construction site foundation pit totally-closed structure and construction method thereof
Europäisches Patentamt | 2023
|Totally-closed waterproof roof system and construction method thereof
Europäisches Patentamt | 2022
|Construction method of movable totally-closed assembly type wooden shed
Europäisches Patentamt | 2022
|