Construction method for oil and gas pipeline to penetrate through small ditch
The invention relates to a construction method for an oil and gas pipeline to penetrate through a small ditch. The construction method comprises the following steps that firstly, surveying and setting out are conducted; 2, a riverway is trimmed and cleaned; 3, flow guide steel pipes are installed; 4, backfilling the two sides of the flow guide steel pipe; 5, prefabricating a crossing pipeline section of the oil and gas pipeline; sixthly, the penetrating pipe ditch is excavated; seventhly, the penetrating pipeline section of the oil and gas pipeline is placed in place; 8, pipe stabilizing measures are taken for the crossing pipeline section; ninthly, backfilling the crossing pipeline section; and tenthly, the ditch is dredged, and the landform is restored. The method can save land acquisition cost, reduce earth-rock work amount, improve construction progress and save construction cost.
本发明是一种应用于油气管道穿越小型沟渠的施工方法,包括以下步骤:步骤一:测量放线;步骤二:修整清理河道;步骤三:安装导流钢管;步骤四:导流钢管两侧回填;步骤五:油气管道的穿越管线段预制;步骤六:穿越管沟开挖;步骤七:油气管道的穿越管线段下沟就位;步骤八:对穿越管线段进行稳管措施;步骤九:穿越管线段回填;步骤十:疏通沟渠、恢复地貌。本发明可以节省征地费用,减少土石方工程量,提高施工进度,节省施工成本。
Construction method for oil and gas pipeline to penetrate through small ditch
The invention relates to a construction method for an oil and gas pipeline to penetrate through a small ditch. The construction method comprises the following steps that firstly, surveying and setting out are conducted; 2, a riverway is trimmed and cleaned; 3, flow guide steel pipes are installed; 4, backfilling the two sides of the flow guide steel pipe; 5, prefabricating a crossing pipeline section of the oil and gas pipeline; sixthly, the penetrating pipe ditch is excavated; seventhly, the penetrating pipeline section of the oil and gas pipeline is placed in place; 8, pipe stabilizing measures are taken for the crossing pipeline section; ninthly, backfilling the crossing pipeline section; and tenthly, the ditch is dredged, and the landform is restored. The method can save land acquisition cost, reduce earth-rock work amount, improve construction progress and save construction cost.
本发明是一种应用于油气管道穿越小型沟渠的施工方法,包括以下步骤:步骤一:测量放线;步骤二:修整清理河道;步骤三:安装导流钢管;步骤四:导流钢管两侧回填;步骤五:油气管道的穿越管线段预制;步骤六:穿越管沟开挖;步骤七:油气管道的穿越管线段下沟就位;步骤八:对穿越管线段进行稳管措施;步骤九:穿越管线段回填;步骤十:疏通沟渠、恢复地貌。本发明可以节省征地费用,减少土石方工程量,提高施工进度,节省施工成本。
Construction method for oil and gas pipeline to penetrate through small ditch
一种应用于油气管道穿越小型沟渠的施工方法
DING TONGBU (Autor:in) / SHI WENJIE (Autor:in) / XI DONGHUAI (Autor:in) / ZHAO SONGFENG (Autor:in) / REN JUNKAI (Autor:in)
29.10.2024
Patent
Elektronische Ressource
Chinesisch
Construction method for soil rock stratum tunnel to penetrate through pipeline leakage area
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Waterproof method for cable pipeline to penetrate through wall
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|