Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for repairing water leakage of roof settlement joint
The invention discloses a method for repairing water leakage of a roof settlement joint, and relates to the field of waterproof construction. Comprising the following steps that buildings on the two sides of the settlement joint are cut off, reverse ridges on the edge of the deformation joint are chiseled away, and a flame-retardant plate is arranged at the bottom of the deformation joint; a fireproof plate is arranged in the length direction of the deformation joint, the fireproof plate is attached to the deformation joint, and a V-shaped opening is formed in the upper portion of the fireproof plate; planting steel bars in the middle of the roof structure layer along the length of the deformation joint, pouring concrete and carrying out a closed water test until no water leaks; and the building waterproof layer is subjected to a closed water test, repairing is completed, and the veneer is reversely buckled. By arranging the flame-retardant plate and the fireproof plate, the fireproof effect is improved, and the problem of water leakage is solved through multiple times of closed water tests.
本发明公开了一种屋面沉降缝漏水的修复方法,涉及防水施工领域;包括如下步骤:切除所述沉降缝两侧建筑,凿除变形缝边缘反坎并于所述变形缝底部设置阻燃板;沿所述变形缝长度方向设置防火板,所述防火板贴合所述变形缝,所述防火板上部设置V形开口;于屋面结构层沿所述变形缝长度居中植筋,浇筑混凝土并进行闭水试验至不漏水;建筑防水层再进行闭水试验,完成修复,倒扣饰面板。通过设置阻燃板和防火板提高防火效果,多次进行闭水试验,排除漏水问题的出现。
Method for repairing water leakage of roof settlement joint
The invention discloses a method for repairing water leakage of a roof settlement joint, and relates to the field of waterproof construction. Comprising the following steps that buildings on the two sides of the settlement joint are cut off, reverse ridges on the edge of the deformation joint are chiseled away, and a flame-retardant plate is arranged at the bottom of the deformation joint; a fireproof plate is arranged in the length direction of the deformation joint, the fireproof plate is attached to the deformation joint, and a V-shaped opening is formed in the upper portion of the fireproof plate; planting steel bars in the middle of the roof structure layer along the length of the deformation joint, pouring concrete and carrying out a closed water test until no water leaks; and the building waterproof layer is subjected to a closed water test, repairing is completed, and the veneer is reversely buckled. By arranging the flame-retardant plate and the fireproof plate, the fireproof effect is improved, and the problem of water leakage is solved through multiple times of closed water tests.
本发明公开了一种屋面沉降缝漏水的修复方法,涉及防水施工领域;包括如下步骤:切除所述沉降缝两侧建筑,凿除变形缝边缘反坎并于所述变形缝底部设置阻燃板;沿所述变形缝长度方向设置防火板,所述防火板贴合所述变形缝,所述防火板上部设置V形开口;于屋面结构层沿所述变形缝长度居中植筋,浇筑混凝土并进行闭水试验至不漏水;建筑防水层再进行闭水试验,完成修复,倒扣饰面板。通过设置阻燃板和防火板提高防火效果,多次进行闭水试验,排除漏水问题的出现。
Method for repairing water leakage of roof settlement joint
一种屋面沉降缝漏水的修复方法
ZHOU SHANGLIN (Autor:in) / WU NA (Autor:in)
01.11.2024
Patent
Elektronische Ressource
Chinesisch
Basement settlement joint waterproof structure leakage repairing method
Europäisches Patentamt | 2024
|Basement roof deformation joint leakage repairing structure and repairing method thereof
Europäisches Patentamt | 2023
|Culvert settlement joint water seepage repairing structure and method for repairing settlement joint
Europäisches Patentamt | 2021
|Method for dredging leakage water of roof deformation joint
Europäisches Patentamt | 2024
|