Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dry dock entrance structure with dock gate leakage test function and construction method
The invention relates to a dry dock entrance structure with a dock gate leakage test function and a construction method, and belongs to the technical field of large component prefabricated dry docks. According to the scheme, a cofferdam area is arranged, after a dock gate and a dock entrance are connected and matched with each other, water is injected into the cofferdam area through a water pump, and after the water surface height is flush with the top surface height of the dock entrance, the cofferdam area is closed; a leakage test experiment is carried out on the connection cooperation relation between the dock gate and the dock entrance, and the problem that a traditional construction mode cannot carry out the leakage test experiment on the cooperation relation between the dock gate and the dock entrance in advance is solved.
本发明涉及一种具有坞门试漏功能的干坞坞口结构及施工方法,属于大型构件预制干坞技术领域,本方案通过设置围堰区,在将坞门与坞口相互连接配合后,利用水泵朝围堰区内注水,待水面高度与坞口的顶面高度齐平后,对坞门与坞口的连接配合关系进行试漏实验,解决传统的施工方式无法事先对坞门与坞口的配合关系进行试漏实验的问题。
Dry dock entrance structure with dock gate leakage test function and construction method
The invention relates to a dry dock entrance structure with a dock gate leakage test function and a construction method, and belongs to the technical field of large component prefabricated dry docks. According to the scheme, a cofferdam area is arranged, after a dock gate and a dock entrance are connected and matched with each other, water is injected into the cofferdam area through a water pump, and after the water surface height is flush with the top surface height of the dock entrance, the cofferdam area is closed; a leakage test experiment is carried out on the connection cooperation relation between the dock gate and the dock entrance, and the problem that a traditional construction mode cannot carry out the leakage test experiment on the cooperation relation between the dock gate and the dock entrance in advance is solved.
本发明涉及一种具有坞门试漏功能的干坞坞口结构及施工方法,属于大型构件预制干坞技术领域,本方案通过设置围堰区,在将坞门与坞口相互连接配合后,利用水泵朝围堰区内注水,待水面高度与坞口的顶面高度齐平后,对坞门与坞口的连接配合关系进行试漏实验,解决传统的施工方式无法事先对坞门与坞口的配合关系进行试漏实验的问题。
Dry dock entrance structure with dock gate leakage test function and construction method
一种具有坞门试漏功能的干坞坞口结构及施工方法
YANG YONG (Autor:in) / LIU LIYING (Autor:in) / MA HUI (Autor:in) / YANG CHUNSHAN (Autor:in) / HUANG XUEYANG (Autor:in) / OU ZHENFENG (Autor:in) / WANG CHUANZHI (Autor:in) / DUAN SHANGLEI (Autor:in)
05.11.2024
Patent
Elektronische Ressource
Chinesisch
Dry dock entrance pressure reduction type buoyancy tank dock gate bottom plate structure
Europäisches Patentamt | 2023
|Dock-entrance reconstruction works
Engineering Index Backfile | 1929
Design and construction of the new dock entrance
British Library Conference Proceedings | 1994
|Dry dock entrance prefabrication and installation method
Europäisches Patentamt | 2024
|The construction of the new entrance to tranmere dock
Engineering Index Backfile | 1925
|