Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel sheet pile cofferdam applying tension anchors and construction method
The invention relates to a steel sheet pile cofferdam applying pulling anchors and a construction method, and belongs to the technical field of cofferdam construction, the steel sheet pile cofferdam comprises a cofferdam body and the pulling anchors, the cofferdam body is defined by a plurality of steel pipe piles, any two adjacent steel pipe piles are attached to each other and arranged in parallel, a plurality of ring beams are arranged in the cofferdam body, and the ring beams are connected with the pulling anchors. The shapes of the outer sides of the ring beams are consistent with the shape of the radial section of the inner side of the cofferdam body, the ring beams are attached to the inner wall of the cofferdam body, and the ring beams are sequentially arranged in the direction perpendicular to the ground; a concrete continuous wall is arranged on one side of the cofferdam body, a plurality of pull anchors are arranged on the cofferdam body, one end of any pull anchor is connected with the ring beam located on the uppermost layer, and the other end of any pull anchor is connected with the concrete continuous wall; the fixing device has the characteristic of good fixing effect.
本发明涉及一种应用拉锚的钢板桩围堰及施工方法,属于围堰施工技术领域,包括围堰本体和拉锚,所述围堰本体由若干钢管桩合围构成,任意两相邻所述钢管桩相互贴合且相互平行设置,所述围堰本体内设置有若干圈梁,若干所述圈梁外侧的形状均与围堰本体内侧径向截面形状一致,若干所述圈梁均与围堰本体内壁贴合设置,若干所述圈梁沿垂直于地面方向依次排列;所述围堰本体一侧设置有混凝土连续墙,所述围堰本体设置有若干拉锚,任一所述拉锚的一端与处于最上层的圈梁连接,任一所述拉锚的另一端与混凝土连续墙连接;其具有固定效果好的特点。
Steel sheet pile cofferdam applying tension anchors and construction method
The invention relates to a steel sheet pile cofferdam applying pulling anchors and a construction method, and belongs to the technical field of cofferdam construction, the steel sheet pile cofferdam comprises a cofferdam body and the pulling anchors, the cofferdam body is defined by a plurality of steel pipe piles, any two adjacent steel pipe piles are attached to each other and arranged in parallel, a plurality of ring beams are arranged in the cofferdam body, and the ring beams are connected with the pulling anchors. The shapes of the outer sides of the ring beams are consistent with the shape of the radial section of the inner side of the cofferdam body, the ring beams are attached to the inner wall of the cofferdam body, and the ring beams are sequentially arranged in the direction perpendicular to the ground; a concrete continuous wall is arranged on one side of the cofferdam body, a plurality of pull anchors are arranged on the cofferdam body, one end of any pull anchor is connected with the ring beam located on the uppermost layer, and the other end of any pull anchor is connected with the concrete continuous wall; the fixing device has the characteristic of good fixing effect.
本发明涉及一种应用拉锚的钢板桩围堰及施工方法,属于围堰施工技术领域,包括围堰本体和拉锚,所述围堰本体由若干钢管桩合围构成,任意两相邻所述钢管桩相互贴合且相互平行设置,所述围堰本体内设置有若干圈梁,若干所述圈梁外侧的形状均与围堰本体内侧径向截面形状一致,若干所述圈梁均与围堰本体内壁贴合设置,若干所述圈梁沿垂直于地面方向依次排列;所述围堰本体一侧设置有混凝土连续墙,所述围堰本体设置有若干拉锚,任一所述拉锚的一端与处于最上层的圈梁连接,任一所述拉锚的另一端与混凝土连续墙连接;其具有固定效果好的特点。
Steel sheet pile cofferdam applying tension anchors and construction method
一种应用拉锚的钢板桩围堰及施工方法
SUN LEILEI (Autor:in) / ZHAO JIAN (Autor:in) / LIU CHANGHUI (Autor:in) / GAO JIAN (Autor:in) / AN LUMING (Autor:in) / LUO SHENGHONG (Autor:in) / WEI WENYUE (Autor:in) / MENG FANLONG (Autor:in) / LIU YUXIONG (Autor:in) / ZHANG LINLIN (Autor:in)
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Lassen steel sheet pile cofferdam construction method
Europäisches Patentamt | 2024
|