Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Climbing frame and unloading platform integrated lifting device
The invention relates to the technical field of building equipment, and provides a climbing frame and discharging platform integrated lifting device. In the device, an electric hoist is fixed on a hanger, two reinforcing guide rails on a climbing frame are connected through a hoisting truss, and the hoisting truss is connected with a lifting hook of the electric hoist; the discharging platform is connected to the two reinforcing guide rails. The plurality of attached supports are respectively matched with the two reinforced guide rails, and in each attached support, the reinforced guide rail is sleeved in the rolling support unit in a sliding manner, so that the reinforced guide rail moves along the vertical direction under the driving of the electric hoist; the limiting supporting unit can limit and support the reinforcing guide rail after the climbing frame is lifted to a preset position, so that the climbing frame is fixed to the discharging platform. Therefore, in the construction process, layer-by-layer disassembly and assembly are not needed, the unloading platform and the climbing frame main body synchronously and autonomously climb layer by layer through the electric hoist, tower crane lamp equipment is not needed for assisting in hoisting, the construction safety is greatly improved, and the labor and equipment cost is saved.
本申请涉及建筑设备技术领域,提供了一种爬架卸料平台一体化提升装置。该装置中,电动葫芦固定于吊挂件上,爬架上中两加强导轨之间通过吊装桁架连接,吊装桁架与电动葫芦的吊钩连接;卸料平台连接于两加强导轨上;多个附着支座分别与两加强导轨相适配,每个附着支座中,滚动支撑单元内滑动套装加强导轨,使加强导轨在电动葫芦的带动下沿垂直方向运动;限位支撑单元能够在爬架提升至预定位置后,对加强导轨进行限位支撑,以使爬架与卸料平台固定。籍以,在施工过程中,不需要在进行逐层拆装,且卸料平台和爬架主体通过电动葫芦同步自主逐层爬升,不再需要塔吊灯设备协助吊运,极大的提升了施工安全性,且节约了人工、设备成本。
Climbing frame and unloading platform integrated lifting device
The invention relates to the technical field of building equipment, and provides a climbing frame and discharging platform integrated lifting device. In the device, an electric hoist is fixed on a hanger, two reinforcing guide rails on a climbing frame are connected through a hoisting truss, and the hoisting truss is connected with a lifting hook of the electric hoist; the discharging platform is connected to the two reinforcing guide rails. The plurality of attached supports are respectively matched with the two reinforced guide rails, and in each attached support, the reinforced guide rail is sleeved in the rolling support unit in a sliding manner, so that the reinforced guide rail moves along the vertical direction under the driving of the electric hoist; the limiting supporting unit can limit and support the reinforcing guide rail after the climbing frame is lifted to a preset position, so that the climbing frame is fixed to the discharging platform. Therefore, in the construction process, layer-by-layer disassembly and assembly are not needed, the unloading platform and the climbing frame main body synchronously and autonomously climb layer by layer through the electric hoist, tower crane lamp equipment is not needed for assisting in hoisting, the construction safety is greatly improved, and the labor and equipment cost is saved.
本申请涉及建筑设备技术领域,提供了一种爬架卸料平台一体化提升装置。该装置中,电动葫芦固定于吊挂件上,爬架上中两加强导轨之间通过吊装桁架连接,吊装桁架与电动葫芦的吊钩连接;卸料平台连接于两加强导轨上;多个附着支座分别与两加强导轨相适配,每个附着支座中,滚动支撑单元内滑动套装加强导轨,使加强导轨在电动葫芦的带动下沿垂直方向运动;限位支撑单元能够在爬架提升至预定位置后,对加强导轨进行限位支撑,以使爬架与卸料平台固定。籍以,在施工过程中,不需要在进行逐层拆装,且卸料平台和爬架主体通过电动葫芦同步自主逐层爬升,不再需要塔吊灯设备协助吊运,极大的提升了施工安全性,且节约了人工、设备成本。
Climbing frame and unloading platform integrated lifting device
一种爬架卸料平台一体化提升装置
LI JIANG (Autor:in) / LIU WEI (Autor:in) / LIU LIJUN (Autor:in) / WANG LEI (Autor:in) / LI PENG (Autor:in) / ZHAO CHENGYUN (Autor:in) / ZHAO ZENGJIE (Autor:in) / SHI CHENQIANG (Autor:in) / ZHANG ZE (Autor:in)
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Integrated lifting climbing frame and construction technology thereof
Europäisches Patentamt | 2024
|