Cast-in-place box type channel self-propelled integral type internal mold trolley construction method
The invention relates to the technical field of cast-in-place box type channel construction, in particular to a cast-in-place box type channel self-propelled integral type internal mold trolley construction method which comprises the following steps of surveying and lofting, foundation construction, reinforcing steel bar machining, bottom plate construction, formwork engineering, concrete pouring, mold removal and maintenance and waterproof layer and settlement joint construction. The self-propelled integral type internal mold trolley has good strength, rigidity and stability, meanwhile, a large flat mold is arranged, the quality and flatness of a template abutted seam are improved, and the line type and appearance quality of a concrete finished product are excellent; by adopting the method to construct the cast-in-place box type channel, the personnel investment is reduced, the hoisting operation frequency is reduced, a large amount of cross operation is avoided, and the intrinsic safety is improved during disassembly, assembly, movement and transportation; the integral internal mold trolley designed according to the modular concept is quick, simple and convenient to mount and demount and quick in turnover, and the jack assists the trolley in moving to achieve quick assembly of the trolley; and meanwhile, the translation speed is high, the time for moving and assembling the inner mold is saved, and the purpose of rapid construction is achieved.
本发明涉及现浇箱型通道施工技术领域,具体为现浇箱型通道自行整体式内模台车施工方法,包括如下步骤:测量放样、基础施工、钢筋加工、底板施工、模板工程、混凝土浇筑、拆模和养护、防水层及沉降缝施工;本发明的自行整体式内模台车具有很好的强度、刚度及稳定性,同时配置大块平模,提高了模板拼缝质量和平整度,混凝土成品线型和外观质量优良;采用该方法进行现浇箱型通道施工,降低人员投入,减少了吊装作业频率,避免了大量交叉作业,而且在拆装和移动运输时提升了本质安全;模块化理念设计的整体式内模台车安拆快速、简便、周转快、千斤顶辅助台车移动实现了其快速拼装;同时其平移速度快,节省内模移动拼装的时间,达到了快速施工的目的。
Cast-in-place box type channel self-propelled integral type internal mold trolley construction method
The invention relates to the technical field of cast-in-place box type channel construction, in particular to a cast-in-place box type channel self-propelled integral type internal mold trolley construction method which comprises the following steps of surveying and lofting, foundation construction, reinforcing steel bar machining, bottom plate construction, formwork engineering, concrete pouring, mold removal and maintenance and waterproof layer and settlement joint construction. The self-propelled integral type internal mold trolley has good strength, rigidity and stability, meanwhile, a large flat mold is arranged, the quality and flatness of a template abutted seam are improved, and the line type and appearance quality of a concrete finished product are excellent; by adopting the method to construct the cast-in-place box type channel, the personnel investment is reduced, the hoisting operation frequency is reduced, a large amount of cross operation is avoided, and the intrinsic safety is improved during disassembly, assembly, movement and transportation; the integral internal mold trolley designed according to the modular concept is quick, simple and convenient to mount and demount and quick in turnover, and the jack assists the trolley in moving to achieve quick assembly of the trolley; and meanwhile, the translation speed is high, the time for moving and assembling the inner mold is saved, and the purpose of rapid construction is achieved.
本发明涉及现浇箱型通道施工技术领域,具体为现浇箱型通道自行整体式内模台车施工方法,包括如下步骤:测量放样、基础施工、钢筋加工、底板施工、模板工程、混凝土浇筑、拆模和养护、防水层及沉降缝施工;本发明的自行整体式内模台车具有很好的强度、刚度及稳定性,同时配置大块平模,提高了模板拼缝质量和平整度,混凝土成品线型和外观质量优良;采用该方法进行现浇箱型通道施工,降低人员投入,减少了吊装作业频率,避免了大量交叉作业,而且在拆装和移动运输时提升了本质安全;模块化理念设计的整体式内模台车安拆快速、简便、周转快、千斤顶辅助台车移动实现了其快速拼装;同时其平移速度快,节省内模移动拼装的时间,达到了快速施工的目的。
Cast-in-place box type channel self-propelled integral type internal mold trolley construction method
现浇箱型通道自行整体式内模台车施工方法
FAN HONGLIN (Autor:in) / GAO FENG (Autor:in) / BAI SHANGQING (Autor:in) / CANG YONG (Autor:in) / KIM SANG-WHEE (Autor:in)
12.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Integral self-propelled ditch formwork trolley and construction method
Europäisches Patentamt | 2023
|Self-propelled multifunctional ship lock concrete cast-in-place formwork trolley
Europäisches Patentamt | 2021
|Process for installing integral self-propelled hydraulic internal mold
Europäisches Patentamt | 2021
|Self-propelled trestle trolley for inverted arch trestle trolley
Europäisches Patentamt | 2020
|