Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a precast pile deviation rectifying device and a control method. The precast pile deviation rectifying device comprises a precast pile construction area composed of a high-position positioning component, a low-position positioning component, a connecting component and a site leveling component. Due to the fact that high deviation rectification and low deviation rectification are adopted, and deviation rectification positioning components are made of hard rubber materials, it is guaranteed that the side wall of the precast pile is not damaged, smooth implementation of a deviation rectification path can be guaranteed, timely replacement can be achieved under the condition of abrasion, economical efficiency is guaranteed, and due to the fact that a soft soil foundation is considered and a large-contact-face component making contact with a soil body is adopted, the construction cost is reduced. And the pile and the device are ensured to be vertical, so that the adjustable device horizontal component is adopted, and the stability of pile construction under the soft soil foundation is ensured.
本发明涉及一种预制桩纠偏装置及控制方法,包括高处定位构件、低处定位构件、连接构件以及场地调平构件组成预制桩施工区。本发明由于采用高低两道纠偏,纠偏定位构件采用硬橡胶材质,既保证不损伤预制桩侧壁,也能保障纠偏路径的顺利实施,还可以在有磨损的情况下及时更换,保证经济性,因考虑软土地基,采用大接触面的与土体接触构件,并考虑保证桩和装置竖直,所以采用可调节装置水平构件,保证了在软土地基下桩施工的稳定性。
The invention relates to a precast pile deviation rectifying device and a control method. The precast pile deviation rectifying device comprises a precast pile construction area composed of a high-position positioning component, a low-position positioning component, a connecting component and a site leveling component. Due to the fact that high deviation rectification and low deviation rectification are adopted, and deviation rectification positioning components are made of hard rubber materials, it is guaranteed that the side wall of the precast pile is not damaged, smooth implementation of a deviation rectification path can be guaranteed, timely replacement can be achieved under the condition of abrasion, economical efficiency is guaranteed, and due to the fact that a soft soil foundation is considered and a large-contact-face component making contact with a soil body is adopted, the construction cost is reduced. And the pile and the device are ensured to be vertical, so that the adjustable device horizontal component is adopted, and the stability of pile construction under the soft soil foundation is ensured.
本发明涉及一种预制桩纠偏装置及控制方法,包括高处定位构件、低处定位构件、连接构件以及场地调平构件组成预制桩施工区。本发明由于采用高低两道纠偏,纠偏定位构件采用硬橡胶材质,既保证不损伤预制桩侧壁,也能保障纠偏路径的顺利实施,还可以在有磨损的情况下及时更换,保证经济性,因考虑软土地基,采用大接触面的与土体接触构件,并考虑保证桩和装置竖直,所以采用可调节装置水平构件,保证了在软土地基下桩施工的稳定性。
Precast pile deviation rectifying device and control method
一种预制桩纠偏装置及控制方法
15.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deviation rectifying method for silt geological precast pile disturbed by excavation
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Iron tower pile foundation deviation rectifying structure and deviation rectifying process thereof
Europäisches Patentamt | 2024
|Soft soil foundation pile deviation rectifying method
Europäisches Patentamt | 2021
|