Pi-shaped steel-concrete composite beam prefabricating method
The invention provides a method for prefabricating a pi-shaped steel-concrete composite beam, which is completed in the prefabrication of the pi-shaped steel-concrete composite beam, and the process for manufacturing the pi-shaped steel-concrete composite beam comprises the following steps of: conveying materials for manufacturing the pi-shaped steel-concrete composite beam to a left loading and unloading vehicle area and a right loading and unloading vehicle area through an automobile; the manufactured pi-shaped steel-concrete composite beam falls onto automobiles located on the left loading and unloading vehicle area and the right loading and unloading vehicle area through a gantry crane to be transported away, a steel reinforcement framework of a bridge deck is bundled in a steel reinforcement bundling area, concrete is poured into a manufacturing mold of the top plate of the pi-shaped steel-concrete composite beam, and the steel reinforcement framework and a steel beam are poured after the concrete is solidified. And the manufacturing mold for the top plate of the pi-shaped steel-concrete composite beam is detached, and the manufactured pi-shaped steel-concrete composite beam is transferred to the left pi-shaped steel-concrete composite beam storage area and the right pi-shaped steel-concrete composite beam storage area through a gantry crane. The method has the advantage of symmetrical layout, and solves the problem that one end is busy and the other end is idle in the flowing water type layout of one end in and one end out in the existing Pi-shaped steel-concrete composite beam precast yard.
本发明提供了π型钢混组合梁预制方法,在π型钢混组合梁预制内完成,制作π型钢混组合梁的过程为:将制作π型钢混组合梁的材料通过汽车输送到左右装卸车区,制作好的π型钢混组合梁通过龙门吊掉到位于左右装卸车区上的汽车上被运走,在钢筋绑扎区捆扎出桥面板的钢筋骨架,将混凝土浇筑到兀形钢混组合梁顶板制作模具内,混凝土固化后浇筑住钢筋骨架和钢梁,从而制作出π型钢混组合梁,拆卸兀形钢混组合梁顶板制作模具,将制作出的π型钢混组合梁通过龙门吊转运到左右π型钢混组合梁存放区。本发明具有对称布局的优点,解决了现有的π型钢混组合梁预制场流水式一端进一端出的布局所存在的会产生一端繁忙而另外一端闲置的问题。
Pi-shaped steel-concrete composite beam prefabricating method
The invention provides a method for prefabricating a pi-shaped steel-concrete composite beam, which is completed in the prefabrication of the pi-shaped steel-concrete composite beam, and the process for manufacturing the pi-shaped steel-concrete composite beam comprises the following steps of: conveying materials for manufacturing the pi-shaped steel-concrete composite beam to a left loading and unloading vehicle area and a right loading and unloading vehicle area through an automobile; the manufactured pi-shaped steel-concrete composite beam falls onto automobiles located on the left loading and unloading vehicle area and the right loading and unloading vehicle area through a gantry crane to be transported away, a steel reinforcement framework of a bridge deck is bundled in a steel reinforcement bundling area, concrete is poured into a manufacturing mold of the top plate of the pi-shaped steel-concrete composite beam, and the steel reinforcement framework and a steel beam are poured after the concrete is solidified. And the manufacturing mold for the top plate of the pi-shaped steel-concrete composite beam is detached, and the manufactured pi-shaped steel-concrete composite beam is transferred to the left pi-shaped steel-concrete composite beam storage area and the right pi-shaped steel-concrete composite beam storage area through a gantry crane. The method has the advantage of symmetrical layout, and solves the problem that one end is busy and the other end is idle in the flowing water type layout of one end in and one end out in the existing Pi-shaped steel-concrete composite beam precast yard.
本发明提供了π型钢混组合梁预制方法,在π型钢混组合梁预制内完成,制作π型钢混组合梁的过程为:将制作π型钢混组合梁的材料通过汽车输送到左右装卸车区,制作好的π型钢混组合梁通过龙门吊掉到位于左右装卸车区上的汽车上被运走,在钢筋绑扎区捆扎出桥面板的钢筋骨架,将混凝土浇筑到兀形钢混组合梁顶板制作模具内,混凝土固化后浇筑住钢筋骨架和钢梁,从而制作出π型钢混组合梁,拆卸兀形钢混组合梁顶板制作模具,将制作出的π型钢混组合梁通过龙门吊转运到左右π型钢混组合梁存放区。本发明具有对称布局的优点,解决了现有的π型钢混组合梁预制场流水式一端进一端出的布局所存在的会产生一端繁忙而另外一端闲置的问题。
Pi-shaped steel-concrete composite beam prefabricating method
一种π型钢混组合梁预制方法
YE SHEN (Autor:in) / WANG FEI (Autor:in) / CHEN HAO (Autor:in) / CHEN MING (Autor:in) / SUN XIAYU (Autor:in) / WANG LU (Autor:in) / HUANG SIJIE (Autor:in) / TIAN XIANGGANG (Autor:in) / WANG XUHUI (Autor:in) / LU ZHOU (Autor:in)
15.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E01D
BRIDGES
,
Brücken
Telescopic sliding formwork device for prefabricating steel-concrete composite beam
Europäisches Patentamt | 2021
|Prestressed concrete T-shaped beam on-site prefabricating erection construction method
Europäisches Patentamt | 2015
|Large box-shaped concrete member and prefabricating method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|