The invention relates to a concrete structure beam formwork construction method which is based on an existing concrete structure beam formwork and comprises the following steps that S1, construction preparation is conducted, specifically, a construction drawing and a construction scheme are checked, and the size of the needed structure beam formwork is determined; s2, positioning and line snapping are conducted, specifically, a positioning line of a beam needing to be constructed is measured, placed and popped out on a floor of the next layer in the construction area; s3, scaffold installation is conducted, specifically, the scaffold is erected on the next floor of the construction area according to the construction requirement of the concrete structural beam; s4, wood processing is conducted, specifically, according to the determined size of the concrete structure beam formwork, the plates and the wood braces forming the concrete structure beam formwork are cut and processed; according to the method, the plate and the square wood are used for pre-assembling the beam formwork, the beam formwork is hoisted to the corresponding position on the scaffold used for supporting and construction assistance, and finally beam formwork installation is completed, so that the operation time of constructors on the scaffold is shortened, the influence of the scaffold on beam formwork installation is reduced, and the construction efficiency is improved. Therefore, the installation efficiency of the beam formwork and the operation safety of constructors are improved.
本发明涉及一种混凝土结构梁模施工方法,基于既有的混凝土结构梁模,包括如下步骤:S1、施工准备:核对施工图纸及施工方案,确定所需结构梁模的尺寸;S2、定位弹线:在施工区域下一层楼板上测放并弹出所需施工梁的定位线;S3、脚手架安装:在施工区域下一层楼板上根据混凝土结构梁施工需要进行脚手架的搭设;S4、木料加工:根据定好的混凝土结构梁模尺寸,对组成混凝土结构梁模的板块和木枋进行裁切加工;本申请通过使用板块和木枋进行梁模预拼装,吊放至用于支撑和施工辅助的脚手架上的相应位置,最终完成梁模的安装,从而减少施工人员于脚手架上的作业时间,进而降低脚手架对梁模安装的影响,以此增加梁模的安装效率以及施工人员作业的安全性。
Concrete structure beam formwork construction method
The invention relates to a concrete structure beam formwork construction method which is based on an existing concrete structure beam formwork and comprises the following steps that S1, construction preparation is conducted, specifically, a construction drawing and a construction scheme are checked, and the size of the needed structure beam formwork is determined; s2, positioning and line snapping are conducted, specifically, a positioning line of a beam needing to be constructed is measured, placed and popped out on a floor of the next layer in the construction area; s3, scaffold installation is conducted, specifically, the scaffold is erected on the next floor of the construction area according to the construction requirement of the concrete structural beam; s4, wood processing is conducted, specifically, according to the determined size of the concrete structure beam formwork, the plates and the wood braces forming the concrete structure beam formwork are cut and processed; according to the method, the plate and the square wood are used for pre-assembling the beam formwork, the beam formwork is hoisted to the corresponding position on the scaffold used for supporting and construction assistance, and finally beam formwork installation is completed, so that the operation time of constructors on the scaffold is shortened, the influence of the scaffold on beam formwork installation is reduced, and the construction efficiency is improved. Therefore, the installation efficiency of the beam formwork and the operation safety of constructors are improved.
本发明涉及一种混凝土结构梁模施工方法,基于既有的混凝土结构梁模,包括如下步骤:S1、施工准备:核对施工图纸及施工方案,确定所需结构梁模的尺寸;S2、定位弹线:在施工区域下一层楼板上测放并弹出所需施工梁的定位线;S3、脚手架安装:在施工区域下一层楼板上根据混凝土结构梁施工需要进行脚手架的搭设;S4、木料加工:根据定好的混凝土结构梁模尺寸,对组成混凝土结构梁模的板块和木枋进行裁切加工;本申请通过使用板块和木枋进行梁模预拼装,吊放至用于支撑和施工辅助的脚手架上的相应位置,最终完成梁模的安装,从而减少施工人员于脚手架上的作业时间,进而降低脚手架对梁模安装的影响,以此增加梁模的安装效率以及施工人员作业的安全性。
Concrete structure beam formwork construction method
一种混凝土结构梁模施工方法
LU ZHANLEI (Autor:in) / ZHONG YUEZHEN (Autor:in) / HU JIAHENG (Autor:in) / GAO XIUHAN (Autor:in) / HU CHENGYOU (Autor:in) / ZHANG CHENGZHOU (Autor:in) / ZHU YAZHOU (Autor:in) / HAN LU (Autor:in) / LIN WENBIAO (Autor:in)
19.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|