Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mounting equipment and mounting method for whole-section prefabricated pipe gallery
The invention discloses mounting equipment and a mounting method for a whole-section prefabricated pipe gallery. The supporting beam frame has a preset length and penetrates through the pipe gallery sections in the length direction of the supporting beam frame. The three supporting columns are sequentially arranged in the length direction of the supporting beam frame, the three supporting columns are all supported below the supporting beam frame and can ascend and descend, the first supporting column is arranged on the outer side of one end of the pipe gallery section, and the second supporting column and/or the third supporting column penetrate through the pipe gallery section through ascending and descending and are/is arranged on the outer side of the other end of the pipe gallery section. The three moving vehicles are supported below the three supporting columns correspondingly, the first moving vehicle is arranged on the outer side of one end of the pipe gallery section, and the second moving vehicle and/or the third moving vehicle penetrate through the pipe gallery section along with the second supporting column and/or the third supporting column and are arranged on the outer side of the other end of the pipe gallery section. According to the mounting equipment, the pipe gallery sections can be flexibly supported and carried, and efficient mounting of the whole section of prefabricated pipe gallery can be rapidly and conveniently completed.
本发明公开了一种整节段预制管廊安装装备及安装方法,安装装备中。支撑梁架具有预设长度,支撑梁架沿其长度方向贯穿管廊节。三个支撑柱沿支撑梁架的长度方向顺序布置,三个支撑柱均支撑在支撑梁架的下方,三个支撑柱均可升降,其中,第一支撑柱设置在管廊节的一端外侧,第二支撑柱和/或第三支撑柱通过升降穿过管廊节并设置在管廊节的另一端外侧。三个移动车分别支撑在三个支撑柱的下方,其中,第一移动车设置在管廊节的一端外侧,第二移动车和/或第三移动车通过随第二支撑柱和/或第三支撑柱穿过管廊节并设置在管廊节的另一端外侧。本发明的安装装备可以灵活托起搬运管廊节,快速便捷的完成整节段预制管廊高效安装。
Mounting equipment and mounting method for whole-section prefabricated pipe gallery
The invention discloses mounting equipment and a mounting method for a whole-section prefabricated pipe gallery. The supporting beam frame has a preset length and penetrates through the pipe gallery sections in the length direction of the supporting beam frame. The three supporting columns are sequentially arranged in the length direction of the supporting beam frame, the three supporting columns are all supported below the supporting beam frame and can ascend and descend, the first supporting column is arranged on the outer side of one end of the pipe gallery section, and the second supporting column and/or the third supporting column penetrate through the pipe gallery section through ascending and descending and are/is arranged on the outer side of the other end of the pipe gallery section. The three moving vehicles are supported below the three supporting columns correspondingly, the first moving vehicle is arranged on the outer side of one end of the pipe gallery section, and the second moving vehicle and/or the third moving vehicle penetrate through the pipe gallery section along with the second supporting column and/or the third supporting column and are arranged on the outer side of the other end of the pipe gallery section. According to the mounting equipment, the pipe gallery sections can be flexibly supported and carried, and efficient mounting of the whole section of prefabricated pipe gallery can be rapidly and conveniently completed.
本发明公开了一种整节段预制管廊安装装备及安装方法,安装装备中。支撑梁架具有预设长度,支撑梁架沿其长度方向贯穿管廊节。三个支撑柱沿支撑梁架的长度方向顺序布置,三个支撑柱均支撑在支撑梁架的下方,三个支撑柱均可升降,其中,第一支撑柱设置在管廊节的一端外侧,第二支撑柱和/或第三支撑柱通过升降穿过管廊节并设置在管廊节的另一端外侧。三个移动车分别支撑在三个支撑柱的下方,其中,第一移动车设置在管廊节的一端外侧,第二移动车和/或第三移动车通过随第二支撑柱和/或第三支撑柱穿过管廊节并设置在管廊节的另一端外侧。本发明的安装装备可以灵活托起搬运管廊节,快速便捷的完成整节段预制管廊高效安装。
Mounting equipment and mounting method for whole-section prefabricated pipe gallery
一种整节段预制管廊安装装备及安装方法
WANG CHUNYAN (Autor:in) / DONG SHIYI (Autor:in) / ZHUO SHUXIAO (Autor:in)
22.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Prefabricated pipe gallery sealing rubber strip mounting device
Europäisches Patentamt | 2024
|Overweight prefabricated pipe gallery mounting system and construction method thereof
Europäisches Patentamt | 2021
|Simple and quick mounting and positioning method for first section of prefabricated pipe gallery
Europäisches Patentamt | 2021
|Construction method for mounting groove body of electric power prefabricated pipe gallery
Europäisches Patentamt | 2024
|