Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
One-time leveling construction method for double-layer two-way steel bar large-area terrace
The invention relates to the technical field of floor leveling, in particular to a double-layer two-way steel bar large-area floor one-time leveling construction method which comprises the following steps that S1, firstly, an elevation control track assembly is manufactured through site angle steel waste, fixing screws and supporting nuts before construction; the surface height of the angle steel of the elevation control track made of the angle steel can be controlled through a level gauge, and the purpose of elevation control is achieved by adjusting the supporting nuts. S2, secondly, a road surface leveling machine is selected as a leveling machine; s3, the two ends of the leveling machine are held by three manipulators to abut against the side edge of the elevation control track to conduct vibration leveling, the elevation control track supports the leveling machine, leveling must be conducted backwards in the pouring direction, and footprints are prevented from being left; and S4, finally, when the concrete is initially set, the elevation control track is dismantled, a groove reserved in the elevation control track is manually filled with reserved concrete, and the concrete is compacted and rubbed to be flat. The method has the technical effects of improving the working efficiency and saving the cost.
本发明涉及的地坪找平技术领域,具体为一种双层双向钢筋大面积地坪一次找平施工方法,包括如下步骤:S1、首先施工前利用现场角钢废料、固定螺杆和支撑螺母制作标高控制轨道组件,由角钢制作而成的标高控制轨道可以用水准仪控制其角钢表面高度,通过调节支撑螺母来达到标高控制的目的;S2、其次整平机械选用路面整平机;S3、之后由三名操作手把持找平机两端紧靠标高控制轨道侧边震动找平,标高控制轨道对找平机进行支撑,找平必须沿浇筑方向后退进行,以防留下脚印;S4、最后在混凝土初凝时,拆除标高控制轨道,采用预留混凝土人工填补标高控制轨道留下的凹槽,并压实搓平。本发明具有提高工作效率、节约成本的技术效果。
One-time leveling construction method for double-layer two-way steel bar large-area terrace
The invention relates to the technical field of floor leveling, in particular to a double-layer two-way steel bar large-area floor one-time leveling construction method which comprises the following steps that S1, firstly, an elevation control track assembly is manufactured through site angle steel waste, fixing screws and supporting nuts before construction; the surface height of the angle steel of the elevation control track made of the angle steel can be controlled through a level gauge, and the purpose of elevation control is achieved by adjusting the supporting nuts. S2, secondly, a road surface leveling machine is selected as a leveling machine; s3, the two ends of the leveling machine are held by three manipulators to abut against the side edge of the elevation control track to conduct vibration leveling, the elevation control track supports the leveling machine, leveling must be conducted backwards in the pouring direction, and footprints are prevented from being left; and S4, finally, when the concrete is initially set, the elevation control track is dismantled, a groove reserved in the elevation control track is manually filled with reserved concrete, and the concrete is compacted and rubbed to be flat. The method has the technical effects of improving the working efficiency and saving the cost.
本发明涉及的地坪找平技术领域,具体为一种双层双向钢筋大面积地坪一次找平施工方法,包括如下步骤:S1、首先施工前利用现场角钢废料、固定螺杆和支撑螺母制作标高控制轨道组件,由角钢制作而成的标高控制轨道可以用水准仪控制其角钢表面高度,通过调节支撑螺母来达到标高控制的目的;S2、其次整平机械选用路面整平机;S3、之后由三名操作手把持找平机两端紧靠标高控制轨道侧边震动找平,标高控制轨道对找平机进行支撑,找平必须沿浇筑方向后退进行,以防留下脚印;S4、最后在混凝土初凝时,拆除标高控制轨道,采用预留混凝土人工填补标高控制轨道留下的凹槽,并压实搓平。本发明具有提高工作效率、节约成本的技术效果。
One-time leveling construction method for double-layer two-way steel bar large-area terrace
双层双向钢筋大面积地坪一次找平施工方法
GAO YUAN (Autor:in) / ZHAO ZHIWEI (Autor:in) / PAN JIAN (Autor:in)
22.11.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Building terrace concrete construction leveling method
Europäisches Patentamt | 2023
|Laser leveling equipment for large-area terrace of steel structure factory building
Europäisches Patentamt | 2024
|Terrace adjustable device and terrace leveling method
Europäisches Patentamt | 2023
|Large-area steel plate terrace construction equipment and construction method
Europäisches Patentamt | 2024
|