Construction method of assembled mortar construction protective shed
The invention provides an assembly type mortar construction protective shed construction method, and belongs to the technical field of mortar construction protective shed construction.The assembly type mortar construction protective shed construction method comprises the following specific steps that the size of a protective shed is determined according to the size of a mortar tank and a drawing, and safety allowance is reserved; after paying-off construction is conducted on the periphery of the determined protective shed, a supporting base is fixed, concrete construction is conducted on the ground, and a basic face is poured; the structural size of the protective shed is determined according to a drawing and the actual field environment, and the protective shed is decomposed and then cast; after the concrete is solidified, the cast protective shed framework is moved to a construction site in sequence and is installed and fixed upwards in sequence along the supporting base, and protective shed framework construction is conducted; after the frame structure is installed, framework sealing is started; according to the mortar construction protective shed, the problems that a traditional protective shed is difficult to erect and long in time consumption, and the protective shed is low in stability and difficult to bear severe weather can be solved.
本发明提供了一种组装式砂浆施工防护棚构建方法,属于砂浆施工防护棚施工技术领域,该组装式砂浆施工防护棚构建方法包括以下具体步骤:根据砂浆罐大小以及图纸确定防护棚大小,预留安全余量;在确定的防护棚周围进行放线施工后固定支撑底座,并在地面上进行混凝土施工,浇筑基本面;根据图纸以及现场实际环境确定防护棚的结构尺寸,对其进行分解后铸造;在混凝土凝固后依次将铸造后的防护棚骨架移动至施工场地,依次沿支撑底座向上安装固定,进行防护棚骨架施工;待框架结构安装完成后,开始进行骨架密封;在组装完成的砂浆施工防护棚上安装警示标志,本发明能够解决传统防护棚搭设方式困难、耗时长,且防护棚稳定性低,难以承受恶劣天气的问题。
Construction method of assembled mortar construction protective shed
The invention provides an assembly type mortar construction protective shed construction method, and belongs to the technical field of mortar construction protective shed construction.The assembly type mortar construction protective shed construction method comprises the following specific steps that the size of a protective shed is determined according to the size of a mortar tank and a drawing, and safety allowance is reserved; after paying-off construction is conducted on the periphery of the determined protective shed, a supporting base is fixed, concrete construction is conducted on the ground, and a basic face is poured; the structural size of the protective shed is determined according to a drawing and the actual field environment, and the protective shed is decomposed and then cast; after the concrete is solidified, the cast protective shed framework is moved to a construction site in sequence and is installed and fixed upwards in sequence along the supporting base, and protective shed framework construction is conducted; after the frame structure is installed, framework sealing is started; according to the mortar construction protective shed, the problems that a traditional protective shed is difficult to erect and long in time consumption, and the protective shed is low in stability and difficult to bear severe weather can be solved.
本发明提供了一种组装式砂浆施工防护棚构建方法,属于砂浆施工防护棚施工技术领域,该组装式砂浆施工防护棚构建方法包括以下具体步骤:根据砂浆罐大小以及图纸确定防护棚大小,预留安全余量;在确定的防护棚周围进行放线施工后固定支撑底座,并在地面上进行混凝土施工,浇筑基本面;根据图纸以及现场实际环境确定防护棚的结构尺寸,对其进行分解后铸造;在混凝土凝固后依次将铸造后的防护棚骨架移动至施工场地,依次沿支撑底座向上安装固定,进行防护棚骨架施工;待框架结构安装完成后,开始进行骨架密封;在组装完成的砂浆施工防护棚上安装警示标志,本发明能够解决传统防护棚搭设方式困难、耗时长,且防护棚稳定性低,难以承受恶劣天气的问题。
Construction method of assembled mortar construction protective shed
一种组装式砂浆施工防护棚构建方法