Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prestressed fabricated concrete building structure
The prestressed fabricated concrete building structure comprises a concrete layer, a plurality of positioning grooves are formed in the concrete layer, prefabricated columns are inserted into the positioning grooves, the prefabricated columns are connected through a plurality of reinforcing columns, extending assemblies are arranged at the bottoms in the prefabricated columns, and the reinforcing columns are connected with the extending assemblies. Four extending plates are arranged on the extending assembly, the positioning groove is a square groove, and corresponding grooves corresponding to the extending plates are formed in the inner wall of each side of the positioning groove. The prefabricated column has the beneficial effects that the ends of the extending plates finally penetrate through the penetrating openings and enter the corresponding grooves, then a worker pours cement or concrete on site, the cement or the concrete enters the corresponding grooves along the grouting holes, and finally the penetrating ends of the extending plates are wrapped with the cement or the concrete, so that the stability of installation of the prefabricated column is guaranteed, and the construction efficiency is improved. And moreover, cracking caused by stress change between the prefabricated column and the concrete layer can be effectively prevented, and the shock resistance and the overall stability of a building structure are improved.
本发明公开了一种预应力装配式混凝土建筑结构,包括混凝土层,所述混凝土层上开设有多个定位槽,所述定位槽内插入有预制柱,所述预制柱之间通过若干加强柱进行连接,所述预制柱内底部设置有伸出组件,所述伸出组件上设置有四根伸出板,所述定位槽为方形槽,所述定位槽的每侧内壁均开设有对应所述伸出板的对应槽。有益效果:伸出板的端部最终贯穿贯穿口,进入对应槽内,然后工作人员再现场浇筑水泥或者混凝土,水泥或者混凝土顺着注浆孔进入对应的对应槽内,最终水泥或者混凝土包裹住伸出板的穿进端部,从而保证预制柱安装的稳固性能,且能够有效阻止预制柱和混凝土层之间因为应力变化而产生的开裂,提高了建筑结构的抗震性和整体的稳定性。
Prestressed fabricated concrete building structure
The prestressed fabricated concrete building structure comprises a concrete layer, a plurality of positioning grooves are formed in the concrete layer, prefabricated columns are inserted into the positioning grooves, the prefabricated columns are connected through a plurality of reinforcing columns, extending assemblies are arranged at the bottoms in the prefabricated columns, and the reinforcing columns are connected with the extending assemblies. Four extending plates are arranged on the extending assembly, the positioning groove is a square groove, and corresponding grooves corresponding to the extending plates are formed in the inner wall of each side of the positioning groove. The prefabricated column has the beneficial effects that the ends of the extending plates finally penetrate through the penetrating openings and enter the corresponding grooves, then a worker pours cement or concrete on site, the cement or the concrete enters the corresponding grooves along the grouting holes, and finally the penetrating ends of the extending plates are wrapped with the cement or the concrete, so that the stability of installation of the prefabricated column is guaranteed, and the construction efficiency is improved. And moreover, cracking caused by stress change between the prefabricated column and the concrete layer can be effectively prevented, and the shock resistance and the overall stability of a building structure are improved.
本发明公开了一种预应力装配式混凝土建筑结构,包括混凝土层,所述混凝土层上开设有多个定位槽,所述定位槽内插入有预制柱,所述预制柱之间通过若干加强柱进行连接,所述预制柱内底部设置有伸出组件,所述伸出组件上设置有四根伸出板,所述定位槽为方形槽,所述定位槽的每侧内壁均开设有对应所述伸出板的对应槽。有益效果:伸出板的端部最终贯穿贯穿口,进入对应槽内,然后工作人员再现场浇筑水泥或者混凝土,水泥或者混凝土顺着注浆孔进入对应的对应槽内,最终水泥或者混凝土包裹住伸出板的穿进端部,从而保证预制柱安装的稳固性能,且能够有效阻止预制柱和混凝土层之间因为应力变化而产生的开裂,提高了建筑结构的抗震性和整体的稳定性。
Prestressed fabricated concrete building structure
一种预应力装配式混凝土建筑结构
SUN YULI (Autor:in) / CHEN HAO (Autor:in) / LIU XIAOKUN (Autor:in) / LU LU (Autor:in) / SUN ZUFU (Autor:in)
26.11.2024
Patent
Elektronische Ressource
Chinesisch
Fabricated prestressed high-strength concrete pavement
Europäisches Patentamt | 2020
|Fully-fabricated prestressed concrete frame structure anti-seismic joint
Europäisches Patentamt | 2020
|Prestressed concrete fabricated foundation structure and construction method thereof
Europäisches Patentamt | 2023
|Concrete building columns prestressed
Engineering Index Backfile | 1949
|Fabricated prestressed concrete composite beam column frame
Europäisches Patentamt | 2024
|