Nuclear power station stainless steel pool wall post-pasting construction structure and nuclear power station stainless steel pool wall post-pasting construction method
The invention discloses a nuclear power station stainless steel pool wall post-pasting construction structure and method. The nuclear power station stainless steel pool wall post-pasting construction structure comprises a first structure on the upper portion and a second structure on the lower portion. The first structure comprises a first anchoring system and a first covering plate; the first anchoring system comprises angle steel, first double-U-shaped steel, an embedded part and a sleeve. The second structure comprises a second anchoring system and a large plate module, and the large plate module is composed of a plurality of longitudinal second covering plates; the second anchoring system comprises second double-U-shaped steel, third double-U-shaped steel, fourth double-U-shaped steel and a rail. And the first anchoring system and the second anchoring system are anchored on the concrete main body structure, and form a pool wall peripheral plane structure together with the first covering plate and the large plate module. The structural form of the stainless steel pool is improved, part of on-site weld joints are omitted, part of on-site weld joints are optimized to be prefabricated weld joints, construction feasibility is improved, construction difficulty is reduced, and cost and progress pressure can be remarkably reduced.
本发明公开了一种核电站不锈钢水池池壁后贴法施工结构和方法,包括上部的第一结构和下部的第二结构;第一结构包括第一锚固系统和第一覆面板;第一锚固系统包括角钢、第一双U型钢、预埋件和套管;第二结构包括第二锚固系统和大板模块,大板模块由若干纵向的第二覆面板组成;第二锚固系统包括第二双U型钢、第三双U型钢、第四双U型钢和轨道;第一锚固系统和第二锚固系统锚固在混凝土主体结构上,与第一覆面板和大板模块共同形成池壁四周平面结构。本发明对不锈钢水池结构形式进行了改进,取消了部分现场焊缝,优化部分现场焊缝为预制焊缝,提高了施工可行性,减小施工难度,且能显著减小成本和进度压力。
Nuclear power station stainless steel pool wall post-pasting construction structure and nuclear power station stainless steel pool wall post-pasting construction method
The invention discloses a nuclear power station stainless steel pool wall post-pasting construction structure and method. The nuclear power station stainless steel pool wall post-pasting construction structure comprises a first structure on the upper portion and a second structure on the lower portion. The first structure comprises a first anchoring system and a first covering plate; the first anchoring system comprises angle steel, first double-U-shaped steel, an embedded part and a sleeve. The second structure comprises a second anchoring system and a large plate module, and the large plate module is composed of a plurality of longitudinal second covering plates; the second anchoring system comprises second double-U-shaped steel, third double-U-shaped steel, fourth double-U-shaped steel and a rail. And the first anchoring system and the second anchoring system are anchored on the concrete main body structure, and form a pool wall peripheral plane structure together with the first covering plate and the large plate module. The structural form of the stainless steel pool is improved, part of on-site weld joints are omitted, part of on-site weld joints are optimized to be prefabricated weld joints, construction feasibility is improved, construction difficulty is reduced, and cost and progress pressure can be remarkably reduced.
本发明公开了一种核电站不锈钢水池池壁后贴法施工结构和方法,包括上部的第一结构和下部的第二结构;第一结构包括第一锚固系统和第一覆面板;第一锚固系统包括角钢、第一双U型钢、预埋件和套管;第二结构包括第二锚固系统和大板模块,大板模块由若干纵向的第二覆面板组成;第二锚固系统包括第二双U型钢、第三双U型钢、第四双U型钢和轨道;第一锚固系统和第二锚固系统锚固在混凝土主体结构上,与第一覆面板和大板模块共同形成池壁四周平面结构。本发明对不锈钢水池结构形式进行了改进,取消了部分现场焊缝,优化部分现场焊缝为预制焊缝,提高了施工可行性,减小施工难度,且能显著减小成本和进度压力。
Nuclear power station stainless steel pool wall post-pasting construction structure and nuclear power station stainless steel pool wall post-pasting construction method
一种核电站不锈钢水池池壁后贴法施工结构和方法
XU KAIXUN (Autor:in) / ZHENG CHAO (Autor:in) / ZHU SHUSHU (Autor:in) / ZHU DEGUO (Autor:in) / XU MING (Autor:in) / QIU YI (Autor:in) / GU YOU (Autor:in) / AN HUAKANG (Autor:in) / ZHANG KANGDONG (Autor:in) / GAO WANDONG (Autor:in)
29.11.2024
Patent
Elektronische Ressource
Chinesisch
Method for newly building steel structure foundation on seawater pool wall of nuclear power station