Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Special plastic steel combined mold structure for transformer substation equipment foundation and combined assembly method thereof
The invention discloses a special plastic steel combined mold structure for a transformer substation equipment foundation and a combined assembly method thereof, the mold structure comprises side mold plates and right-angle mold plates, the side mold plates and the right-angle mold plates are fixedly connected through inter-plate connecting pieces, and the stability and accuracy of the mold plates are ensured through auxiliary structures such as reinforcing plates, positioning pins and positioning holes. The connecting hole comprises a column section and a reducing section, and is matched with the lead screw, the sliding piece and the two connecting rods to achieve tight connection between the templates. In addition, the sliding piece is composed of the fixed sleeve and the rotary sleeve, and the distance between the templates can be adjusted through the two connecting rods. And the side templates have general standard specifications and dimensions, so that quick model selection and assembly are facilitated. The combined assembling method provided by the invention comprises the steps of template classification and coding, model selection and positioning, foundation paying-off and positioning, mold assembling, checking and rechecking and the like. Compared with the prior art, the repeated utilization rate and the construction efficiency of the formwork are remarkably improved, the pouring quality is guaranteed, the cost is reduced, and the formwork is suitable for standardized production of transformer substation equipment foundation pouring.
本发明公开了一种变电站设备基础专用塑钢组合模具结构及其组合装配方法,该模具结构包括侧模板和直角模板,通过板间连接件实现固定连接,并通过加强板、定位销和定位孔等辅助结构确保模板的稳定性和准确性。连接孔包括柱段和变径段,配合丝杆和滑动件及二连杆实现模板之间的紧密连接。此外,滑动件由固定套筒和旋转套筒组成,可通过二连杆调节模板间距。侧模板具有通用标准型规格尺寸,便于快速选型和组装。本发明提供的组合装配方法包括模板归类编码、选型定位、基础放线定位、模具组装及校核复查等步骤。与现有技术相比,本发明显著提高了模板的重复利用率和施工效率,保证了浇筑质量,降低了成本,适用于变电站设备基础浇筑的标准化生产。
Special plastic steel combined mold structure for transformer substation equipment foundation and combined assembly method thereof
The invention discloses a special plastic steel combined mold structure for a transformer substation equipment foundation and a combined assembly method thereof, the mold structure comprises side mold plates and right-angle mold plates, the side mold plates and the right-angle mold plates are fixedly connected through inter-plate connecting pieces, and the stability and accuracy of the mold plates are ensured through auxiliary structures such as reinforcing plates, positioning pins and positioning holes. The connecting hole comprises a column section and a reducing section, and is matched with the lead screw, the sliding piece and the two connecting rods to achieve tight connection between the templates. In addition, the sliding piece is composed of the fixed sleeve and the rotary sleeve, and the distance between the templates can be adjusted through the two connecting rods. And the side templates have general standard specifications and dimensions, so that quick model selection and assembly are facilitated. The combined assembling method provided by the invention comprises the steps of template classification and coding, model selection and positioning, foundation paying-off and positioning, mold assembling, checking and rechecking and the like. Compared with the prior art, the repeated utilization rate and the construction efficiency of the formwork are remarkably improved, the pouring quality is guaranteed, the cost is reduced, and the formwork is suitable for standardized production of transformer substation equipment foundation pouring.
本发明公开了一种变电站设备基础专用塑钢组合模具结构及其组合装配方法,该模具结构包括侧模板和直角模板,通过板间连接件实现固定连接,并通过加强板、定位销和定位孔等辅助结构确保模板的稳定性和准确性。连接孔包括柱段和变径段,配合丝杆和滑动件及二连杆实现模板之间的紧密连接。此外,滑动件由固定套筒和旋转套筒组成,可通过二连杆调节模板间距。侧模板具有通用标准型规格尺寸,便于快速选型和组装。本发明提供的组合装配方法包括模板归类编码、选型定位、基础放线定位、模具组装及校核复查等步骤。与现有技术相比,本发明显著提高了模板的重复利用率和施工效率,保证了浇筑质量,降低了成本,适用于变电站设备基础浇筑的标准化生产。
Special plastic steel combined mold structure for transformer substation equipment foundation and combined assembly method thereof
变电站设备基础专用塑钢组合模具结构及其组合装配方法
YANG ZHI (Autor:in) / ZHU BANGSHENG (Autor:in) / LI TONGBIN (Autor:in) / LU JUN (Autor:in) / WANG XIAOMING (Autor:in) / TU GUOBIN (Autor:in) / TANG HAO (Autor:in) / YANG PENG (Autor:in) / QIN SEN (Autor:in) / GONG ZHENGANG (Autor:in)
03.12.2024
Patent
Elektronische Ressource
Chinesisch
Assembled combined switch cabinet foundation and transformer substation
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Steel-concrete combined assembly type main transformer foundation and construction method thereof
Europäisches Patentamt | 2023
|Semi-underground transformer substation with combined structure
Europäisches Patentamt | 2022
|