Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction frame and expressway square high pier cantilever construction method
The invention relates to the technical field of bridge pier scaffolds, and particularly discloses a scaffold and a cantilever construction method for a square high pier of an expressway. The construction frame comprises a construction frame main body, and the construction frame main body comprises a working platform; a climbing cone assembly used for connecting the working platform and the square pier is arranged at the working platform; a vertically arranged push plate is arranged above the working platform; the working platform is further provided with a pushing mechanism used for pushing the pushing plate to abut against the template. The construction method comprises the steps that S1, a foundation is poured; s2, pouring a first layer of square piers; and S3, other square piers are poured. According to the utility model, the working platform and the template are not interfered with each other and are separately hoisted, so that materials, tools and other stone fragments for pouring on the template and the working platform are not easy to fall off from an uninstalled template table surface, and an object strike accident is avoided.
本发明涉及桥墩施工架技术领域,具体地说,公开了一种施工架及高速公路方形高墩悬臂施工工法。施工架包括施工架主体,施工架主体包括工作平台;工作平台处设有用于连接工作平台与方墩的爬锥组件;工作平台上方设有竖直设置的推板;工作平台处还设有用于推动推板抵紧模板的推动机构。工法包括S1、浇筑地基;S2、第一层方墩浇筑;S3、其余方墩浇筑。能够使工作平台和模板之间互不干扰,并且分开吊运,使得模板与工作平台上的材料、工具和其它的浇筑用的石子碎片不容易从未安好的模板台面上掉落下来,避免造成物体打击事故。
Construction frame and expressway square high pier cantilever construction method
The invention relates to the technical field of bridge pier scaffolds, and particularly discloses a scaffold and a cantilever construction method for a square high pier of an expressway. The construction frame comprises a construction frame main body, and the construction frame main body comprises a working platform; a climbing cone assembly used for connecting the working platform and the square pier is arranged at the working platform; a vertically arranged push plate is arranged above the working platform; the working platform is further provided with a pushing mechanism used for pushing the pushing plate to abut against the template. The construction method comprises the steps that S1, a foundation is poured; s2, pouring a first layer of square piers; and S3, other square piers are poured. According to the utility model, the working platform and the template are not interfered with each other and are separately hoisted, so that materials, tools and other stone fragments for pouring on the template and the working platform are not easy to fall off from an uninstalled template table surface, and an object strike accident is avoided.
本发明涉及桥墩施工架技术领域,具体地说,公开了一种施工架及高速公路方形高墩悬臂施工工法。施工架包括施工架主体,施工架主体包括工作平台;工作平台处设有用于连接工作平台与方墩的爬锥组件;工作平台上方设有竖直设置的推板;工作平台处还设有用于推动推板抵紧模板的推动机构。工法包括S1、浇筑地基;S2、第一层方墩浇筑;S3、其余方墩浇筑。能够使工作平台和模板之间互不干扰,并且分开吊运,使得模板与工作平台上的材料、工具和其它的浇筑用的石子碎片不容易从未安好的模板台面上掉落下来,避免造成物体打击事故。
Construction frame and expressway square high pier cantilever construction method
一种施工架及高速公路方形高墩悬臂施工工法
ZHU YONGDONG (Autor:in) / SUN CHAOGANG (Autor:in) / YANG MING (Autor:in) / ZHAO YU (Autor:in) / LI DONG (Autor:in)
10.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Expressway bridge high pier hydraulic creeping formwork construction method
Europäisches Patentamt | 2024
|Concrete curing method for expressway high pier column over-form construction
Europäisches Patentamt | 2021
|Large-cantilever vase pier construction device and method using reinforcement cage jig frame
Europäisches Patentamt | 2023
|High-pier large-cantilever bent cap support and construction method
Europäisches Patentamt | 2023
|