High-pile wharf beam and slab erecting integrated equipment
The invention relates to the technical field of wharf construction, in particular to high-pile wharf beam and slab erection integrated equipment which comprises a cross beam, and a longitudinal beam capable of transversely moving is arranged at the top of the cross beam; the hoisting trolley can longitudinally move on the longitudinal beam, and the hoisting trolley is used for hoisting the beam plate; the supporting leg assembly supports the cross beam, a longitudinal moving rail is arranged at the bottom of the supporting leg assembly, and the supporting leg assembly longitudinally moves on the longitudinal moving rail; the two ends of the longitudinal beam are provided with cantilever sections, the cantilever sections extend to the longitudinal outer sides of the supporting leg assemblies, during beam lifting, the longitudinal moving rails are laid on the long-piled wharf, the supporting leg assemblies drive the cross beam to longitudinally move to the edge of the long-piled wharf on the longitudinal moving rails, then the crane carriage is moved to the cantilever sections, and the crane carriage can move to the outer side of the edge of the long-piled wharf; and the crane carriage can hoist the beam plate outside the long-piled wharf, so that the step of reversing the beam through equipment such as a gantry crane and a beam transporting vehicle is avoided, the construction procedure is simplified, and the construction efficiency of the long-piled wharf is improved.
本发明涉及码头施工技术领域,特别涉及高桩码头梁板架设一体设备,包括横梁,横梁顶部设置有能够进行横向移动的纵梁;起重小车,起重小车能够在纵梁上纵向移动,起重小车用于吊运梁板;支腿组件,支腿组件支撑横梁,支腿组件底部设置有纵移轨道,支腿组件在纵移轨道上纵向移动;纵梁两端具有悬臂段,悬臂段延伸至支腿组件的纵向外侧,在进行提梁时,纵移轨道铺设在高桩码头上,支腿组件带动横梁在纵移轨道上纵移至高桩码头边缘,再将起重小车移动至悬臂段处,使起重小车能够移动至高桩码头的边缘外侧,起重小车能够对高桩码头外的梁板进行吊装,避免了需要通过龙门吊、运梁车等设备进行倒梁的步骤,简化施工工序,加快了高桩码头的施工效率。
High-pile wharf beam and slab erecting integrated equipment
The invention relates to the technical field of wharf construction, in particular to high-pile wharf beam and slab erection integrated equipment which comprises a cross beam, and a longitudinal beam capable of transversely moving is arranged at the top of the cross beam; the hoisting trolley can longitudinally move on the longitudinal beam, and the hoisting trolley is used for hoisting the beam plate; the supporting leg assembly supports the cross beam, a longitudinal moving rail is arranged at the bottom of the supporting leg assembly, and the supporting leg assembly longitudinally moves on the longitudinal moving rail; the two ends of the longitudinal beam are provided with cantilever sections, the cantilever sections extend to the longitudinal outer sides of the supporting leg assemblies, during beam lifting, the longitudinal moving rails are laid on the long-piled wharf, the supporting leg assemblies drive the cross beam to longitudinally move to the edge of the long-piled wharf on the longitudinal moving rails, then the crane carriage is moved to the cantilever sections, and the crane carriage can move to the outer side of the edge of the long-piled wharf; and the crane carriage can hoist the beam plate outside the long-piled wharf, so that the step of reversing the beam through equipment such as a gantry crane and a beam transporting vehicle is avoided, the construction procedure is simplified, and the construction efficiency of the long-piled wharf is improved.
本发明涉及码头施工技术领域,特别涉及高桩码头梁板架设一体设备,包括横梁,横梁顶部设置有能够进行横向移动的纵梁;起重小车,起重小车能够在纵梁上纵向移动,起重小车用于吊运梁板;支腿组件,支腿组件支撑横梁,支腿组件底部设置有纵移轨道,支腿组件在纵移轨道上纵向移动;纵梁两端具有悬臂段,悬臂段延伸至支腿组件的纵向外侧,在进行提梁时,纵移轨道铺设在高桩码头上,支腿组件带动横梁在纵移轨道上纵移至高桩码头边缘,再将起重小车移动至悬臂段处,使起重小车能够移动至高桩码头的边缘外侧,起重小车能够对高桩码头外的梁板进行吊装,避免了需要通过龙门吊、运梁车等设备进行倒梁的步骤,简化施工工序,加快了高桩码头的施工效率。
High-pile wharf beam and slab erecting integrated equipment
一种高桩码头梁板架设一体设备
ZHOU HE (Autor:in) / LI MING (Autor:in) / YU JUNZHI (Autor:in) / HU ENCHUN (Autor:in) / BIAN ZHENHAI (Autor:in) / SONG GUANHONG (Autor:in) / LI MINGJIE (Autor:in) / HUANG ZHIXUAN (Autor:in)
13.12.2024
Patent
Elektronische Ressource
Chinesisch
High-pile beam slab type wharf top layer beam slab concrete construction process
Europäisches Patentamt | 2020
|High-pile beam-slab wharf structure with rear supporting piles
Europäisches Patentamt | 2021
|Earth pressure on an unloading-type sheet-pile: High-pile beam-slab wharf structure
Taylor & Francis Verlag | 2021
|Multifunctional high pile beam slab wharf physical experiment model and experiment method
Europäisches Patentamt | 2024
|Earth retaining method for rear shore connection of high-pile beam-slab wharf
Europäisches Patentamt | 2015
|