Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for subway engineering vehicle depot landscape ecological tree pool
The invention discloses a construction method for a subway engineering vehicle depot landscape ecological tree pool. The construction method comprises the following steps that S1, earth excavation is conducted; s2, laying waterproof geotechnical cloth and constructing perforated collecting pipes; s3, concrete foundation trench wall construction; s4, laying a bottom gravel drainage layer; s5, laying planting soil; s6, laying an upper gravel drainage layer; the method has the advantages of being good in soil fixation performance, high in water locking performance, high in bearing capacity, high in permeable rate, obvious in dust reduction effect, attractive, easy to clean and the like, the overall appearance effect of the outdoor landscape of the subway station depot is improved, and meanwhile the functions of preventing soil hardening and water accumulation, reducing dust raising pollution and the like are achieved.
本发明公开一种用于地铁工程车辆段景观生态树池的施工方法,包括如下步骤:S1、土方开挖;S2、防水土工布铺设及穿孔收集管施工;S3、混凝土基槽壁施工;S4、底部砾石排水层铺设;S5、种植土铺设;S6、上部砾石排水层铺设;S7、不锈钢成品箅子及树池侧石安装,本发明具有固土性好、锁水性强、高承载力、高透水率、减尘效果明显、美观易清理等特点,在提升地铁站车辆段室外景观整体观感效果的同时,还具有防止土壤板结、防止积水、减少扬尘污染等功能。
Construction method for subway engineering vehicle depot landscape ecological tree pool
The invention discloses a construction method for a subway engineering vehicle depot landscape ecological tree pool. The construction method comprises the following steps that S1, earth excavation is conducted; s2, laying waterproof geotechnical cloth and constructing perforated collecting pipes; s3, concrete foundation trench wall construction; s4, laying a bottom gravel drainage layer; s5, laying planting soil; s6, laying an upper gravel drainage layer; the method has the advantages of being good in soil fixation performance, high in water locking performance, high in bearing capacity, high in permeable rate, obvious in dust reduction effect, attractive, easy to clean and the like, the overall appearance effect of the outdoor landscape of the subway station depot is improved, and meanwhile the functions of preventing soil hardening and water accumulation, reducing dust raising pollution and the like are achieved.
本发明公开一种用于地铁工程车辆段景观生态树池的施工方法,包括如下步骤:S1、土方开挖;S2、防水土工布铺设及穿孔收集管施工;S3、混凝土基槽壁施工;S4、底部砾石排水层铺设;S5、种植土铺设;S6、上部砾石排水层铺设;S7、不锈钢成品箅子及树池侧石安装,本发明具有固土性好、锁水性强、高承载力、高透水率、减尘效果明显、美观易清理等特点,在提升地铁站车辆段室外景观整体观感效果的同时,还具有防止土壤板结、防止积水、减少扬尘污染等功能。
Construction method for subway engineering vehicle depot landscape ecological tree pool
一种用于地铁工程车辆段景观生态树池的施工方法
DING WANGDA (Autor:in) / LI LEI (Autor:in) / XU YINBO (Autor:in) / GUO FUJIAN (Autor:in) / ZHANG XIAOPENG (Autor:in) / DENG XIANGZHEN (Autor:in) / LIU XIAOFEI (Autor:in) / WU XIAOJUN (Autor:in) / LIU CHANGQUAN (Autor:in) / JI FEI (Autor:in)
20.12.2024
Patent
Elektronische Ressource
Chinesisch
Upper cover subway vehicle depot steel reinforced concrete construction process
Europäisches Patentamt | 2020
|Large-section beam construction method of subway depot upper cover building
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|