High-rise building steel structure corridor and construction method thereof
The invention relates to the technical field of corridors, and discloses a high-rise building steel structure corridor which comprises a fixing plate and two lifting shells symmetrically distributed front and back, lifting rails symmetrically distributed front and back are fixedly connected to the bottom of the fixing plate, and tooth blocks vertically distributed at equal intervals are arranged in the lifting rails. Driving assemblies which extend to the opposite sides of the lifting shells and are matched with the tooth blocks are arranged in the lifting shells. The high-rise building steel structure corridor has the advantages of being convenient to transport, install, adjust the height and the like, and solves the problems that according to a current common corridor installation mode, hoisting outside a building is needed through a tower crane, materials need to be manually transported in the building as a main body, the material transporting mode is troublesome, potential safety hazards can be caused in the manual transporting process, and the construction efficiency is high. The height of the corridor cannot be freely adjusted, and the corridor cannot be recycled after being used.
本发明涉及连廊技术领域,且公开了一种高层建筑钢结构连廊,包括固定板和数量为两个且呈前后对称分布的升降壳,所述固定板的底部固定连接有呈前后对称分布的升降轨道,所述升降轨道的内部设有呈竖向等距离分布的齿块,所述升降壳的内部均设有延伸至其相背一侧且与齿块相适配的驱动组件。该高层建筑钢结构连廊,具备便于运输以及安装与调节高度等优点,解决了目前常见的连廊安装方式大都需要通过塔吊在楼外吊起以及人工在楼内运输材料为主体,这种运料方式不仅麻烦,还会在人工运输的过程中造成安全隐患,连廊无法自由调节高度,使用完成后无法回收的问题。
High-rise building steel structure corridor and construction method thereof
The invention relates to the technical field of corridors, and discloses a high-rise building steel structure corridor which comprises a fixing plate and two lifting shells symmetrically distributed front and back, lifting rails symmetrically distributed front and back are fixedly connected to the bottom of the fixing plate, and tooth blocks vertically distributed at equal intervals are arranged in the lifting rails. Driving assemblies which extend to the opposite sides of the lifting shells and are matched with the tooth blocks are arranged in the lifting shells. The high-rise building steel structure corridor has the advantages of being convenient to transport, install, adjust the height and the like, and solves the problems that according to a current common corridor installation mode, hoisting outside a building is needed through a tower crane, materials need to be manually transported in the building as a main body, the material transporting mode is troublesome, potential safety hazards can be caused in the manual transporting process, and the construction efficiency is high. The height of the corridor cannot be freely adjusted, and the corridor cannot be recycled after being used.
本发明涉及连廊技术领域,且公开了一种高层建筑钢结构连廊,包括固定板和数量为两个且呈前后对称分布的升降壳,所述固定板的底部固定连接有呈前后对称分布的升降轨道,所述升降轨道的内部设有呈竖向等距离分布的齿块,所述升降壳的内部均设有延伸至其相背一侧且与齿块相适配的驱动组件。该高层建筑钢结构连廊,具备便于运输以及安装与调节高度等优点,解决了目前常见的连廊安装方式大都需要通过塔吊在楼外吊起以及人工在楼内运输材料为主体,这种运料方式不仅麻烦,还会在人工运输的过程中造成安全隐患,连廊无法自由调节高度,使用完成后无法回收的问题。
High-rise building steel structure corridor and construction method thereof
一种高层建筑钢结构连廊及其施工方法
WANG YUNJIE (Autor:in) / WU QIANG (Autor:in) / WANG HONGWEI (Autor:in) / WANG HUIJUAN (Autor:in) / CHANG JIANG (Autor:in)
24.12.2024
Patent
Elektronische Ressource
Chinesisch
Construction method of super high-rise aerial corridor structure
Europäisches Patentamt | 2020
|High-rise building steel structure and construction method thereof
Europäisches Patentamt | 2024
|High-rise building corridor structure with rapid escape function
Europäisches Patentamt | 2024
|