Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Semi-underground material warehouse and material warehouse design method
The invention relates to a semi-underground material warehouse and a material warehouse design method.The semi-underground material warehouse comprises a warehouse body which can be partially embedded underground, a material storage cavity is formed in the warehouse body and is divided into a plurality of cavities by partition walls, the multiple partition walls are arranged in the length direction of the warehouse body at intervals, and the partition walls are arranged in the warehouse body at intervals; and a plurality of discharge ports communicated with the storage cavity are formed in the bottom of the bin body at intervals in the length direction of the bin body. According to the semi-underground material warehouse and the material warehouse design method, the problems that an existing material warehouse foundation treatment project amount is large, and the foundation settlement deformation amount is large are solved.
本发明涉及一种半地下式料库及料库设计方法,所述半地下式料库包括可部分嵌入地下的仓体,所述仓体内具有储料腔,所述储料腔由隔墙分隔成多个腔室,所述隔墙设有多个,且所述多个隔墙沿所述仓体的长度方向间隔设置,所述仓体的底部沿其长度方向间隔布设有多个与所述储料腔连通的出料口。本发明提供的半地下式料库及料库设计方法解决了现有的料库地基处理工程量大且地基沉降变形量大的问题。
Semi-underground material warehouse and material warehouse design method
The invention relates to a semi-underground material warehouse and a material warehouse design method.The semi-underground material warehouse comprises a warehouse body which can be partially embedded underground, a material storage cavity is formed in the warehouse body and is divided into a plurality of cavities by partition walls, the multiple partition walls are arranged in the length direction of the warehouse body at intervals, and the partition walls are arranged in the warehouse body at intervals; and a plurality of discharge ports communicated with the storage cavity are formed in the bottom of the bin body at intervals in the length direction of the bin body. According to the semi-underground material warehouse and the material warehouse design method, the problems that an existing material warehouse foundation treatment project amount is large, and the foundation settlement deformation amount is large are solved.
本发明涉及一种半地下式料库及料库设计方法,所述半地下式料库包括可部分嵌入地下的仓体,所述仓体内具有储料腔,所述储料腔由隔墙分隔成多个腔室,所述隔墙设有多个,且所述多个隔墙沿所述仓体的长度方向间隔设置,所述仓体的底部沿其长度方向间隔布设有多个与所述储料腔连通的出料口。本发明提供的半地下式料库及料库设计方法解决了现有的料库地基处理工程量大且地基沉降变形量大的问题。
Semi-underground material warehouse and material warehouse design method
一种半地下式料库及料库设计方法
CHEN WEI (Autor:in) / WEN TIEJUN (Autor:in) / YUAN DONGBING (Autor:in) / CHEN PENG (Autor:in) / HU QING (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
B65G
TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
,
Transport- oder Lagervorrichtungen, z.B. Förderer zum Laden oder Abladen
/
E02D
FOUNDATIONS
,
Gründungen
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Europäisches Patentamt | 2021
|Underground warehouse excavated in granite
Engineering Index Backfile | 1957
|Europäisches Patentamt | 2022
|