Deep and large foundation pit inter-pile plate construction device and inter-pile plate construction method
The invention discloses a deep and large foundation pit inter-pile plate construction device and method, and belongs to the technical field of inter-pile plate construction.The inter-pile plate construction device comprises a formwork assembly, the formwork assembly comprises a longitudinally-arranged inter-pile plate and a horizontally-arranged bottom plate, and a pouring space M is formed among the inter-pile plate, the bottom plate and two adjacent anti-slide piles A; the pouring space M is used for accommodating concrete; m first pouring openings are formed in the front view face of the inter-pile plate, m is larger than or equal to 2, the n first pouring openings are used for pouring concrete, vibrating rods extend into the remaining first pouring openings, and m is larger than n; and a second pouring opening is further formed in the top of the inter-pile plate, and when the height of concrete in the pouring space M reaches the first pouring opening, the first pouring opening is blocked, and pouring is conducted through the second pouring opening. And pouring is conducted through the first pouring openings, and pouring and vibrating are conducted alternately among the multiple first pouring openings, so that concrete is evenly distributed.
本发明公开了一种深大基坑桩间板施工装置及桩间板施工方法,属于桩间板施工技术领域,其中,桩间板施工装置包括模板组件,包括纵向设置的桩间板以及水平设置的底板,桩间板、底板和相邻的两个抗滑桩A之间形成浇筑空间M,浇筑空间M用于容纳混凝土;桩间板的正视面上设有第一浇筑口,第一浇筑口设有m个,m≥2,其中n个第一浇筑口用于浇筑混凝土并且剩余的第一浇筑口内用于伸入振捣棒,m>n;桩间板的顶部还开设有第二浇筑口,当浇筑空间M内的混凝土高度达到第一浇筑口处时,封堵第一浇筑口并改由第二浇筑口进行浇筑。先通过第一浇筑口进行浇筑,选择在多个第一浇筑口之间的交替浇筑、振捣,使混凝土均匀分布。
Deep and large foundation pit inter-pile plate construction device and inter-pile plate construction method
The invention discloses a deep and large foundation pit inter-pile plate construction device and method, and belongs to the technical field of inter-pile plate construction.The inter-pile plate construction device comprises a formwork assembly, the formwork assembly comprises a longitudinally-arranged inter-pile plate and a horizontally-arranged bottom plate, and a pouring space M is formed among the inter-pile plate, the bottom plate and two adjacent anti-slide piles A; the pouring space M is used for accommodating concrete; m first pouring openings are formed in the front view face of the inter-pile plate, m is larger than or equal to 2, the n first pouring openings are used for pouring concrete, vibrating rods extend into the remaining first pouring openings, and m is larger than n; and a second pouring opening is further formed in the top of the inter-pile plate, and when the height of concrete in the pouring space M reaches the first pouring opening, the first pouring opening is blocked, and pouring is conducted through the second pouring opening. And pouring is conducted through the first pouring openings, and pouring and vibrating are conducted alternately among the multiple first pouring openings, so that concrete is evenly distributed.
本发明公开了一种深大基坑桩间板施工装置及桩间板施工方法,属于桩间板施工技术领域,其中,桩间板施工装置包括模板组件,包括纵向设置的桩间板以及水平设置的底板,桩间板、底板和相邻的两个抗滑桩A之间形成浇筑空间M,浇筑空间M用于容纳混凝土;桩间板的正视面上设有第一浇筑口,第一浇筑口设有m个,m≥2,其中n个第一浇筑口用于浇筑混凝土并且剩余的第一浇筑口内用于伸入振捣棒,m>n;桩间板的顶部还开设有第二浇筑口,当浇筑空间M内的混凝土高度达到第一浇筑口处时,封堵第一浇筑口并改由第二浇筑口进行浇筑。先通过第一浇筑口进行浇筑,选择在多个第一浇筑口之间的交替浇筑、振捣,使混凝土均匀分布。
Deep and large foundation pit inter-pile plate construction device and inter-pile plate construction method
一种深大基坑桩间板施工装置及桩间板施工方法
SHI LEI (Autor:in) / LIN YIN (Autor:in) / SHIN SOOK (Autor:in) / LIU YANG (Autor:in) / XIA GAO (Autor:in) / LI AIHUA (Autor:in) / DING XIBIN (Autor:in) / FENG WENXI (Autor:in) / ZENG SHIHONG (Autor:in) / LUO CHENGLONG (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Inter-pile soil layer cleaning device and inter-pile soil layer cleaning construction method
Europäisches Patentamt | 2023
|