Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slope treatment construction method
The invention relates to the technical field of stone side slope treatment, in particular to a side slope treatment construction method which comprises the following steps: S1, side slope investigation: carrying out geological investigation on a side slope area; s2, a slope stress model is established, a complete design scheme is formulated, and the project amount, the construction process and the technical requirements are determined; s3, rock excavation is conducted, stepped layered excavation is adopted, and slope cutting and leveling are conducted on the side slope; s3, construction of a drainage system: excavating an intercepting ditch at the top of the slope and excavating a drainage ditch at the toe of the slope; and S4, anchoring construction. The method has the effect of improving the stability of the side slope.
本申请涉及石方边坡治理的技术领域,尤其是涉及一种边坡治理施工方法,包括以下步骤:S1:边坡勘察,对边坡区域进行地质勘察;S2:建立边坡受力模型,制定完整设计方案,确定工程量、施工工艺及技术要求;S3:石方开挖,采用阶梯式分层开挖,对边坡进行削坡整平;S3:排水系统施工,包括在坡顶挖掘截水沟,坡脚挖掘排水沟;S4:锚固施工。本申请具有提高边坡的稳定性的效果。
Slope treatment construction method
The invention relates to the technical field of stone side slope treatment, in particular to a side slope treatment construction method which comprises the following steps: S1, side slope investigation: carrying out geological investigation on a side slope area; s2, a slope stress model is established, a complete design scheme is formulated, and the project amount, the construction process and the technical requirements are determined; s3, rock excavation is conducted, stepped layered excavation is adopted, and slope cutting and leveling are conducted on the side slope; s3, construction of a drainage system: excavating an intercepting ditch at the top of the slope and excavating a drainage ditch at the toe of the slope; and S4, anchoring construction. The method has the effect of improving the stability of the side slope.
本申请涉及石方边坡治理的技术领域,尤其是涉及一种边坡治理施工方法,包括以下步骤:S1:边坡勘察,对边坡区域进行地质勘察;S2:建立边坡受力模型,制定完整设计方案,确定工程量、施工工艺及技术要求;S3:石方开挖,采用阶梯式分层开挖,对边坡进行削坡整平;S3:排水系统施工,包括在坡顶挖掘截水沟,坡脚挖掘排水沟;S4:锚固施工。本申请具有提高边坡的稳定性的效果。
Slope treatment construction method
一种边坡治理施工方法
WANG ZHEN (Autor:in) / YANG CHAO (Autor:in) / LU ZIWEN (Autor:in) / YU XIANGDONG (Autor:in) / ZHAO YU (Autor:in) / CHENG WEIHUA (Autor:in) / YAO YUCHEN (Autor:in) / SU TENGFEI (Autor:in) / YANG CHEN (Autor:in) / HOU LIN (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
Slope supporting structure for slope treatment and construction method thereof
Europäisches Patentamt | 2024
|Construction treatment method of highway cutting high slope
Europäisches Patentamt | 2024
|