Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water retaining weir for water conservancy construction
The invention relates to a water retaining weir for water conservancy construction, which comprises a first cofferdam plate, a second cofferdam plate and a third cofferdam plate, and the cofferdam plates are respectively and vertically inserted on corresponding bases; inserting sleeves are arranged on the inner sides of the first cofferdam plate, the second cofferdam plate and the third cofferdam plate, inserting rods are inserted into the inserting sleeves, inserting holes are formed in the bases, the inserting rods are inserted into the inserting holes, a first wedge block and a first wedge groove are formed in the left end and the right end of the first cofferdam plate respectively, and a second wedge groove and a third wedge groove are formed in the inner side of the first cofferdam plate. A fourth wedge groove and a second wedge block are arranged at the left end and the right end of the second cofferdam plate respectively, a fifth wedge groove and a sixth wedge groove are formed in the inner side of the second cofferdam plate, and a third wedge block and a fourth wedge block are arranged at the left end and the right end of the third cofferdam plate respectively. The first cofferdam plates, the second cofferdam plates and the third cofferdam plates can define a rectangular frame through matching of the corresponding wedge blocks and the wedge grooves between the adjacent cofferdam plates, water retaining weirs of different sizes can be defined by selecting different numbers of cofferdam plates, use is flexible, and applicability is higher.
本发明涉及一种水利施工用挡水堰,包括第一围堰板、第二围堰板、第三围堰板,各围堰板分别竖向插装在对应底座上;第一围堰板、第二围堰板、第三围堰板的内侧均设有插接套,供插杆进行插装,各底座上均设有插孔,供插杆插接,第一围堰板的左右两端分别设有第一楔块、第一楔槽,第一围堰板内侧设有第二楔槽、第三楔槽,第二围堰板左右两端分别设有第四楔槽、第二楔块,第二围堰板内侧设有第五楔槽、第六楔槽,第三围堰板的左右两端分别设有第三楔块、第四楔块,各第一围堰板、第二围堰板、第三围堰板依靠相邻围堰板间的相应楔块、楔槽的配合能够围成一矩形框架,选择不同数量的围堰板则能围成不同大小的挡水堰,使用灵活,适用性更强。
Water retaining weir for water conservancy construction
The invention relates to a water retaining weir for water conservancy construction, which comprises a first cofferdam plate, a second cofferdam plate and a third cofferdam plate, and the cofferdam plates are respectively and vertically inserted on corresponding bases; inserting sleeves are arranged on the inner sides of the first cofferdam plate, the second cofferdam plate and the third cofferdam plate, inserting rods are inserted into the inserting sleeves, inserting holes are formed in the bases, the inserting rods are inserted into the inserting holes, a first wedge block and a first wedge groove are formed in the left end and the right end of the first cofferdam plate respectively, and a second wedge groove and a third wedge groove are formed in the inner side of the first cofferdam plate. A fourth wedge groove and a second wedge block are arranged at the left end and the right end of the second cofferdam plate respectively, a fifth wedge groove and a sixth wedge groove are formed in the inner side of the second cofferdam plate, and a third wedge block and a fourth wedge block are arranged at the left end and the right end of the third cofferdam plate respectively. The first cofferdam plates, the second cofferdam plates and the third cofferdam plates can define a rectangular frame through matching of the corresponding wedge blocks and the wedge grooves between the adjacent cofferdam plates, water retaining weirs of different sizes can be defined by selecting different numbers of cofferdam plates, use is flexible, and applicability is higher.
本发明涉及一种水利施工用挡水堰,包括第一围堰板、第二围堰板、第三围堰板,各围堰板分别竖向插装在对应底座上;第一围堰板、第二围堰板、第三围堰板的内侧均设有插接套,供插杆进行插装,各底座上均设有插孔,供插杆插接,第一围堰板的左右两端分别设有第一楔块、第一楔槽,第一围堰板内侧设有第二楔槽、第三楔槽,第二围堰板左右两端分别设有第四楔槽、第二楔块,第二围堰板内侧设有第五楔槽、第六楔槽,第三围堰板的左右两端分别设有第三楔块、第四楔块,各第一围堰板、第二围堰板、第三围堰板依靠相邻围堰板间的相应楔块、楔槽的配合能够围成一矩形框架,选择不同数量的围堰板则能围成不同大小的挡水堰,使用灵活,适用性更强。
Water retaining weir for water conservancy construction
一种水利施工用挡水堰
LI QINGWEI (Autor:in) / SHI YIXIN (Autor:in) / XING YAPENG (Autor:in) / WANG XUEDONG (Autor:in) / ZHANG YANGUO (Autor:in) / GAO XIANGLI (Autor:in)
27.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Water retaining device for water conservancy project construction
Europäisches Patentamt | 2021
|Assembled water conservancy project construction water retaining device
Europäisches Patentamt | 2020
|Retaining dam for river water conservancy construction
Europäisches Patentamt | 2024
|Retaining dam for river water conservancy construction
Europäisches Patentamt | 2024
|