Spiral stair prefabricated part and preparation method thereof
The invention belongs to the technical field of spiral stair prefabricated part preparation, and discloses a spiral stair prefabricated part preparation method which is applied to prefabricating equipment and comprises the following preparation processes that S1, a steel bar frame is laid in a mold assembly, the mold assembly is rotated to be vertical, and an execution assembly is put down; s2, concrete pouring equipment is utilized, concrete is poured into the mold assembly through an execution assembly, the height of the concrete can reach the interior of a height judgment assembly along with increase of the height of the concrete in the mold assembly, the height judgment assembly is triggered, and the interior of the mold assembly can be filled at the moment; and S3, the pouring box and the straight and flat screen plate are moved, and the straight and flat screen plate is moved to the position above the mold assembly. By means of the design, it can be guaranteed that after concrete pouring is completed, the radian to which the concrete in the fixed formwork and the movable formwork moves relative to the tops of the fixed formwork and the movable formwork is kept, and the problem that the radian is different after forming due to active leveling of the concrete is solved.
本发明属于旋转楼梯预制件制备技术领域,且公开了一种旋转楼梯预制件的制备方法,其应用于预制设备,制备流程如下:S1:在模具组件的内部铺设钢筋架,将模具组件转动竖直,下放执行组件;S2:利用混凝土浇筑设备,通过执行组件向模具组件的内部浇筑混凝土,随着模具组件内部的混凝土的高度增加,混凝土高度会到达高度判定组件内部,并触发高度判定组件,此时模具组件的内部将会被填满;S3:移动灌注箱和直平网板将直平网板移动至模具组件的上方。该设计可以保障混凝土在浇筑完成后,固定模板和移动模板内部的混凝土保持与固定模板和移动模板顶部移至的弧度,避免混凝土主动流平导致成型后弧度存在差异的问题。
Spiral stair prefabricated part and preparation method thereof
The invention belongs to the technical field of spiral stair prefabricated part preparation, and discloses a spiral stair prefabricated part preparation method which is applied to prefabricating equipment and comprises the following preparation processes that S1, a steel bar frame is laid in a mold assembly, the mold assembly is rotated to be vertical, and an execution assembly is put down; s2, concrete pouring equipment is utilized, concrete is poured into the mold assembly through an execution assembly, the height of the concrete can reach the interior of a height judgment assembly along with increase of the height of the concrete in the mold assembly, the height judgment assembly is triggered, and the interior of the mold assembly can be filled at the moment; and S3, the pouring box and the straight and flat screen plate are moved, and the straight and flat screen plate is moved to the position above the mold assembly. By means of the design, it can be guaranteed that after concrete pouring is completed, the radian to which the concrete in the fixed formwork and the movable formwork moves relative to the tops of the fixed formwork and the movable formwork is kept, and the problem that the radian is different after forming due to active leveling of the concrete is solved.
本发明属于旋转楼梯预制件制备技术领域,且公开了一种旋转楼梯预制件的制备方法,其应用于预制设备,制备流程如下:S1:在模具组件的内部铺设钢筋架,将模具组件转动竖直,下放执行组件;S2:利用混凝土浇筑设备,通过执行组件向模具组件的内部浇筑混凝土,随着模具组件内部的混凝土的高度增加,混凝土高度会到达高度判定组件内部,并触发高度判定组件,此时模具组件的内部将会被填满;S3:移动灌注箱和直平网板将直平网板移动至模具组件的上方。该设计可以保障混凝土在浇筑完成后,固定模板和移动模板内部的混凝土保持与固定模板和移动模板顶部移至的弧度,避免混凝土主动流平导致成型后弧度存在差异的问题。
Spiral stair prefabricated part and preparation method thereof
一种旋转楼梯预制件及其制备方法
HU HAN (Autor:in) / CHEN HAIWANG (Autor:in)
31.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden