Modularized assembly type double-row HU construction method pile supporting structure and construction method thereof
The modular assembly type double-row HU construction method pile supporting structure comprises a front row of parallel HU construction method piles and a rear row of parallel HU construction method piles, each row of HU construction method piles is composed of H-shaped steel piles and U-shaped steel sheet piles, the U-shaped steel sheet piles are meshed with one another through locking openings to form a continuous steel sheet pile wall, the H-shaped steel piles are inserted between the steel sheet pile walls formed by the U-shaped steel sheet piles, and the H-shaped steel piles and the U-shaped steel sheet piles are arranged in parallel. Top beam outer side steel plates are arranged on the outer sides of the tops of the H-shaped steel piles, top beam inner side steel plates and connecting beam modules are arranged on the inner sides of the tops of the front row of H-shaped steel piles and the inner sides of the tops of the rear row of H-shaped steel piles, and soil between piles of the double-row steel plate pile wall and soil in a passive area of the foundation pit are reinforced through double-shaft or three-shaft cement mixing piles. The double-row HU construction method pile enclosure structure is composed of the front row of parallel HU construction method piles, the rear row of parallel HU construction method piles, the prefabricated assembly type top beams, the connecting beams and other main components, the overall stability and bearing capacity of the structure are enhanced, and the double-row HU construction method pile enclosure structure has the advantages of being good in water stopping effect, flexible and rapid in construction, economical, environmentally friendly and the like.
一种模块化拼装式双排HU工法桩支护结构及其施工方法,包括前后两排平行的HU工法桩,每排的HU工法桩由H型钢桩和U型钢板桩组成,U型钢板桩通过锁口互相咬合形成一道连续的钢板桩墙,H型钢桩插在U型钢板桩形成的钢板桩墙之间,在H型钢桩的顶部外侧设置冠梁外侧钢板,前后排H型钢桩的顶部内侧设置冠梁内侧钢板与连系梁模块,在双排钢板桩墙的桩间土和基坑被动区土体间通过双轴或三轴水泥搅拌桩加固。本发明的双排HU工法桩围护结构,由前后两排平行的HU工法桩、预制拼装式冠梁、连系梁等主要构件组成,增强了结构整体稳定性和承载能力,具有止水效果好、施工灵活快速和经济环保等优点。
Modularized assembly type double-row HU construction method pile supporting structure and construction method thereof
The modular assembly type double-row HU construction method pile supporting structure comprises a front row of parallel HU construction method piles and a rear row of parallel HU construction method piles, each row of HU construction method piles is composed of H-shaped steel piles and U-shaped steel sheet piles, the U-shaped steel sheet piles are meshed with one another through locking openings to form a continuous steel sheet pile wall, the H-shaped steel piles are inserted between the steel sheet pile walls formed by the U-shaped steel sheet piles, and the H-shaped steel piles and the U-shaped steel sheet piles are arranged in parallel. Top beam outer side steel plates are arranged on the outer sides of the tops of the H-shaped steel piles, top beam inner side steel plates and connecting beam modules are arranged on the inner sides of the tops of the front row of H-shaped steel piles and the inner sides of the tops of the rear row of H-shaped steel piles, and soil between piles of the double-row steel plate pile wall and soil in a passive area of the foundation pit are reinforced through double-shaft or three-shaft cement mixing piles. The double-row HU construction method pile enclosure structure is composed of the front row of parallel HU construction method piles, the rear row of parallel HU construction method piles, the prefabricated assembly type top beams, the connecting beams and other main components, the overall stability and bearing capacity of the structure are enhanced, and the double-row HU construction method pile enclosure structure has the advantages of being good in water stopping effect, flexible and rapid in construction, economical, environmentally friendly and the like.
一种模块化拼装式双排HU工法桩支护结构及其施工方法,包括前后两排平行的HU工法桩,每排的HU工法桩由H型钢桩和U型钢板桩组成,U型钢板桩通过锁口互相咬合形成一道连续的钢板桩墙,H型钢桩插在U型钢板桩形成的钢板桩墙之间,在H型钢桩的顶部外侧设置冠梁外侧钢板,前后排H型钢桩的顶部内侧设置冠梁内侧钢板与连系梁模块,在双排钢板桩墙的桩间土和基坑被动区土体间通过双轴或三轴水泥搅拌桩加固。本发明的双排HU工法桩围护结构,由前后两排平行的HU工法桩、预制拼装式冠梁、连系梁等主要构件组成,增强了结构整体稳定性和承载能力,具有止水效果好、施工灵活快速和经济环保等优点。
Modularized assembly type double-row HU construction method pile supporting structure and construction method thereof
一种模块化拼装式双排HU工法桩支护结构及其施工方法
XIAO YONGGANG (Autor:in) / LIU XIAOMIN (Autor:in) / ZHOU JUNLONG (Autor:in) / HUANG KEQI (Autor:in) / SONG LIWEI (Autor:in) / SHI YIAN (Autor:in) / HE XIAOPEI (Autor:in) / MA FUJUN (Autor:in)
31.12.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Modularized assembly type high-pile wharf structure, construction method and monitoring system
Europäisches Patentamt | 2023
|Modularized slope supporting structure and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|