Hydropower station ground workshop superstructure and installation method
The invention discloses a superstructure of a hydropower station ground workshop. The superstructure comprises a steel structure roof system, a steel structure crane beam and a steel structure bent frame. The steel structure roof system comprises a steel roof panel and a steel net rack, the steel roof panel is fixedly connected with the steel net rack through screws, the steel structure crane beam comprises a steel crane beam and a steel reinforcing plate, the steel reinforcing plate and the steel crane beam are welded and fixed to be used for reinforcing the bearing capacity of the steel crane beam, and the steel structure bent frame comprises a steel bent frame, a steel column and a steel connecting beam. The multiple steel bent frames and the steel columns are fixedly connected with steel structure bent frame column foot bolts embedded in bedrock or mass concrete on the lower portion of a hydropower station plant, the multiple steel columns are fixedly connected to the lower ends of the two steel crane beams through bolts, and one sides of the multiple steel columns fixedly connected with one steel crane beam are fixedly welded to one ends of the multiple steel connecting beams. The problems that in the technical field of hydropower engineering application, in the construction process of upper structure reinforced concrete of a traditional hydropower station ground workshop, the construction efficiency is low, and investment is large are solved.
本发明公开了一种水电站地面厂房上部结构包括钢结构屋面系、钢结构吊车梁及钢结构排架。钢结构屋面系包括钢屋面板及钢网架,钢屋面板通过螺钉与钢网架固定连接,钢结构吊车梁包括钢吊车梁以及钢补强板,钢补强板与钢吊车梁焊接固定用于加强钢吊车梁的承载能力,钢结构排架包括钢排架、钢柱以及钢连系梁,多个钢排架及钢柱与水电站厂房下部基岩或大体积混凝土中埋设的钢结构排架柱脚螺栓固定连接,两根钢吊车梁的下端螺栓固定连接有多个钢柱,与其中一根钢吊车梁固定连接的多个钢柱的一侧与多个钢连系梁的一端焊接固定。该发明解决了水电工程应用技术领域中传统水电站地面厂房上部结构钢筋混凝土施工过程中存在的施工效率低、投资较大等问题。
Hydropower station ground workshop superstructure and installation method
The invention discloses a superstructure of a hydropower station ground workshop. The superstructure comprises a steel structure roof system, a steel structure crane beam and a steel structure bent frame. The steel structure roof system comprises a steel roof panel and a steel net rack, the steel roof panel is fixedly connected with the steel net rack through screws, the steel structure crane beam comprises a steel crane beam and a steel reinforcing plate, the steel reinforcing plate and the steel crane beam are welded and fixed to be used for reinforcing the bearing capacity of the steel crane beam, and the steel structure bent frame comprises a steel bent frame, a steel column and a steel connecting beam. The multiple steel bent frames and the steel columns are fixedly connected with steel structure bent frame column foot bolts embedded in bedrock or mass concrete on the lower portion of a hydropower station plant, the multiple steel columns are fixedly connected to the lower ends of the two steel crane beams through bolts, and one sides of the multiple steel columns fixedly connected with one steel crane beam are fixedly welded to one ends of the multiple steel connecting beams. The problems that in the technical field of hydropower engineering application, in the construction process of upper structure reinforced concrete of a traditional hydropower station ground workshop, the construction efficiency is low, and investment is large are solved.
本发明公开了一种水电站地面厂房上部结构包括钢结构屋面系、钢结构吊车梁及钢结构排架。钢结构屋面系包括钢屋面板及钢网架,钢屋面板通过螺钉与钢网架固定连接,钢结构吊车梁包括钢吊车梁以及钢补强板,钢补强板与钢吊车梁焊接固定用于加强钢吊车梁的承载能力,钢结构排架包括钢排架、钢柱以及钢连系梁,多个钢排架及钢柱与水电站厂房下部基岩或大体积混凝土中埋设的钢结构排架柱脚螺栓固定连接,两根钢吊车梁的下端螺栓固定连接有多个钢柱,与其中一根钢吊车梁固定连接的多个钢柱的一侧与多个钢连系梁的一端焊接固定。该发明解决了水电工程应用技术领域中传统水电站地面厂房上部结构钢筋混凝土施工过程中存在的施工效率低、投资较大等问题。
Hydropower station ground workshop superstructure and installation method
一种水电站地面厂房上部结构及安装方法
WEI QIANG (Autor:in) / LU ZHEN (Autor:in) / ZHANG CHENG (Autor:in) / LIN ZHIHUA (Autor:in) / XU YUNQUAN (Autor:in) / YANG YONGJIE (Autor:in)
07.01.2025
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|